Uptown Campus Alert Center
Current Alerts
Humanities Building - COVID19 Access |
Project Description / Scope: As a reminder, any University-issued keys for non-residential campus spaces need to be returned to the Facilities Management Customer Service Center in room B 0043. Due to increased security measures resulting from COVID-19, UAlbany ID Card access to the Humanities Building is required to reach room B 0043. If you have University issued keys that need to be returned, and do not have UAlbany ID Card access to the Humanities Building, please go to https://www.albany.edu/facilities/documents/COVID-19-Temporary-Key-Surrender-Form.pdf, print and complete the form, place in an envelope with any keys to be returned, write on the envelope ‘CSC Humanities Bldg Room B 0043’, and drop the envelope off in a box on the counter in UPD’s lobby. |
Estimated Start: 11/10/2020 12:00 AM |
Estimated End: TBD |
More Details |
Physical Education Gym Renovation/Pool Infill - Atlantic Testing Labs. – HAZMAT Testing Final Design Walk-Through |
Project Description / Scope: Renovate Gym and Pool Infill – PE Building; HAZMAT Testing Final Design Walk-Through Gymnasium: Verify and Survey locations of hazardous material testing performed in the June Pool: Verify and Survey locations of hazardous material testing performed in the June Pool Mechanical Equipment Room B-071: Verify and Survey locations of hazardous material testing performed in the October |
Estimated Start: 11/16/2020 10:30 AM |
Estimated End: 11/16/2020 2:00 PM |
More Details |
Massry School of Business - Smoke Purge System Testing |
Project Description / Scope: System test of the emergency smoke purge system by JCI. |
Estimated Start: 11/18/2020 8:00 AM |
Estimated End: 11/18/2020 11:00 AM |
More Details |
University Hall - Smoke Purge System Testing |
Project Description / Scope: System test of the emergency smoke purge system by JCI. |
Estimated Start: 11/14/2020 7:00 AM |
Estimated End: 11/14/2020 12:00 PM |
More Details |
Taconic - Renovate Building #35 - Taconic |
Project Description / Scope: On Monday November 2nd, the renovation of the Taconic Building will begin with the contractor starting to mobilize and install temporary construction barriers and work zone signage. The general scope of the renovation includes; a. Abatement, selective demolition, and partial renovation of interior spaces including, but not limited to, offices, classrooms, and meeting rooms b. Abatement and full renovation of toilet rooms c. Abatement and replacement of exterior windows d. Replacement of roofing membrane e. Mechanical, electrical, telecommunications, and audiovisual system upgrades. |
Estimated Start: 11/2/2020 7:00 AM |
Estimated End: 2/25/2022 12:00 AM |
More Details |
Service Building B / Power Plant - Southbound Lane Closure |
Project Description / Scope: The southbound lane of University Drive West in front of the Campus Power Plant will be temporary closed to traffic to permit the removal of an old cooling tower located in front of the Plant. This lane closure will occur during the following periods: Saturday, October 24th, from 7:00 AM to 5:00 PM & Sunday, October 25th, from 7:00 AM to 5:00 PM. The contractor performing this work will have flag persons to control the single lane traffic through this section of University Drive West during these work periods. |
Estimated Start: 10/24/2020 7:00 AM |
Estimated End: 10/25/2020 5:00 PM |
More Details |
Massry School of Business - Heat and Hot Water Shutdown |
Project Description / Scope: Heat and hot water will be shut off due to emergency repair for heating supply pipe to Massry School of Business tunnel, heat and hot water should be restored by end of day on Friday 10/16/2020 |
Estimated Start: 10/16/2020 7:00 AM |
Estimated End: 10/16/2020 3:00 PM |
More Details |
Physical Education - Setty and Associates Engineers - Site Verification Visit |
Project Description / Scope: Renovate Gym and Pool Infill – PE Building; Site Verification Visit Scope. Gymnasium: • Verify Floor Electrical & Data Outlets to be replaced • Verify South Wall Bleacher Disconnect/Power Switch for new Bleachers • Verify Score Boards, Sound Systems, & Parameter Lighting Conduits and Final location of Control Cabinets • Verify Power Supply for Operable Partitions Motor Replacements Pool: • Verify Pool Equipment Room As-Built Electrical for Electrical Removals Plan • Verify location and capacity of existing Power Distribution in Pool area for future hook-up in new in-slab Raceway • Verify existing Pool Plumbing in Pool Equipment Room for Plumbing Removals Plan • Verify existing location of Pool Deck Drains for Plumbing Removals Plan |
Estimated Start: 10/5/2020 10:00 AM |
Estimated End: 10/5/2020 2:00 PM |
More Details |
Physical Education Hot Water Shutdown |
Project Description / Scope: Hot water shutdown for Physical Education for underground leak repair. All PE Hotwater services will be down. Space Heating systems will be down as well. Repairs will be made as quick as possible. |
Estimated Start: 9/22/2020 12:00 PM |
Estimated End: 9/24/2020 12:00 PM |
More Details |
Empire Commons - All Apartment Units |
Project Description / Scope: Clean, Repair, replace damaged, existing broken, cracked building gutters and related downspouts |
Estimated Start: 9/23/2020 7:00 AM |
Estimated End: 1/7/2021 11:00 AM |
More Details |
Campus Wide - Rehab Toilet Room for ADA Phase 2 |
Project Description / Scope: The work of this project includes complete renovation of toilet rooms at Uptown and Downtown Campus buildings. The reconstruction work toilet rooms will be having two to three phases per building. Please see update schedule: MILNE Hall: Phase 1 start 09/14/20 – 12/07/20 Rooms # 114, 209, & 311 mobilizing Monday 9/14/20. Temp partitions will be erected and demo will start nights soon thereafter. Phase 2 start 12/16/20 – 03/24/21 |
Estimated Start: 9/14/2020 12:00 AM |
Estimated End: 6/30/2021 12:00 AM |
More Details |
Life Sciences Research Building - Annual NFPA Inspection |
Project Description / Scope: Annual NFPA inspection of LSRB 01001 Flammable Storage Room. Room will be unavailable for use at that time. Storage may remain, but must be kept clear of North side vent wall. |
Estimated Start: 9/15/2020 8:00 AM |
Estimated End: 9/15/2020 12:00 PM |
More Details |
Lecture Center - Podium Stair Construction – Promenade Level Near Library |
Project Description / Scope: The replacement of the inner podium promenade stairs near the Library, will begin Monday, August 31st. Contractor work hours for distributive noisy work will be in the morning from 5:00am until 8:30am. Please see the attached plan for the work areas. |
Estimated Start: 8/31/2020 12:00 AM |
Estimated End: 12/15/2020 12:00 AM |
More Details |
Lecture Center - Podium Ramp/Stair Construction |
Project Description / Scope: The replacement of the podium stairs/ramp at the northeast corner of the podium between the Biology and Earth Science buildings, will begin Monday, August 31st. Contractor work hours for distributive noisy work will be in the morning from 5:00am until 8:30am. Please see the attached plan for the work area and the alternate access routes to the podium. |
Estimated Start: 8/31/2020 12:00 AM |
Estimated End: 12/15/2020 12:00 AM |
More Details |
Restripe Perimeter Road - Update |
Project Description / Scope: Department of Transportation will be onsite August 18th to restripe the Uptown Campus perimeter road. |
Estimated Start: 8/18/2020 8:30 AM |
Estimated End: 8/18/2020 11:30 AM |
More Details |
Arts & Science - Building Power Outages |
Project Description / Scope: The University is upgrading our Medium Voltage Electrical Gear. Which will require whole building outages between the time specified. Fire Alarm systems will remain active. Building will be required to be vacant during construction. College of Arts & Science and the Registrars Office are aware and have approved. Within these buildings in this timeline all lighting, power, phones and internet will be offline. |
Estimated Start: 8/17/2020 8:00 PM |
Estimated End: 8/18/2020 12:00 AM |
More Details |
Fine Arts, Humanities, Social Science - Power Outages |
Project Description / Scope: The University is upgrading our Medium Voltage Electrical Gear. Which will require whole building outages between the time specified. Fire Alarm systems will remain active. Building will be required to be vacant during construction. College of Arts & Science and the Registrars Office are aware and have approved. Within these buildings in this timeline all lighting, power, phones and internet will be offline. |
Estimated Start: 8/17/2020 5:00 PM |
Estimated End: 8/17/2020 10:00 PM |
More Details |
Restripe Perimeter Road |
Project Description / Scope: Department of Transportation will be onsite August 17th to restripe the Uptown Campus perimeter road. |
Estimated Start: 8/17/2020 7:00 AM |
Estimated End: 8/17/2020 10:30 AM |
More Details |
Podium - Survey Work at Campus Center & Taconic |
Project Description / Scope: Outdoor survey work will be in progress on the Podium canopies surrounding Campus Center and Taconic (formerly Building 35/Education). |
Estimated Start: 8/17/2020 7:00 AM |
Estimated End: 8/18/2020 5:00 PM |
More Details |
Fine Arts Building - Spray Booth Project |
Project Description / Scope: This project is to install a spray booth on the third floor of the Fine Arts building. The project first requires abatement in the proposed space for the new booth. During this work period asbestos abatement will take place in Fine Arts third floor. This will include rooms 305-308 and part of the hallway adjacent to these rooms. |
Estimated Start: 8/10/2020 7:00 AM |
Estimated End: 8/14/2020 5:00 PM |
More Details |
Biology Building - Class Lab Phase VI Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed. During this work period the newly installed exhaust fans will be shutdown to perform some final adjustments. There will be not exhaust in the fume hoods in the North side of the building. |
Estimated Start: 8/4/2020 8:00 AM |
Estimated End: 8/4/2020 11:00 AM |
More Details |
Campus Center - Asbestos Abatement |
Project Description / Scope: Abatement of Asbestos Containing Material requires all air handlers to be turned off. This will result in a loss of cooling and ventilation. Hot water will also be affected. |
Estimated Start: 7/30/2020 7:00 AM |
Estimated End: 8/14/2020 4:00 PM |
More Details |
Podium Bike Room - Pressure Washing |
Project Description / Scope: Pressure washing of Podium Bike room and stairs between Biology and Chemistry |
Estimated Start: 7/30/2020 7:00 AM |
Estimated End: 7/31/2020 3:30 PM |
More Details |
SEFCU Arena - Core Upgrades & Visitor Experience Improvements |
Project Description / Scope: Hydrant flow tests will be conducted at various hydrants around the Athletics Complex area, primarily those in close proximity to SEFCU Arena. Each test should be of short duration. |
Estimated Start: 7/24/2020 8:00 AM |
Estimated End: 7/24/2020 10:00 AM |
More Details |
Physical Education - Hot Water Shutdown |
Project Description / Scope: Hot water shutdown for Physical Education for testing, maintenance, and system assessment. |
Estimated Start: 7/23/2020 9:00 AM |
Estimated End: 7/27/2020 12:00 PM |
More Details |
Chemistry Building - Class Lab Phase VI Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed. During this work period the West staircase at the first floor to the second floor in Chemistry will be closed off at times throughout the day. This is to allow contractors to bring large pieces of equipment up the stairs to room 230. The East staircase and elevator will remain open throughout the day. |
Estimated Start: 6/16/2020 6:00 AM |
Estimated End: 6/16/2020 2:00 PM |
More Details |
Uptown and Downtown Campuses - Annual Maintenance of Fire Hydrants |
Project Description / Scope: Annual inspection and maintenance of fire hydrants on both campuses will be conducted during this period. |
Estimated Start: 6/15/2020 8:00 AM |
Estimated End: 8/30/2020 4:00 PM |
More Details |
Performing Art Center & Social Science - Window Treatment |
Project Description / Scope: Remove existing and installing new window treatments in PAC: 265,266,267,209,264,347,346,351,306,305,304,303,302,356,357,312,311,314,315,313,214,309. Social Science: 327,237,311,305 |
Estimated Start: 6/8/2020 8:00 AM |
Estimated End: 6/15/2020 5:00 PM |
More Details |
Service Building A & Service Building A Annex - Power Outage |
Project Description / Scope: A power outage of Service Building A (SBA) and Service Building A Annex (SBA-A) is required as part of the SUCF 011006 Central Plant Upgrades project. This power shutdown is necessary to remove a temporary power feed to SBA and SBA-A and restore permanent power service. This power outage will be as follows: Thursday, May 28th, from 6:00 AM to 8:00 AM During this outage there will be no power to these buildings, with the exception of emergency battery back-up power to building fire alarm systems. As a result, there will be no card access, lighting, heating/cooling, computer, phone and elevator service. The power outage start and end times have been revised from a previous work notice. |
Estimated Start: 5/28/2020 6:00 AM |
Estimated End: 5/28/2020 8:00 AM |
More Details |
Biology 158 Classroom Renovation |
Project Description / Scope: This project is to renovate Biology 158 with new finishes for use as an Anthropology lab classroom. Some of the changes include alterations to existing utilities. During this work period the plumbing shop will be installing new water valves to isolate a room that will be renovated. In order to install the new valves the RO water system must be taken offline. Please do not use RO water during this time. |
Estimated Start: 5/27/2020 7:00 AM |
Estimated End: 5/27/2020 12:00 PM |
More Details |
Chemistry Building - Class Lab Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed During this work period contractors will be installing new water feeds for the lab renovations being performed in the Chemistry building. There will be NO water in the building while the new valves are being installed. This will affect all cold and hot water at sinks as well as the rest rooms. |
Estimated Start: 5/22/2020 7:00 AM |
Estimated End: 5/22/2020 10:00 PM |
More Details |
Biology Building - Class Lab Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed During this work period contractors will be utilizing a crane to place materials onto the roof of the Biology Building. The Life Sciences loading dock will be closed for the use of the crane and support vehicles during the duration of the crane pick. In addition, occupation of the Biology Building will be restricted during the duration of the crane pick. Occupants should not plan on working in the building during this time period. |
Estimated Start: 5/28/2020 7:00 AM |
Estimated End: 5/28/2020 6:00 PM |
More Details |
Social Science Building - Sectional Building Outage - Arc Fault Remediation (C) |
Project Description / Scope: Social Science – This work requires a shutdown of the C Electrical Riser which feeds the South offices of the 1st, 2nd, 3rd floor of Social Science. The shutdown will be for a 12 hour period. This is a sectional shutdown. Fire alarm, Card Access and HVAC will remain online. College of Arts and Summer Sessions has been made aware. |
Estimated Start: 5/21/2020 6:30 AM |
Estimated End: 5/21/2020 6:30 PM |
More Details |
Social Science Building - Sectional Building Outage - Arc Fault Remediation (B) |
Project Description / Scope: Social Science – This work requires a shutdown of the B Electrical Riser which feeds the Center offices of the 1st, 2nd, 3rd floor of Social Science. The shutdown will be for a 12 hour period. This is a sectional shutdown. Fire alarm, Card Access and HVAC will remain online. College of Arts and Summer Sessions has been made aware. |
Estimated Start: 5/19/2020 6:30 AM |
Estimated End: 5/19/2020 6:30 PM |
More Details |
Social Science Building - Sectional Building Outage - Arc Fault Remediation (A) |
Project Description / Scope: Social Science – This work requires a shutdown of the A Electrical Riser which feeds the North offices of the 1st, 2nd, 3rd floor of Social Science. The shutdown will be for a 12 hour period. This is a sectional shutdown. Fire alarm, Card Access and HVAC will remain online. College of Arts and Summer Sessions has been made aware. |
Estimated Start: 5/20/2020 6:30 AM |
Estimated End: 5/20/2020 6:30 PM |
More Details |
Social Science, Humanities & Fine Arts - Sectional Building Outage - Abatements |
Project Description / Scope: Social Science – Abatement Required 2 Hour Shutdown 7AM-930AM in Shipping and Receiving – Shutdown will affect 1-3 Floor A, B & C Electrical Risers. Telecom/Data has been coordinated with. Humanities – Abatement Required 2 Hour Shutdown 9AM-11AM within Main Electrical Room. Will shutdown HVAC for 2 Hours. Fine Arts - Abatement Required 2 Hour Shutdown 1230PM-230PM – “A” Riser shutdown will effect basement level Mechanical Room. |
Estimated Start: 5/18/2020 7:00 AM |
Estimated End: 5/18/2020 2:30 PM |
More Details |
State and Indian Quads - Exterior Concrete Restoration |
Project Description / Scope: Work will include removal and repair of spalled/delaminated concrete of canopy ceiling, overhangs, columns and the exterior concrete restoration of building facades on State and Indian Quads. The update construction schedule: State Quads 2019 Irving, Fulton, Copper, Melville State Quad 2020 Steinmetz, Tappan, Whitman, Anthony Indian Quad 2020 Seneca, Tuscarora Indian Quad 2021 Mahican, Montauk, Oneida, Onondaga, Adirondack, Cayuga |
Estimated Start: 5/20/2019 12:00 AM |
Estimated End: 8/9/2021 12:00 AM |
More Details |
Lecture Center - Domestic Water Shutdown |
Project Description / Scope: There will be a (1) hour shutdown of the domestic water in the Lecture Center building on Monday, May 18th, from 7:00am until 8:00am. During the water shutdown, there will also be no water service to the Library building basement toilet rooms. |
Estimated Start: 5/18/2020 7:00 AM |
Estimated End: 5/18/2020 8:00 AM |
More Details |
Catskill Building - West Podium Deck Replacement |
Project Description / Scope: Replacement of the existing concrete podium deck located to the west of the Catskill Building will commence on 5/18/20 at 7:00am and continue daily thru 5/29/20. This activity will create noise due to concrete removals. Access at the podium level will be re-routed to ensure passage around the work zones. For more details regarding this project, please visit: https://www.albany.edu/facilities/fp/building_27.html |
Estimated Start: 5/18/2020 7:00 AM |
Estimated End: 5/29/2020 5:00 PM |
More Details |
Lecture Center - Elevator Piston Drilling |
Project Description / Scope: Drilling for a new elevator piston will begin on Monday, May 18th. Drilling work will occur between 5:00pm and 3:00am. During the drilling process, an air compressor trailer will be located between the podium and the Massry Center building. Please see the attached plan for reference. |
Estimated Start: 5/18/2020 5:00 PM |
Estimated End: 5/29/2020 3:00 AM |
More Details |
Humanities - Sectional Building Power Outage |
Project Description / Scope: This work requires a shutdown of the C – Electrical Riser which feeds the East offices of the 1st, 2nd, 3rd floor of Humanities. The shutdown will be for a 12 hour period. This is a sectional shutdown. Fire Alarm, Card Access and HVAC will remain online. College of Arts and Science has been made aware. |
Estimated Start: 5/15/2020 6:30 AM |
Estimated End: 5/15/2020 6:30 PM |
More Details |
Humanities - Sectional Building Power Outage |
Project Description / Scope: This work requires a shutdown of the A – Electrical Riser which feeds the West offices of the 1st, 2nd, 3rd floor of Humanities. The shutdown will be for a 12 hour period. This is a sectional shutdown. Fire Alarm, Card Access and HVAC will remain online. College of Arts and Science has been made aware. |
Estimated Start: 5/14/2020 6:30 AM |
Estimated End: 5/14/2020 6:30 PM |
More Details |
Lecture Center - Podium Stair Construction |
Project Description / Scope: The replacement of the inner podium promenade stairs near the Campus Center building, will begin Monday, May 11th. Please see the attached plan for the work areas. |
Estimated Start: 5/11/2020 7:00 AM |
Estimated End: 8/6/2020 7:00 AM |
More Details |
Humanities - Sectional Building Power Outage |
Project Description / Scope: This work requires a shutdown of the B – Electrical Riser which feeds the center offices of the 1st, 2nd, 3rd floor of Humanities. The shutdown will be for a 12 hour period. This is a sectional shutdown. Fire Alarm, Card Access and HVAC will remain online. College of Arts and Science has been made aware. |
Estimated Start: 5/13/2020 6:30 AM |
Estimated End: 5/13/2020 6:30 PM |
More Details |
Service Building A & Annex - Power Outage |
Project Description / Scope: Two (2) separate power outages of Service Building A (SBA) and Service Building A Annex (SBA-A) are required as part of the SUCF 011006 Central Plant Upgrades project. These power shutdowns are necessary to install, and then remove, a temporary power feed to SBA and SBA-A so that a main power transformer in the Power Plant can be shut down for construction work during the annual Power Plant shutdown period. These two (2) separate power outages will be as follows: Friday, May 15th, from 5:00 AM to 10:00 AM Thursday, May 28th, from 5:00 AM to 10:00 AM During these outages there will be no power to these buildings, with the exception of emergency battery back-up power to building fire alarm systems. As a result, there will be no card access, lighting, heating/cooling, computer, phone and elevator service. |
Estimated Start: 5/15/2020 5:00 AM |
Estimated End: 5/28/2020 10:00 AM |
More Details |
CDTA Harriman West Bus Station |
Project Description / Scope: CDTA is constructing a new bus station on the Harriman Campus in front of the University’s new ETEC building. As part of this project a new intercampus connector road will be installed to connect the Uptown Campus to the Harriman Campus. This road will follow the route of the existing access road from University Drive to the rear of Boor Sculpture Studio. The CDTA contractor is planning on starting mobilization/preparation work (installing traffic work zone signs) the week of April 20th. During this time the access road to the Studio will remain open to vehicle traffic. Site clearing work is anticipated to start the week of May 4th. At this time the access road to the Studio will be closed to vehicle traffic. Opening of the new connector road that will also provide vehicle access to Boor Studio is anticipated to occur in mid to late August. |
Estimated Start: 4/20/2020 7:00 AM |
Estimated End: 8/21/2020 5:00 PM |
More Details |
Annual Power Plant Shutdown 2020 |
Project Description / Scope: The University community should expect minimal heating and air conditioning service during the above-mentioned period on the Uptown Campus, excluding areas serviced by local systems. Air conditioning will be working in all areas, but effectiveness may diminish if the temperatures reach the 90's. Domestic hot water will not be available during this time except areas serviced by local systems, i.e. SEFCU Arena, Boor Sculpture Studio, Liberty Terrace, Freedom Quad and select Residence Halls. State and Indian Dining Rooms will have a measure of Domestic Hot Water. |
Estimated Start: 5/17/2020 8:00 AM |
Estimated End: 6/3/2020 8:00 AM |
More Details |
State Student Parking Lot - Cleared & Barricaded |
Project Description / Scope: There will be a building-wide power outage/shutdown in the Lecture Center building starting on Saturday, March 21st at 8:00am. Power is anticipated to be restored by 8:30am. Any equipment that uses power will not be operational, such as; computers, lights, fans, refrigerators, vending machines, etc. Staff will not be allowed to enter the building during the shutdown timeframe. Staff in the Lecture Center should turn off all office equipment (i.e. computers, printers, etc.) prior to the power shutdown. |
Estimated Start: 3/21/2020 8:00 AM |
Estimated End: 3/21/2020 8:30 AM |
More Details |
Education - Renovate Building 35 (Taconic) |
Project Description / Scope: A moving truck will be parked on Center Drive West unloading furniture into the Taconic Building. This work will occur on Thursday (3/19) and Friday (3/20). One lane of Center Drive West will remain open at all times for traffic to pass. |
Estimated Start: 3/19/2020 8:00 AM |
Estimated End: 3/20/2020 3:00 PM |
More Details Map |
Lecture Center - Renovate LC 1-2 |
Project Description / Scope: The replacement of the inner podium promenade stairs near the Performing Art Center building, will begin Friday, March 13th. Contractor work hours for distributive noisy work will be during the night between 11:00pm until 7:00am. Please see the attached plan for the work areas. **Update: For the next (3) weeks, (3/16 thru 4/3), Noisy demolition and abatement work will occur during the day between 7:00am until 3:00pm. |
Estimated Start: 3/13/2020 11:00 PM |
Estimated End: 6/8/2020 7:00 AM |
More Details Map |
State Quad - Pole Light Installation |
Project Description / Scope: This project work consists of installing new pole lights along the diagonal pedestrian path from the Podium to State Quad as shown on the attached. The work will include excavation and installation of the new lights. |
Estimated Start: 3/16/2020 7:00 AM |
Estimated End: 3/27/2020 4:00 PM |
More Details Map |
State Student Parking Lot - Cleared & Barricaded |
Project Description / Scope: State Quad Student Parking lot to be cleared and barricaded 03/18/2020-03/19/2020 for Parking and CDTA Bus transportation to TU Center for NCAA Basketball tournament. |
Estimated Start: 3/18/2020 10:00 PM |
Estimated End: 3/19/2020 10:00 PM |
More Details |
Podium Tunnel & Buildings, Phys Ed, SEFCU - Testing & Maintenance of Overhead Fire Doors |
Project Description / Scope: Contractor will be inspecting, testing and performing light maintenance on overhead fire doors and window fire shutters. In the Academic Tunnel, this work may result in electric vehicle and pedestrian traffic delays when overhead fire doors are in the down position. |
Estimated Start: 3/17/2020 7:00 AM |
Estimated End: 3/20/2020 7:00 PM |
More Details |
Biology Building - Class Lab Phase VI Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed During this period newly installed portions of the fire alarm system will be tested and alarms will be set off. The testing is going to be made as brief as possible. |
Estimated Start: 2/4/2020 7:00 AM |
Estimated End: 2/4/2020 8:30 AM |
More Details |
Lecture Center - Renovate LC 1-2 |
Project Description / Scope: The replacement of the podium stairs/ramp at the northwest corner of the podium between the Social Science and Catskill buildings, will begin Monday, February 3rd. Contractor work hours for distributive noisy work will be in the morning from 5:00am until 8:30am. Please see the attached plan for the work area and the alternate access routes to the podium. |
Estimated Start: 2/3/2020 5:00 AM |
Estimated End: 5/4/2020 6:00 AM |
More Details Map |
PE and RACC - Heat & Hot Water Interruption |
Project Description / Scope: On Tuesday morning, January 28, 2020 an emergency repair will be done on the HTHW main distribution inside Dutch Quad Service Tunnel. The central campus heating loop to the PE Building and SEFCU arena will be cooled, drained and a welded repair done. Work to drain the piping will start Tuesday morning, January 28, at 9 AM. There will be an interruption to Domestic Hot water and heat in the PE Building and an interruption to the heat in SEFCU, Tuesday morning through Tuesday evening. Domestic Hot Water service and heat will be restored to these areas by Tuesday evening January 28 by 5 PM. |
Estimated Start: 1/28/2020 9:00 AM |
Estimated End: 1/28/2020 5:00 PM |
More Details |
Campus Center West - Elevator Cab Restoration |
Project Description / Scope: Campus Center west elevator cab restoration- Metal Man Restoration will be performing the work to restore the elevator to its former glory. For access to upper floors use the east elevator. |
Estimated Start: 1/13/2020 7:00 AM |
Estimated End: 1/17/2020 4:00 PM |
More Details |
Campus Center East - Elevator Cab Restoration |
Project Description / Scope: Campus Center East elevator cab restoration-remove dirt, grime, deteriorating clear coating, strip, sand and refinish. For access to upper floors use the west elevator. |
Estimated Start: 1/6/2020 7:00 AM |
Estimated End: 1/10/2020 4:00 PM |
More Details |
Sci. Library & CC West - Heat & Hot Water Shutdown |
Project Description / Scope: Weather permitting: Temporary shut down of Heat and Hot water serving the Science Library and Campus Center West. This is needed to repair a significant Heating Water Leak underground. |
Estimated Start: 1/6/2020 12:00 AM |
Estimated End: 1/6/2020 4:00 PM |
More Details |
CC, Humanities, Soc. Sci. - Rehab Toilet Rooms |
Project Description / Scope: Entering and exiting electrical closets and investigating electrical panels. |
Estimated Start: 1/2/2020 9:00 AM |
Estimated End: 1/2/2020 3:00 PM |
More Details |
Lecture Center - Renovate LC 1-2 |
Project Description / Scope: There will be a partial building power outage/shutdown in the Lecture Center building starting on Friday, January 10th at 5:00pm. The power will be shutoff in the northwest quadrant of the building. See attached plan for reference. Power is anticipated to be restored on Sunday, January 12 at 12:00pm. The buildings electrical systems will be shutoff in the northwest quadrant of the building. Any equipment that uses power will not be operational, such as; computers, lights, fans, refrigerators, vending machines, etc. Staff will not be allowed to enter this portion of the building during the shutdown timeframe. Staff in the Lecture Center should turn off all office equipment (i.e. computers, printers, etc.) prior to the power shutdown. |
Estimated Start: 1/10/2020 5:00 PM |
Estimated End: 1/12/2020 12:00 PM |
More Details Map |
Sci. Library & CC West - Heat & Hot Water Shutdown |
Project Description / Scope: Weather permitting: Temporary shut down of Heat and Hot water serving the Science Library and Campus Center West. This is needed to repair a significant Heating Water Leak underground. |
Estimated Start: 12/23/2019 12:00 AM |
Estimated End: 12/24/2019 12:00 AM |
More Details |
Lawn West of Sci Library - Heat & Hot Water Leak |
Project Description / Scope: In order to investigate the HTHW leak in the buried Trench Box west of the Science Library, a section of the Lawn abutting the sidewalk will be excavated, Wednesday Morning, December 18. The repair will follow the identification of leak location. |
Estimated Start: 12/18/2019 7:00 AM |
Estimated End: 12/20/2019 4:00 PM |
More Details |
PE/SEFCU - Heat & Hot Water Interruption |
Project Description / Scope: On Wednesday morning, December 18, 2019 an emergency repair will be done on the HTHW main distribution outside Dutch Quad. The central campus heating loop to the PE Building and SEFCU arena will be cooled, drained and a welded repair done. Work to drain the piping will start Tuesday night, December 17, at 10 PM. There will be an interruption to Domestic Hot water and heat in the PE Building and an interruption to the heat in SEFCU, Tuesday evening through Wednesday. Domestic Hot Water service and heat will be restored to these areas by Wednesday evening December 18 by 9 PM. |
Estimated Start: 12/17/2019 10:00 PM |
Estimated End: 12/18/2019 9:00 PM |
More Details |
PE/SEFCU - Heat & Hot Water Interruption |
Project Description / Scope: On Wednesday morning, December 18, 2019 an emergency repair will be done on the HTHW main distribution outside Dutch Quad. The central campus heating loop to the PE Building and SEFCU arena will be cooled, drained and a welded repair done. Work to drain the piping will start Tuesday night, December 17, at 10 PM. There will be an interruption to Domestic Hot water and heat in the PE Building and an interruption to the heat in SEFCU, Tuesday evening through Wednesday. Domestic Hot Water service and heat will be restored to these areas by Wednesday evening December 18 by 9 PM. |
Estimated Start: 12/17/2019 10:00 PM |
Estimated End: 12/18/2019 9:00 PM |
More Details |
Biology Building - Lab Phase VI Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed. |
Estimated Start: 12/23/2019 5:00 AM |
Estimated End: 12/23/2019 4:00 PM |
More Details |
Lecture Center -Renovate LCs 1-2 |
Project Description / Scope: There will be a (9) hour shutdown of the hose cabinet FP water service in the Lecture Center building on Tuesday, December 17th, from 10:00pm until 7:00am. This shutdown will only effect the hose cabinets in the northwest quadrant of the Lecture Center building. |
Estimated Start: 12/17/2019 10:00 PM |
Estimated End: 12/18/2019 7:00 AM |
More Details |
Biology Building - Lab Phase VI Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed. |
Estimated Start: 12/18/2019 12:00 AM |
Estimated End: 12/20/2019 12:00 AM |
More Details Map |
CAMPUS WIDE - Elevator Inspections/Tests |
Project Description / Scope: Campus wide elevator Inspection/Test of all elevators. CNY Elevator Co. to inspect and witness tests done by elevator service companies. |
Estimated Start: 12/23/2019 7:00 AM |
Estimated End: 1/17/2020 4:00 pM |
More Details |
Podium - Service Tunnel Central Plant Upgrades |
Project Description / Scope: As part of the 011006/P-0717 Central Plant Upgrades project a contractor will be installing and connecting new piping and valves to the existing chilled water distribution system located throughout the Podium service tunnel system. This piping will service future cooling needs in Podium buildings. This work will be performed during weekday nights, starting at 11PM and finishing by 7AM. Safety barriers and smoke control equipment will be used at the work sites during pipe welding however tunnel access past the sites will be maintained and permitted. |
Estimated Start: 12/10/2019 11:00 PM |
Estimated End: 12/17/2019 7:00 AM |
More Details |
University Hall - Fire Alarm System Visual Inspection |
Project Description / Scope: Semi-Annual inspection of the Fire Alarm devices. Staff walking around with equipment inside office suites and hallways. |
Estimated Start: 12/4/2019 8:00 AM |
Estimated End: 12/04/2019 5:00 PM |
More Details |
Lecture Center - Elevator and Stair Construction |
Project Description / Scope: The Elevator and a set of stairs on the west side of the Lecture Center building will be shut down and taken offline for reconstruction. The elevator shaft will be extended to a new structure built on promenade podium deck level. Contractor work hours for distributive noisy work will be at night from 11:00pm until 8:00am. See attached conceptual graphic and work area location plan. |
Estimated Start: 12/2/2019 12:00 AM |
Estimated End: 5/14/2020 12:00 AM |
More Details Map Graphic |
CC/Humanities/SS- Rehab Toilet Rooms for ADA |
Project Description / Scope: Exhaust airflow survey for toilets in CC, Humanities and SS. |
Estimated Start: 11/25/2019 7:00 AM |
Estimated End: 12/06/2019 3:30 PM |
More Details |
PE & SEFCU(RACC) - Heat & Hot Water Interruption |
Project Description / Scope: On Monday morning, November 25, 2019 an emergency repair will be done on the HTHW main distribution outside Dutch Quad. The central campus heating loop to the PE Building and SEFCU arena will be cooled, drained and a welded repair done. Work to drain the piping will start Sunday night, November 24, at 10 PM. There will be an interruption to Domestic Hot water and heat in the PE Building and an interruption to the heat in SEFCU, Sunday evening through Monday. Domestic Hot Water service and heat will be restored to these areas by Monday evening November 25 by 9 PM. |
Estimated Start: 11/24/2019 10:00 PM |
Estimated End: 11/25/2019 9:00 PM |
More Details |
Biology Building - Lab Phase VI Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed. |
Estimated Start: 11/29/2019 7:00 AM |
Estimated End: 11/29/2019 4:00 PM |
More Details |
Uptown Campus - Rehab Toilet Rooms for ADA |
Project Description / Scope: Pre-renovation survey for asbestos, lead, and PCBs in potential impacted areas. |
Estimated Start: 11/25/2019 9:00 AM |
Estimated End: 11/26/2019 5:00 PM |
More Details |
Biology Building - Lab Phase VI Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed. |
Estimated Start: 11/8/2019 7:00 AM |
Estimated End: 11/8/2019 12:00 PM |
More Details Map |
Podium Tunnel - Rehab Toilet Room |
Project Description / Scope: A section of the Podium Tunnel area between the Arts & Sciences and Education building will be closed for the pipe insulator beginning on Monday, October 28 @ 7:00 am and ending Monday, October 28 @ 3:30 pm. During this closure, no pedestrian or Cushman traffic will be permitted through the area. Please see the attached map for specific location. |
Estimated Start: 10/28/2019 7:00 AM |
Estimated End: 10/28/2019 3:30 PM |
More Details Map |
Lecture Center - Domestic Water Shutdown |
Project Description / Scope: There will be a (4) hour shutdown of the domestic water in the Lecture Center building on Monday, October 28th, from 12:00am until 4:00am. During the shutdown, water isolation valves will be installed to the toilet rooms. |
Estimated Start: 10/28/2019 12:00 AM |
Estimated End: 10/15/2019 4:00 AM |
More Details |
Lecture Center - Renovate Toilet Rooms |
Project Description / Scope: Full gut renovation of Lecture Center buildings east toilet rooms (009 & 016), including demolition, abatement, new fixtures and finishes. Contractor work hours for distributive noisy work will be at night from 11:00pm until 8:00am. The work will begin on October 28, 2019 and continue until April 1, 2020. During the construction, please use the toilet rooms on the west side of the Lecture Center, Performing Arts Center or Computing Center building. See attached plan/map for reference. |
Estimated Start: 10/28/2019 12:00 AM |
Estimated End: 4/1/2020 12:00 AM |
More Details Map |
Uptown Campus - Emergency Management Exercises |
Project Description / Scope: On October 15, 2019, the University at Albany will conduct 2 emergency management exercises on campus. Due to this the eastern parking and access portion of Center Drive West and a small portion Dutch faculty/staff parking lot will be blocked for emergency vehicle staging between 5a-12p. |
Estimated Start: 10/15/2019 5:00 AM |
Estimated End: 10/15/2019 12:00 PM |
More Details Map |
Arts and Sciences - Elevator Maintenance |
Project Description / Scope: Arts and Sciences elevators maintenance will require each elevator off, one at a time to perform maintenance work. This maintenance needs to be performed per ASME and other applicable codes. |
Estimated Start: 10/14/2019 7:30 AM |
Estimated End: 10/15/2019 3:30 PM |
More Details |
Uptown Campus - Domestic Hot Water Interruption |
Project Description / Scope: On Friday night, October 11, 2019 an emergency repair will be done on the HTHW main distribution under the Academic Podium. The central campus heating system will be cooled, portions drained and a welded repair done. There will be limited domestic hot water and heat, Friday evening and Saturday morning on the Academic Podium, Campus Center, Indian and State Quads. Steam in Chemistry building will be interrupted. |
Estimated Start: 10/11/2019 4:00 PM |
Estimated End: 10/12/2019 6:00 AM |
More Details |
Biology Building - Class Lab Phase VI Renovations 2 |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed. |
Estimated Start: 10/14/2019 7:00 AM |
Estimated End: 10/15/2019 3:00 PM |
More Details |
Biology Building - Class Lab Phase VI Renovations 1 |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed. |
Estimated Start: 10/14/2019 7:00 AM |
Estimated End: 10/14/2019 3:00 PM |
More Details |
Podium - Academic Building Exterior Concrete Repair |
Project Description / Scope: The design company will be conducting a hazmat survey outside the Academic Podium Buildings. A high scissor lift will be used in the inspection. The investigation will be outside stairwells and offices and not directly outside classroom windows. The inspections will not last longer than 10 minutes at any one location, so disruption of classroom activities, if any, should be minimal. |
Estimated Start: 10/8/2019 9:00 AM |
Estimated End: 10/10/2019 5:00 PM |
More Details |
Dutch Loading Dock - Parking Cleared & Barricaded |
Project Description / Scope: Dutch Loading Dock parking area to be cleared and barricaded 10/18/19-10/21/19 for Homecoming Activities. Buses will be using this area as a turnaround. |
Estimated Start: 10/18/2019 8:00 AM |
Estimated End: 10/21/2019 12:00 PM |
More Details |
Uptown Campus - Center Drive West/Dutch Faculty-Staff Parking |
Project Description / Scope: On October 15, 2019, the University at Albany will conduct 2 emergency management exercises on campus. Due to this the eastern parking and access portion of Center Drive West and a small portion Dutch faculty/staff parking lot will be blocked for emergency vehicle staging between 5a-12p. |
Estimated Start: 10/15/2019 5:00 AM |
Estimated End: 10/15/2019 12:00 PM |
More Details |
Biology Building - Class Lab Phase VI Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed. |
Estimated Start: 9/20/2019 6:00 AM |
Estimated End: 9/20/2019 12:00 PM |
More Details |
Podium Buildings - Toilet Room Rehab for ADA |
Project Description / Scope: On Wednesday, September 18, 2019 from 6AM to 8AM, there will be a two (2) hour WATER shut down to replace the pipe supply for the restrooms located on the West side of the Lecture Center and the Library Basement near the Educational Opportunities Program (EOP) and the Academic Advancement Center. |
Estimated Start: 9/18/2019 6:00 AM |
Estimated End: 9/18/2019 8:00 AM |
More Details |
Fine Arts - Toilet Room Rehab |
Project Description / Scope: The contractor will be starting renovation work in basement restrooms 019 and 020 in the Fine Arts building. Please use the restrooms on the second floor. |
Estimated Start: 9/06/2019 6:00 AM |
Estimated End: 11/25/2019 7:00 AM |
More Details |
Boor Studio & Indian Quad - Tree Removal |
Project Description / Scope: Dead Tree Removal: Removal of a white pine at intersection of University and Justice Drives w/debris; removal of a pin oak at right side of Indian Quad w/stump and debris; removal of pin oak at right side of Indian w/stump and debris; removal of a pin oak at center of Indian w/stump and debris. Additional notices will be released as necessary. |
Estimated Start: 8/31/2019 8:00 AM |
Estimated End: 8/31/2019 4:00 PM |
More Details |
Fine Arts - Toilet Rehab |
Project Description / Scope: The contractor will start work on the first floor restrooms in the Fine Arts building. Please use the restrooms on the second floor. |
Estimated Start: 8/27/2019 7:00 AM |
Estimated End: 11/25/2019 7:00 AM |
More Details |
Lecture Center Renovation |
Project Description / Scope: Full gut renovation of Lecture Centers 1 and 2, including demolition, abatement, new electrical, data & IT, new ductwork and air handling units, new ceilings and finishes. Contractor work hours for distributive noisy work will be at night from 11:00pm until 8:00am. The project also includes the following ADA improvements; extension of the elevator to the promenade podium deck, full gut renovations to bathrooms LC 009 and 015 and replacement of podium stairs/ramps. Please see the attached plan for the various work areas and timeframes for the work. |
Estimated Start: 8/05/2019 11:00 PM |
Estimated End: 10/30/2020 7:00 AM |
More Details map |
Exterior Signage Installation |
Project Description / Scope: This project includes the installation of new building identification signage on the exterior of the Campus Center (north podium entrance), Campus Center East (south entrance and east wall), and Campus Center West (south entrance and north, west, south wall). During this work period, access to the entrances may be limited. |
Estimated Start: 8/19/2019 8:00 AM |
Estimated End: 8/19/2019 6:00 PM |
More Details |
Fire System Water Shutdown |
Project Description / Scope: On Wednesday August 14 from 7AM to 9AM there will be a two (2) hour WATER shut down for the restrooms at four areas in the Library building. These areas include 0134, 0222, 0322 and the basement men’s restrooms to replace recirculation valve. |
Estimated Start: 8/14/2019 7:00 AM |
Estimated End: 8/14/2019 9:00 AM |
More Details |
Fire System Water Shutdown |
Project Description / Scope: The Plumbing Shop will be shutting down the fire system water for maintenance on the fire pump in the mechanical room. The tower will be without water from 6AM TO 7PM on Monday August 12th, 2019 |
Estimated Start: 8/12/2019 6:00 AM |
Estimated End: 8/12/2019 7:00 PM |
More Details |
Uptown Campus Road Striping |
Project Description / Scope: The contractor will be striping University Drive and other roadways on the Uptown Campus. Where one way traffic is necessary, flaggers will be present to direct traffic through the work zone. |
Estimated Start: 8/13/2019 8:00 AM |
Estimated End: 8/14/2019 6:00 PM |
More Details |
Uptown Campus Primary Water Main Shutdown – 8/3/19 |
Project Description / Scope: A shutdown of the Uptown Campus primary water main is scheduled for Saturday, August 3, 2019. The NYS Office of General Services (OGS) is replacing/upgrading a water main on the Harriman Campus. This work requires a shutdown of the Uptown Campus primary water main on Saturday, August 3rd to permit cut-ins and reconnections to the new water main. During this shutdown the Uptown Campus will be supplied by the back-up water service with the use of a temporary pump to boost water pressure to the campus. As a result, a minimal impact on the Uptown Campus is anticipated, with the possible exception of slightly lower than normal water pressures. There is also a chance that some sediment in the back-up water service could be released into the Campus water distribution system. This sediment is not harmful and if encountered, users should run the faucet until it passes/clears. However the following buildings will experience additional impacts: 1 Boor Sculpture Studio – will have no water for the duration of the shutdown and will be closed 2 Liberty Terrace Apartments – will experience reduced water pressures as one of its two supply lines will be shut down.. |
Estimated Start: 8/3/2019 5:00 AM |
Estimated End: 8/3/2019 12:00 PM |
More Details |
DUTCH QUAD - Temporary Road Closure |
Project Description / Scope: Due to the recent excessive heat, pavement schedules have changed. The road running along the south side of Dutch Quad will be closed on Friday to complete the road and loading dock paving. |
Estimated Start: 7/29/2019 6:00 AM |
Estimated End: 7/29/2019 5:00 PM |
More Details |
Dutch Quad - Temporary Power Shut down |
Project Description / Scope: As part of the overall renovation project, the electrical gear will be cleaned Monday August 5th. Power will be off for the entire quad. |
Estimated Start: 8/5/2019 6:00 AM |
Estimated End: 8/5/2019 6:00 PM |
More Details |
UHAll Fire Alarm |
Project Description / Scope: Testing of the smoke detectors and all other fire alarm associated devices within University Hall. Fire alarm devices will be deactivated during the test and should not alarm during this period. |
Estimated Start: 7/19/2019 7:45 AM |
Estimated End: 7/19/2019 2:00 PM |
More Details |
SUCF 01AX95 DT Schuyler Exterior Renovation Phase 3 |
Project Description / Scope: The Schuyler building will start exterior renovation and the parking lot from Washington Avenue will be closed during construction period. Please use the Hawley or Thurlow parking lots. |
Estimated Start: 7/15/2019 12:00 AM |
Estimated End: 1/31/2021 12:00 AM |
More Details |
Biology Building Class Lab Phase VI Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed During this work period contractors will be tying into the buildings existing acid waste line for new lab space on the ground floor. During this time we ask that nothing be dumped down lab drains. |
Estimated Start: 7/19/2019 4:00 AM |
Estimated End: 7/19/2019 10:00 AM |
More Details |
Biology Building Class Lab Phase VI Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed During this work period contractors will be saw cutting portions of the basement floor for new plumbing line installation. There may be lines in the floor that look like cracks but are cuts in the concrete. |
Estimated Start: 7/18/2019 4:00 AM |
Estimated End: 7/18//2019 4:00 PM |
More Details |
Dutch Quad - Temporary Road Closure |
Project Description / Scope: The road running along the south side of Dutch Quad will be closed daily to complete paving in this area: • Milling July 18th from 6am to 6pm • Fine Grade loading dock parking lot July 19th • All Paving on Road and Parking lot July 22nd |
Estimated Start: 7/18/2019 6:00 AM |
Estimated End: 7/22/2019 6:00 PM |
More Details |
Exterior Signage Installation |
Project Description / Scope: This project includes the installation of new building identification signage on the exterior of the Campus Center (north podium entrance), Campus Center East (south entrance and east wall), and Campus Center West (south entrance and north, west, south wall). During this work period, access to the entrances may be limited. |
Estimated Start: 7/09/2019 12:00 PM |
Estimated End: 7/12/2019 5:00 PM |
More Details |
Class Lab Phase VI Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed During this work period contractors will be saw cutting portions of the basement floor for new plumbing line installation. There may be lines in the floor that look like cracks but are cuts in the concrete. |
Estimated Start: 7/03/2019 12:00 AM |
Estimated End: 7/5/2019 2:00 PM |
More Details |
Renovate Building 27(BA) - Podium Deck replacement |
Project Description / Scope: The Podium Level North entrance to Social Science will be closed due to podium deck replacement associated with the Building 27 (Catskill) renovation project from 7/8/19 thru 8/15/19. Replacement of the existing concrete podium deck located to the south of Building 27 (Catskill) will continue until 8/15/19. This activity will create noise due to concrete removals. Access at the podium level will be re-routed to ensure passage around the work zones. For more details regarding this project, please visit; https://www.albany.edu/facilities/fp/building_27.html |
Estimated Start: 7/08/2019 5:00 AM |
Estimated End: 8/15/2019 5:00 AM |
More Details |
Colonial Gold Parking Lot Closure 6/26-6/27/19 |
Project Description / Scope: Colonial Student Lot C will be closed, as shown on the map, to facilitate tree removals in the lot. |
Estimated Start: 6/26/2019 5:00 AM |
Estimated End: 6/27/2019 3:30 AM |
More Details |
SUCF 011008-01Rehab Toilet Room for ADA Phase 1 |
Project Description / Scope: There will be a three (3) hour WATER shut down for the restrooms at West Side of the Lecture Center and the Library Basement to replace pipe supply on Tuesday June 25, 2019 from 6 am to 9 am. |
Estimated Start: 6/25/2019 6:00 AM |
Estimated End: 6/25/2019 9:00 AM |
More Details |
Lighting Replacement – Hallways and Stairwells |
Project Description / Scope: This project consists of replacing the lighting fixtures in the corridors and stairwells throughout Biology, Chemistry, Physics, Education, Humanities, Social Science, Arts & Science, and Fine Arts Buildings. The contractor may be working in multiple buildings at one time to complete the lighting installations and to configure the lighting and controls. |
Estimated Start: 5/28/2019 12:00 AM |
Estimated End: 7/19/2019 12:00 AM |
More Details |
Reconstruction of Stormwater Outfalls into Indian Pond |
Project Description / Scope: Stormwater outfalls at the east and west end of Indian Pond will be reconstructed. Portions of the Indian Pond Trail will be closed and there will be limited access at these locations. Construction vehicles will be on the paved sidewalk at the west side of Liberty Terrace. See attached map for work areas. |
Estimated Start: 6/17/2019 7:00 AM |
Estimated End: 6/28/2019 4:00 PM |
More Details |
Podium Tunnel asbestos abatement |
Project Description / Scope: A section of the Podium Tunnel area between the Arts & Sciences and Education building will be closed for asbestos abatement beginning on Sunday, June 23 @ 11:00 pm and ending on Tuesday 6/25 @ 7:00 am. During this closure, no pedestrian or Cushman traffic will be permitted through the area. Please see the attached map |
Estimated Start: 6/23/2019 11:00 PM |
Estimated End: 6/25/2019 7:00 AM |
More Details |
University Library Hot water shutdown |
Project Description / Scope: There will be a three (3) hour HOT water shut down for the entire Library building to replace the riser valves in the library second floor women’s room on Monday June 17 2019. |
Estimated Start: 6/17/2019 6:00 AM |
Estimated End: 6/17/2019 9:00 AM |
More Details |
Window Cleaning |
Project Description / Scope: Window cleaning will occur first at Massry Center (interior surfaces north & east and exterior surfaces north, east, and west) and then University Hall (all exterior surfaces). The contractor estimates two days for each building. At Massry, there will be a lift or scaffolding used for interior work and a bosun’s chair used for the exterior. At University Hall, an outdoor lift will be used. |
Estimated Start: 6/17/2019 7:00 AM |
Estimated End: 6/21/2019 4:00 PM |
More Details |
Uptown Campus Planning |
Project Description / Scope: The contractor will be milling, paving and restriping select sections of roadways and parking lots on the Uptown Campus. See attached map for locations. Included are portions of Carillon Drive West, Center Drive West, Social Science Dr. South, Great Dane Drive, Indian Visitor Lot, State Gold Lot and University Drive from SEFCU lot entrance to University Place entrance. Where one way traffic is necessary, |
Estimated Start: 6/10/2019 7:00 AM |
Estimated End: 6/19/2019 4:00 PM |
More Details |
DUTCH QUAD - Temporary Road Closure |
Project Description / Scope: The road running along the south side of Dutch Quad will be closed to complete utility work. It is scheduled to be closed from 7am Tuesday June 11th to 2pm Wednesday June 12th. Please look for detour signs in this area. |
Estimated Start: 6/11/2019 7:00 AM |
Estimated End: 6/12/2019 2:00 PM |
More Details |
Indian Quad Generator Testing Power Shutdown |
Project Description / Scope: An emergency preparedness test utilizing generators will take place at Indian Quad on Thursday June 6 starting at 10:00 AM. The entire quad will lose power for ½ hour starting at 10:00 am. Power will then be restored via generator and remain on generator until 1:30 PM. At 1:30 PM, the Quad will again lose power for 1/2 an hour and then return to normal power at 2:00 PM. |
Estimated Start: 6/6/2019 10:00 AM |
Estimated End: 6/6/2019 2:00 PM |
More Details |
Lighting Replacement – Hallways and Stairwells |
Project Description / Scope: A large portion of State student lot will be closed to support various campus events between Friday morning, 5/31 and Thursday afternoon 6/6. State Flex will still be open on all these dates except for Saturday, 6/1. |
Estimated Start: 6/3/2019 12:00 AM |
Estimated End: 6/12/2019 12:00 PM |
More Details |
State Student Parking Lot Closure |
Project Description / Scope: A large portion of State student lot will be closed to support various campus events between Friday morning, 5/31 and Thursday afternoon 6/6. State Flex will still be open on all these dates except for Saturday, 6/1. |
Estimated Start: 5/31/2019 7:00 AM |
Estimated End: 6/6/2019 3:30 PM |
More Details |
Boor Sculpture Studio - Install Signal Duct Bank |
Project Description / Scope: A new underground signal duct bank is to be installed to provide cabling pathways to the new ETEC building being constructed on the Harriman Campus. This new duct bank will connect an existing duct bank located in the access drive on the east side of Boor Sculpture Studio to another duct bank located in the parking lot behind the Studio. As this new duct bank will cross the entrance drive and the parking lot behind the Studio, vehicle access to the loading dock and parking lot behind Boor Studio will not be possible during the construction period. |
Estimated Start: 5/28/2019 7:00 AM |
Estimated End: 7/16/2019 7:00 AM |
More Details |
Lighting Replacement – Hallways and Stairwells |
Project Description / Scope: This project consists of replacing the lighting fixtures in the corridors and stairwells throughout the building. |
Estimated Start: 5/28/2019 12:00 AM |
Estimated End: 6/5/2019 12:00 PM |
More Details |
Lighting Replacement – Hallways and Stairwells |
Project Description / Scope: This project consists of replacing the lighting fixtures in the corridors and stairwells throughout the building. |
Estimated Start: 5/28/2019 12:00 AM |
Estimated End: 6/5/2019 12:00 PM |
More Details |
Backup Generator Repairs |
Project Description / Scope: Repair oil leak on the backup generator, which includes the following: install rear main seal, oil pan gasket, valve cover gaskets, turbo oil return seal, new oil and filters, perform full load test upon completion. The contractor is required to complete work related to the backup generator in the building. Additional notices will be released as necessary. |
Estimated Start: 5/20/2019 7:00 AM |
Estimated End: 5/31/2019 4:00 PM |
More Details |
Class Lab Phase VI Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology and Chemistry buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed During this work period asbestos abatement will take place in Biology in the basement and on the 2nd and 3rd floors. During this period there will be no access to this area. For short durations at night areas of the hallway may also be temporarily unavailable. |
Estimated Start: 5/20/2019 12:00 AM |
Estimated End: 6/26/2019 12:00 AM |
More Details |
Exterior Concrete Restoration |
Project Description / Scope: Work will include removal and repair of spalled/delaminated concrete of canopy ceiling, overhangs, columns and exterior building facades on State Quad. |
Estimated Start: 5/20/2019 12:00 AM |
Estimated End: 8/9/2019 12:00 AM |
More Details |
Fire Hydrants Test |
Project Description / Scope: Campus wide hydrants inspection, testing and maintenance, this will be performed per NFPA-25 and other applicable code requirements. ITM Shop staff will be performing the testing and recording of all the tests in iForms and Aim. |
Estimated Start: 5/20/2019 7:00 AM |
Estimated End: 8/20/2019 3:30 AM |
More Details |
HTHW Meter Installation – Associated Abatement |
Project Description / Scope: This project consists of the removal and disposal of short sections of asbestos containing pipe insulation at several locations throughout the podium and in the listed off-podium buildings. The general locations of this removal work are shown on the attached maps. The removal, handling, and disposal work will be conducted in accordance with all applicable federal, state, and local codes, rules and regulations. Prep work will begin on or about 5/14. The removal work will be done the week of 5/20 followed by final teardown and cleanup. There may be some minor restrictions to access and mobility within the tunnel during removal. Signage and barricades will be posted as required. |
Estimated Start: 5/14/2019 12:00 AM |
Estimated End: 6/5/2019 12:00 AM |
More Details |
Annual Power Plant Shutdown |
Project Description / Scope: The University's community should expect minimal heating and air conditioning service during the above mentioned period in the uptown campus buildings excluding areas serviced by local systems. Air conditioning will be working all areas, but effectiveness may diminish if the temperatures reach the 90's. Domestic hot water will not be available during this time except areas serviced by local systems, i.e… SEFCU arena, Boor Sculpture Studio, Liberty, Freedom and select residence halls and State and Indian Dining Rooms will have a measure of Domestic Hot Water. |
Estimated Start: 5/19/2019 4:00 PM |
Estimated End: 6/3/2019 8:00 AM |
More Details |
Paving between Podium and University Hall |
Project Description / Scope: The project involves installing flush concrete curb and paving the area near the Podium ramp at the Entry Plaza. The parking space nearest to the Entry Plaza will be blocked. The attached map shows the work area and blocked parking space. |
Estimated Start: 5/6/2019 7:00 AM |
Estimated End: 5/10/2019 3:30 PM |
More Details |
Uptown Campus Milling |
Project Description / Scope: The project involves milling and patching various roads and parking lots on the Uptown Campus. The areas to be milled and patched include Colonial Drive at the entrance to Colonial Quad, State Drive at the entrance to State Quad, Indian Drive at the entrance to Indian Quad and areas on the Service Drive near Dutch Quad. Where one way traffic is necessary during the work, flaggers will be present to direct traffic through the work zone. Milled areas will be marked with cones |
Estimated Start: 5/3/2019 9:00 AM |
Estimated End: 5/7/2019 3:30 PM |
More Details |
Backup Generator Repairs |
Project Description / Scope: Repair oil leak on the backup generator, which includes the following: install rear main seal, oil pan gasket, valve cover gaskets, turbo oil return seal, new oil and filters, perform full load test upon completion. The contractor is required to complete work related to the backup generator in the building. Additional notices will be released as necessary. |
Estimated Start: 5/20/2019 7:00 AM |
Estimated End: 5/23/2019 4:00 PM |
More Details |
Water Main Repair |
Project Description / Scope: Replace exterior water main valve, along with interior water main valve. Fine Arts will be without water until repair is complete. This only will affect the plumbing systems . |
Estimated Start: 5/23/2019 5:00 AM |
Estimated End: 5/23/2019 3:30 PM |
More Details |
Installation of Temporary OGS Access Road |
Project Description / Scope: A temporary access road to various OGS operated buildings and parking lots will be created to allow construction and upgrade to selected adjacent Harriman Campus underground utilities. The road is temporary. University drivers should be aware of the slight change in traffic patterns. |
Estimated Start: 4/17/2019 8:00 AM |
Estimated End: 5/10/2019 5:00 PM |
More Details |
Fine Arts Elevator Shutdown |
Project Description / Scope: Elevator Repair –need to move and adjust selector box and magnets in the hoist way of Fine Arts passenger elevator. |
Estimated Start: 4/19/2019 7:00 AM |
Estimated End: 4/19/2019 2:00 PM |
More Details |
Locker Room AC Upgrade |
Project Description / Scope: HVAC Shutdown for the entire PE Building. This will be for a short period required for locker room AC upgrades. Electricians must de-energize Penthouse MCC to safely perform work. |
Estimated Start: 3/26/2019 7:00 AM |
Estimated End: 3/27/2019 9:00 AM |
More Details |
Backup Generator Repair |
Project Description / Scope: A contractor will finalize the installation of the transfer switch for UHall backup generator and perform some tests on Friday 3/22/2019 between 6:00am and 7:00am. There may be momentary power fluctuations. |
Estimated Start: 3/22/2019 6:00 AM |
Estimated End: 3/22/2019 7:00 AM |
More Details |
Hot Water Shutdown |
Project Description / Scope: Hot water shutdown |
Estimated Start: 3/19/2019 7:00 AM |
Estimated End: 3/19/2019 3:30 PM |
More Details |
Generator Testing and Power Shut Down |
Project Description / Scope: An emergency preparedness test utilizing generators will take place at Indian Quad on Wednesday, March 20th starting at 10:00 AM. The entire quad will lose power for ½ hour starting at 10:00 am. Power will then be restored via generator and remain on generator until 1:30 PM. At 1:30 PM, the Quad will again lose power for 1/2 an hour and then return to normal power at 2:00 PM. |
Estimated Start: 3/20/2019 10:00 AM |
Estimated End: 3/20/2020 2:00 PM |
More Details |
Renovate Building 35 (Education) |
Project Description / Scope: Consultants will be performing an infrared thermographic survey of the roof. This work will occur during the evening between 6:30pm and 9:30pm. |
Estimated Start: 3/19/2019 6:30 PM |
Estimated End: 3/19/2019 9:30 PM |
More Details |
Concrete Restoration of the Academic Podium |
Project Description / Scope: This is the design phase of a project that involves the repair and restoration of the exterior building envelope and canopy structure of the academic podium. A crew of engineers will be on the academic podium inspecting the building facades, as well as the canopy structure of the entire podium. To properly inspect the canopy and upper floors of the building exteriors, the engineers will utilize a scissor lift. The lift will be moved throughout the podium as the engineers perform their inspections. |
Estimated Start: 3/18/2019 7:00 AM |
Estimated End: 3/22/2019 7:00 PM |
More Details |
Renovate Biology Second Floor – Forensic Biology |
Project Description / Scope: This project involves the renovation of two spaces on the second floor of Biology to create offices and lab space. During the time indicated above both the hot and cold water in the Biology building will be shut down and drained for the installation of new valves on the second floor. While this work is being performed bathrooms will be out of order and all sinks will be without water. Once the work is complete everything will be turned back on. |
Estimated Start: 3/18/2019 4:00 PM |
Estimated End: 3/18/2019 8:00 PM |
More Details |
Renovate Building 35 Education |
Project Description / Scope: Consultants and Contractors will be performing a Hazardous Materials Survey and HVAC Air System Testing during the week of March 18th. This work will occur during the day between 7:00am and 4:00pm. |
Estimated Start: 3/18/2019 7:00 AM |
Estimated End: 3/22/2019 4:00 PM |
More Details |
Second floor Biology Hallway |
Project Description / Scope: This project involves the renovation of two spaces on the second floor of Biology to create offices and lab space. During the time indicated above contractors will be in the ceiling of the Hallway removing ductwork in preparation for new ductwork. During this time access/egress through the corridor may be restricted and noise levels will be above average. The early morning time is to limit any inconvenience to building occupants. |
Estimated Start: 2/1/2019 5:00 AM |
Estimated End: 2/1/2019 8:00 AM |
More Details |
Penthouse Field Work |
Project Description / Scope: Design professionals will be conducting field investigation work in the Biology Penthouse on Friday 1/11/19. Please note that research that utilizes fume hoods should not be completed during this period as with standard operating procedure. Building Exhaust to the north half of the building will be shut down during this time. |
Estimated Start: 1/11/2019 8:00 AM |
Estimated End: 1/11/2019 12:00 PM |
More Details |
Forensics Lab Renovation |
Project Description / Scope: The Forensics Lab Renovation Project will take several vacant spaces on the second floor of Biology and convert them to a Forensics lab and office space. During this period there will be the abatement of hazardous materials from these rooms on the second floor of Biology. All work will happen at night to limit any disruption to daytime activity. |
Estimated Start: 1/2/2019 8:00 PM |
Estimated End: 1/9/2019 8:00 PM |
More Details |
Fire Suppression System Inspection, Testing & Maintenance |
Project Description / Scope: Fuel pumps will be unavailable Monday, January 7, 2019 between 11:00 a.m. and 2:00 p.m. while inspection, testing and maintenance services are being performed on the fire suppression system. |
Estimated Start: 1/7/2019 11:00 AM |
Estimated End: 1/7/2019 2:00 PM |
More Details |
Domestic Hot Water Interruption |
Project Description / Scope: 4 PM Thursday afternoon, December 20, 2018 work will be done on the HTHW main distribution in the Power Plant. The central campus heating system will be cooled, portions drained and a welded repair done. There will be an interruption to building heat and domestic hot water, Thursday evening on the Academic Podium, Campus Center, Indian and State Quads. Science Library, PE, Dutch and Colonial Quads. Steam in the Chemistry building will also be interrupted. Domestic Hot Water service and heat will be restored by Thursday evening December 20 9 PM |
Estimated Start: 12/20/2018 4:00 PM |
Estimated End: 12/20/2018 9:00 PM |
More Details |
Elevator Inspections/Tests |
Project Description / Scope: Campus wide elevator inspections/tests. CNY Elevator Inspection Company will be conducting the inspections and witnessing the tests performed by Kone and Bay State elevator companies on Campus. |
Estimated Start: 12/20/2018 7:00 AM |
Estimated End: 1/21/2019 4:00 PM |
More Details |
Rehab Toilet Rooms for ADA –Fine Arts Building |
Project Description / Scope: Restroom Material Survey |
Estimated Start: 11/21/2018 9:00 AM |
Estimated End: 11/21/2018 3:30 PM |
More Details |
Renovate Lecture Centers LC 1-2 |
Project Description / Scope:
A Hazmat consultant from Watts Engineering will be on site Friday (11/16) and Saturday (11/17) to perform a pre-construction existing materials survey of the Podium Promenade Deck and the northeast & northwest stairs to the Podium. |
Estimated Start: 11/16/2018 12:00 AM |
Estimated End: 11/17/2018 4:00 PM |
More Details |
Fire Sprinkler Annual Inspectionand Testing |
Project Description / Scope:
Campus wide-annual fire sprinkler inspection and testing done per National Fire Protect Association (NFPA) 25
requirement. Simplex Grinnell will be performing the work. |
Estimated Start: 11/20/2018 12:00 AM |
Estimated End: 12/31/2018 12:00 AM |
More Details |
Rehab Toilet Rooms for ADA |
Project Description / Scope:
Restroom Material Survey |
Estimated Start: 11/14/2018 9:00 AM |
Estimated End: 11/14/2018 3:30 PM |
More Details |
Earth Science Basement |
Project Description / Scope:
Removal and install of hthw coil by contractor Troy Boiler Works |
Estimated Start: 11/12/2018 7:00 AM |
Estimated End: 11/12/2018 3:30 PM |
More Details |
DUTCH QUAD - Loading Dock Work |
Project Description / Scope:
During site and construction activities at the Dutch Quad Loading Dock, there will be no parking for the duration of the work. NO PARKING begins this Monday.
|
Estimated Start: 11/5/2018 6:00 AM |
Estimated End: 12/1/2018 4:00 PM |
More Details |
Penthouse Field Work |
Project Description / Scope:
Design professionals will be conducting field investigation work in the Biology Penthouse on Friday 11/2/18. Please note that research that utilizes fume hoods should not be completed during this period as with standard operating procedure. Building Exhaust to the north half of the building will be shut down during this time.
|
Estimated Start: 11/2/2018 8:00 AM |
Estimated End: 11/2/2018 12:00 PM |
More Details |
Construction Staging Area in Courtyard Between Indian Quad & Podium |
Project Description / Scope:
The existing construction staging area in the courtyard between Indian Quad and the Podium will undergo alterations to support future construction projects in the Podium. These alterations will include: changes to temporary utility services within the site; resurfacing the site with crushed stone; installation of fencing to enclose the site; restoration of a portion of the site to turf (at a later date)
This work is to start on Friday October 26th and be completed by Friday November 9th, weather dependent. Work will occur on weekdays between 8:00AM and 4:30PM.
Noticeable impacts on traffic and parking are not anticipated. Periodic noise from construction activities may occur but is not anticipated to be significant in nature or of long duration.
|
Estimated Start: 10/26/2018 8:00 PM |
Estimated End: 11/9/2018 4:30 PM |
More Details |
Removal of Office Trailer in Courtyard Between Indian Quad & Podium |
Project Description / Scope:
The State University Construction Fund Construction Site Office trailer located in the courtyard between Indian Quad and the Podium is being moved to the ETEC construction site on Harriman Campus. For this move on the evening of Tuesday 10/9 three (3) accessible parking spaces located on Center Drive East just south of the Chemistry building will be closed and signage will be removed for the trailer exit path. On Wednesday 10/10 during the trailer removal, traffic on Center Drive East to University Drive will be temporarily stopped/redirected by flagmen until the tractor-trailer has exited onto University Drive. No vehicle parking will be permitted in the courtyard parking area of the Office Trailer Complex during the disassembly and removal of the trailer sections.
A trailer removal plan is attached for your information/reference.
|
Estimated Start: 10/9/2018 4:00 PM |
Estimated End: 10/10/2018 4:30 PM |
More Details |
Dutch Gold Lot |
Project Description / Scope:
The project involves removing five dead trees located in the area between the Dutch Gold lot and Service Building A. Parking will not be available in the work area shown in the attached drawing. The sidewalk along University Drive West, on the Dutch Gold lot side, will be closed while the work is underway. A sidewalk detour will be marked. Please consider using alternate routes and parking locations to avoid the work area if possible.
|
Estimated Start: 10/6/2018 7:00 AM |
Estimated End: 10/6/2018 4:00 PM |
More Details |
Uptown Campus Milling and Asphalt Patching |
Project Description / Scope:
The project involves milling and patching various roads and parking lots on the Uptown Campus. The areas to be patched include the west entrance of Collins Circle, University Drive West near Casey Stadium entrance, various locations in the Dutch Student Lot, Colonial Faculty Lot at the entrance to Colonial Quad, University Drive East near the State Recreation Fields, the Track and Field Service Road by the Science Library and the service roads near the Social Science Dock. Where one way traffic is necessary during the work, flaggers will be present to direct traffic through the work zone. Please consider using alternate routes to avoid work zones if possible.
|
Estimated Start: 10/2/2018 7:00 AM |
Estimated End: 10/2/2018 3:30 PM |
More Details |
Repair to water System |
Project Description / Scope:
Water will be shut off for the Physical Education building between the hours of 5 AM until at least 8 AM on September 25th for installation of new valves in room B0104.
|
Estimated Start: 9/25/2018 5:00 AM |
Estimated End: 9/25/2018 8:00 AM |
More Details |
Penthouse Field Work |
Project Description / Scope:
Design professionals will be conducting field investigation work in the Biology Penthouse on Friday 9/21/18. Please note that research that utilizes fume hoods should not be completed during this period as with standard operating procedure. No building functions will be modified other than no fume hood use.
|
Estimated Start: 9/21/2018 8:00 AM |
Estimated End: 9/21/2018 12:00 PM |
More Details |
Elevator Repair – Hydraulic Jack Replacement |
Project Description / Scope:
Mechanical replacement of heating coils, piping , and valves. Welding, grinding , and cutting processes.
|
Estimated Start: 9/18/2018 7:00 AM |
Estimated End: 10/30/2018 11:00 AM |
More Details |
Performing Arts Center - 3rd floor south mechanical room 334. |
Project Description / Scope:
Mechanical replacement of heating coils, piping , and valves. Welding, grinding , and cutting processes.
|
Estimated Start: 9/17/2018 4:00 AM |
Estimated End: 9/18/2018 8:00 AM |
More Details |
Penthouse Mechanical Room |
Project Description / Scope:
Welding repairs and replacement of heating equipment in the penthouse mechanical room.
Odors may be sensed within the building. Contact the Power Plant immediately 518-442-3444
|
Estimated Start: 9/10/2018 7:00 AM |
Estimated End: 9/10/2018 3:00 PM |
More Details |
PE Building Rehabilitation |
Project Description / Scope:
Building rehabilitation/Hazardous Materials Building Survey: visually inspect each space in the
building; sample in selected non-occupied locations.
|
Estimated Start: 9/5/2018 9:30 AM |
Estimated End: 9/7/2018 5:00 PM |
More Details |
All Uptown Campus Buildings - Primary Water Main Shutdown – 8/25/18 |
Project Description / Scope:
A shutdown of the Uptown Campus primary water main is scheduled for Saturday August 25th starting at 12 AM (midnight) to 4 AM. The NYS Office of General Services (OGS) is replacing/upgrading a water main on the Harriman Campus. This work requires a shutdown of the Uptown Campus primary water main on Saturday August 25th to permit cut-ins and reconnections to the new water main. During this shutdown the Uptown Campus will be supplied by the back-up water service with the use of a temporary pump to boost water pressure to the campus. As a result, a minimal impact on the Uptown Campus is anticipated, with the possible exception of slightly lower than normal water pressures. There is also a chance that some sediment in the back-up water service could be released into the Campus water distribution system. This sediment is not harmful and if encountered users should run the faucet until it passes/clears. However the following buildings will experience additional impacts: 1. Boor Sculpture Studio – will have no water for the duration of the shutdown 2. Liberty Terrace Apartments - will experience reduced water pressures as one of its two supply lines will be shut down. |
Estimated Start: 8/25/2018 12:00 AM |
Estimated End: 8/25/2018 4:00 AM |
More Details |
Building 27 (BA) – Podium Deck Replacement |
Project Description / Scope:
Replacement of the existing concrete podium deck located to the west of Building 27 (BA) will commence on 8/27/18 at 5:00am and continue daily until 12/15/18. This activity will create noise due to concrete removals. Loud activities are schedule to be completed prior to 9am each workday. Work will continue after 9am, but is not planned to include any loud activities. Access at the podium level will be re-routed to ensure passage around the work zones. For more details regarding this project, please visit; https://www.albany.edu/facilities/fp/building_27.html |
Estimated Start: 8/27/2018 5:00 AM |
Estimated End: 12/15/2018 5:00 PM |
More Details |
All Buildings - Water Main Shutdown |
Project Description / Scope:
A shutdown of the Uptown Campus primary water main is scheduled for Saturday August 18, 2018. The NYS Office of General Services (OGS) is replacing/upgrading a water main on the Harriman Campus. This work requires a shutdown of the Uptown Campus primary water main on Saturday August 18th to permit cut-ins and reconnections to the new water main. During this shutdown the Uptown Campus will be supplied by the back-up water service with the use of a temporary pump to boost water pressure to the campus. As a result, a minimal impact on the Uptown Campus is anticipated, with the possible exception of slightly lower than normal water pressures. There is also a chance that some sediment in the back-up water service could be released into the Campus water distribution system. This sediment is not harmful and if encountered users should run the faucet until it passes/clears. However the following buildings will experience additional impacts: 1. Boor Sculpture Studio – will have no water for the duration of the shutdown 2. Liberty Terrace Apartments - will experience reduced water pressures as one of its two supply lines will be shut down. |
Estimated Start: 8/18/2018 5:00 AM |
Estimated End: 8/18/2018 8:00 PM |
More Details |
Building 25 - Renovation |
Project Description / Scope: A section of University Drive West near Building #25 will be reduced to one-lane with a contractor flag person controlling traffic flow while the section of the road is being repaired. |
Estimated Start: 8/16/2018 6:00 AM |
Estimated End: 8/16/2018 4:00 PM |
More Details |
Dutch Quad - Temporary Road Closure |
Project Description / Scope: The road on the south side of Dutch Quad will be closed for approximately 4 hours for pavement installation. Please follow the Perimeter Road detour. The roadway will be reopened by the end of the work day. |
Estimated Start: 8/10/2018 6:00 AM |
Estimated End: 8/10/2018 4:00 PM |
More Details |
Lecture Center Sub-Basement Water Shutdown |
Project Description / Scope: There will be a complete shutdown of the hot and cold water in the Lecture Center Building to allow for valve/sprinkler piping work as part of the project. The water shutdown will start at 2:00am and be restored by 7:00am. During the water shutdown, the buildings rest rooms will be closed. |
Estimated Start: 8/10/2018 2:00 AM |
Estimated End: 8/10/2018 7:00 AM |
More Details |
Lecture Center Main Fountain |
Project Description / Scope: Main Fountain controls upgraded. Fountain Features and lighting may be erratic at times of changes and modifications. |
Estimated Start: 8/1/2018 12:00 AM |
Estimated End: 8/24/2018 12:00 AM |
More Details |
DUTCH QUAD - Temporary Road Closure |
Project Description / Scope: The road on the south side of Dutch Quad will be closed for the day for utility tie-in work under the roadway.Please follow the Perimeter Road detour.The roadway will be reopened at the end of the work day. Should weather not cooperate, Thursday 8/9 will be the rain date. |
Estimated Start: 8/8/2018 6:00 AM |
Estimated End: 8/8/2018 4:00 PM |
More Details |
Excelsior Drive Empire Commons |
Project Description / Scope:
REPLACING THE EXISTING ROOF-TOP UNIT ON THE EMPIRE COMMONS COMMUNITY BUILDING Excelsior Drive will be restricted with limited access or closed to traffic during the day while a crew completes scheduled work on the Empire Commons building. |
Estimated Start: 8/6/2018 7:00 AM |
Estimated End: 8/6/2018 4:00 AM |
More Details |
Domestic Hot Water Interruption |
Project Description / Scope: On Monday night, August 6, 2018 an emergency repair will be done on the HTHW main distribution under the Academic Podium. The central campus heating system will be cooled, portions drained and a welded repair done. There will be limited domestic hot water Monday evening and Tuesday morning on the Academic Podium, Campus Center, Indian and State Quads. Steam in Chemistry building will be interrupted The work may affect other areas Monday night and Tuesday morning, where there may be limited hot water in the Science Library, PE, Dutch and Colonial Quads. Chilled water for Campus cooling will be unaffected. Buildings not connected to the central plant HTHW system (Liberty, Empire Commons, Freedom, LSRB, Stadium, Building 25, etc…) will be unaffected by this outage. Domestic Hot Water service will be restored by Tuesday morning August 7, 2018 at 8 AM |
Estimated Start: 8/6/2018 5:00 PM |
Estimated End: 8/7/2018 8:00 AM |
More Details |
Biology Fire alarm Testing |
Project Description / Scope: During this work period crews will be in the Biology building testing portions of the fire alarm system affected by this project. Speakers and horns will be set off to verify proper operation but should only last for a short period. |
Estimated Start: 7/27/2018 6:00 AM |
Estimated End: 7/27/2018 8:00 AM |
More Details |
Dutch Tower |
Project Description / Scope: The Uptown Campus primary water main shutdown previously scheduled for this Saturday July 28th has now been rescheduled for Saturday August 4th due to weather and other work related delays. The NYS Office of General Services (OGS) is replacing/upgrading a water main on the Harriman Campus. This work requires a shutdown of the Uptown Campus primary water main on Saturday August 4th to permit cut-ins and reconnections to the new water main. During this shutdown, the Uptown Campus will be supplied by the back-up water service with the use of a temporary pump to boost water pressure to the campus. As a result, minimal impact on the Uptown Campus is anticipated with the possible exception of slightly lower than normal water pressures. However, the following buildings will experience additional impacts: 1. Boor Sculpture Studio – will have no water for the duration of the shutdown 2. Liberty Terrace Apartments - will experience reduced water pressures as one of its two supply lines will be shutdown. |
Estimated Start: 8/4/2018 5:50 AM |
Estimated End: 8/4/2018 8:00 PM |
More Details |
Dutch Tower |
Project Description / Scope: Updated - Due to poor weather conditions on 7/22, the survey was not performed and has been rescheduled to 7/29. As part of a continuing assessment, the towers will be inspected by an unmanned aircraft system (drone). The area immediately surrounding the tower will be restricted with no pedestrian access during the inspection. |
Estimated Start: 7/29/2018 11:00 AM |
Estimated End: 7/29/2018 4:00 PM |
More Details |
Dutch Quad - Temporary Road Closure - Pavement |
Project Description / Scope: The road on the south side of Dutch Quad will be closed for the day for pavement work of the roadway.Please follow the Perimeter Road detour.The roadway will be reopened at the end of the work day. |
Estimated Start: 8/13/2018 6:00 AM |
Estimated End: 8/14/2018 6:00 PM |
More Details |
Dutch Quad - Temporary Road Closure |
Project Description / Scope: The road on the south side of Dutch Quad will be closed for the day for utility tie-in work under the roadway.Please follow the Perimeter Road detour.The roadway will be reopened at the end of the work day. |
Estimated Start: 8/6/2018 6:00 AM |
Estimated End: 8/6/2018 6:00 PM |
More Details |
Dutch Quad - Temporary Power Interruption |
Project Description / Scope: All power on Dutch Quad will be off-line Saturday August 4 for the work day. This includes elevator service. |
Estimated Start: 8/4/2018 6:00 AM |
Estimated End: 8/4/2018 6:00 PM |
More Details |
Implement Master Lighting Plan |
Project Description / Scope: This project is to upgrade the canopy lighting throughout the Podium. During this work period contractors will be saw cutting some small areas of Promenade to prep installation for new pole lights. They will be saw cutting early in the morning which will create some noise, the noise should end by 8AM. |
Estimated Start: 7/23/2018 5:00 AM |
Estimated End: 7/23/2018 10:00 AM |
More Details |
All Uptown Campus Buildings |
Project Description / Scope:
The NYS Office of General Services (OGS) is replacing/upgrading a water main on the Harriman Campus. This work requires a shutdown of the Uptown Campus primary water main on Saturday July 28th to permit cut-ins and reconnections to the new water main. During this shutdown the Uptown Campus will be supplied by the back-up water service with the use of a temporary pump to boost water pressure to the campus. As a result, a minimal impact on the Uptown Campus is anticipated, with the possible exception of slightly lower than normal water pressures. However the following buildings will experience additional impacts: 1. Boor Sculpture Studio – will have no water for the duration of the shutdown 2. Liberty Terrace Apartments - will experience reduced water pressures as one of its two supply lines will be shut down. |
Estimated Start: 7/28/2018 5:50 AM |
Estimated End: 7/28/2018 8:00 PM |
More Details |
Removal of Office Trailer in Courtyard between Indian Quad & Podium |
Project Description / Scope: The UAlbany Construction Site Office trailer located in the courtyard between Indian Quad and the Podium is being moved to the ETEC construction site on Harriman Campus. For this move on Monday 7/23 evening three (3) accessible parking spaces located on Center Drive East just south of the Chemistry building will be closed and signage will be removed for the trailer exit path. On Tuesday 7/24 during the trailer removal, traffic on Center Drive East to University Drive will be temporarily stopped/redirected by flagmen until the tractor-trailer has exited onto University Drive. No vehicle parking will be permitted in the courtyard parking area of the Office Trailer Complex during the disassembly and removal of the trailer sections. A trailer removal plan is attached for your information/reference. |
Estimated Start: 7/23/2018 4:00 PM |
Estimated End: 7/24/2018 4:30 PM |
More Details |
Office Trailers in Courtyard between Indian Quad & Podium |
Project Description / Scope: The UAlbany Construction Site Office trailer located in the courtyard between Indian Quad and the Podium is being moved to the ETEC construction site on Harriman Campus. In preparation of this move there will be a short duration (2 hour) power shutdown to permit disconnection of the power service to this trailer. This power shutdown will affect the SUCF Construction Site Office trailer. This shutdown could potentially impact the UAlbany Office Trailer (the former Parking Management Office) as the power service to this trailer has not yet been confirmed. |
Estimated Start: 7/23/2018 7:00 AM |
Estimated End: 7/23/2018 9:30 AM |
More Details |
Academic Podium Tunnel |
Project Description / Scope: The project involves replacing the Overhead Doors at the Chemistry/Biology entrance and the Biology/Earth Science entrance. The entrance at Chemistry/Biology will be closed from 7/17 until 7/18. The entrance at Biology/Earth Science will be closed from 7/19 until 7/20. |
Estimated Start: 7/17/2018 7:00 AM |
Estimated End: 7/20/2018 5:00 PM |
More Details |
Tower Inspection |
Project Description / Scope: As part of a continuing assessment, the towers will be inspected by an unmanned aircraft system (drone). The area immediately surrounding the tower will be restricted with no pedestrian access during the inspection. |
Estimated Start: 7/22/2018 9:00 AM |
Estimated End: 7/22/2018 2:00 PM |
More Details |
DUTCH QUAD - Temporary Road Closure |
Project Description / Scope: The road on the south side of Dutch Quad will be closed for the day for utility tie-in work under the roadway.Please follow the Perimeter Road detour.The roadway will be reopened at the end of the work day. |
Estimated Start: 7/13/2018 6:00 AM |
Estimated End: 7/13/2018 4:00 PM |
More Details |
Dutch, Indian & Colonial TOWERS |
Project Description / Scope: As part of a continuing assessment, the towers will be inspected by an unmanned aircraft system (drone). The area immediately surrounding the tower will be restricted with no pedestrian access during the inspection. Dutch Tower 8am - 11am; Mohawk Tower 11:30am - 2:30pm; Colonial Tower 3pm - 4:30pm. Exact times may vary depending on the weather. The rain date for this work is 7/13. |
Estimated Start: 7/10/2018 8:00 AM |
Estimated End: 7/10/2018 4:00 PM |
More Details |
Lecture Center Minor Abatement |
Project Description / Scope: There will be minor hazardous materials abatement work in the Lecture Center sub-basement the mornings of Thursday, July 5th and Friday, July 6th. The work will occur within the mechanical rooms LC SB20 and LC B105 between 5:00am and 8:00am. |
Estimated Start: 7/5/2018 5:00 AM |
Estimated End: 7/6/2018 8:00 AM |
More Details |
RO Water Shutdown |
Project Description / Scope: The RO Water in the Chemistry Building will be shutdown on Thursday July 5, 2018 for approximately two hours to tie-in the RO for Lab CH 235. Note this will not affect domestic hot or cold water in the building. |
Estimated Start: 7/5/2018 8:00 AM |
Estimated End: 7/5/2018 10:00 PM |
More Details |
Podium Entrances |
Project Description / Scope: Four entrances at the Podium are to be repaired at Humanities and Education - south entrances at the ground level. The Contractor will be grinding concrete and sealing the area afterwards. Each entrance will be closed for approximately two hours and will be cordoned off accordingly. Pedestrians are urged to heed the signage and not walk on recently sealed concrete. |
Estimated Start: 7/3/2018 7:00 AM |
Estimated End: 7/3/2018 4:00 PM |
More Details |
Fire Hydrants Test |
Project Description / Scope: Campus wide hydrants inspection and testing |
Estimated Start: 7/1/2018 7:00 AM |
Estimated End: 9/30/2018 3:30 PM |
More Details |
DUTCH QUAD - Temporary Power Interruption |
Project Description / Scope: All power on Dutch Quad will be off-line Saturday July 7 for the work day. This includes elevator service. |
Estimated Start: 7/7/2018 6:00 AM |
Estimated End: 7/7/2018 6:00 PM |
More Details |
Class Lab Renovation Phase V |
Project Description / Scope: This project is Phase V in the renovation of labs and lab support spaces in Biology, Physics, and Chemistry. Work in these spaces includes demolition and asbestos abatement, upgrades to existing local mechanical systems, refurbishment of existing lab casework, new lab equipment, and new interior finishes. During this work period the power to the Biology Building will be shut down in order to install a new breaker in the main switch gear. While the shutdown is occurring there will be NO power to the building. All devices using electrical power should be turned off the night prior to the work. |
Estimated Start: 6/26/2018 4:00 AM |
Estimated End: 6/26/2018 8:00 AM |
More Details |
PARTIAL BUILDING POWER OUTAGE |
Project Description / Scope: There will be a partial building power outage/shutdown of the Lecture Center building starting on Saturday, June 23rd at 6:00am through Sunday, June 24th at 6:00pm. All of the buildings electrical systems will be shutoff in the areas shown on the attached maps map. Any equipment that uses power will not be operational, such as computers, lights, fans, refrigerators, vending machines, etc. Staff will not be allowed enter or occupy the building during the shutdown timeframes. Staff in the Lecture Center should turn off all office equipment (i.e. computers, printers, etc.) prior to the weekend of the power outage. |
Estimated Start: 6/23/2018 6:00 AM |
Estimated End: 6/24/2018 6:00 PM |
More Details |
DUTCH QUAD - Temporary Road Closure |
Project Description / Scope: The road on the south side of Dutch Quad will be closed for the day for utility tie-in work under the roadway.Please follow the Perimeter Road detour.The roadway will be reopened at the end of the work day. |
Estimated Start: 6/14/2018 6:00 AM |
Estimated End: 6/14/2018 6:00 PM |
More Details |
Replace Exterior Doors at Podium – Phase 01 |
Project Description / Scope:
The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH), Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces. Beginning Tuesday, June 12, the contractor will be removing stainless steel bollards and relocating the card access swipe and handicap paddle devices from the bollards to the face of the respective buildings. In addition, patch/repair work will be done on the concrete bands of the podium deck where the bollards were located. Building locations where the work will take place: Social Science - North and East Humanities – East Physics – East Chemistry - East At times, there may be a need to temporarily close the entrance during the work. Plan to use an alternate entry to the building. Additional notices will be released as necessary. |
Estimated Start: 6/12/2018 7:00 AM |
Estimated End: 6/30/2018 4:00 PM |
More Details |
Physical Education Building Domestic Water Shutoff |
Project Description / Scope: Domestic water will be shut off from approximately 3:00 AM to 4:00 AM on Monday, June 11, 2018 to add valve to the sprinkler system near the pool area. |
Estimated Start: 6/11/2018 3:00 AM |
Estimated End: 6/11/2018 4:00 PM |
More Details |
DUTCH QUAD - Temporary Road Closure |
Project Description / Scope: The road on the south side of Dutch Quad will be closed for the day for utility tie-in work under the roadway.Please follow the Perimeter Road detour.The roadway will be reopened at the end of the work day. |
Estimated Start: 6/8/2018 6:00 AM |
Estimated End: 6/8/2018 6:00 PM |
More Details |
Class Lab Renovation Phase V |
Project Description / Scope: This project is Phase V in the renovation of labs and lab support spaces in Biology, Physics, and Chemistry. Work in these spaces includes demolition and asbestos abatement, upgrades to existing local mechanical systems, refurbishment of existing lab casework, new lab equipment, and new interior finishes. During this work period, a crane will be onsite to load mechanical equipment onto the Biology building roof. During this operation there will be limited access to the Life Sciences loading dock and the Biology building itself. |
Estimated Start: 6/8/2018 5:00 AM |
Estimated End: 6/8/2018 10:00 AM |
More Details |
Uptown Campus Paving |
Project Description / Scope: The project involves paving various roads and parking lots on the Uptown Campus. The areas to be paved include Freedom Quad (road and on-street parking), Tri-Centennial Drive (from B25 entrance to University Drive West intersection), one lane of Collins Circle, Colonial Student Gold Lot South, Indian Drive (partial), Indian Student Gold Lot, University Drive West (from SEFCU bus stop entrance to SEFCU main lot entrance) and the Track and Field Service Road. The contractor will be milling, paving and restriping. Where one way traffic is necessary during the work, flaggers will be present to direct traffic through the work zone. Please consider using alternate routes to avoid work zones if possible. |
Estimated Start: 6/6/2018 6:00 AM |
Estimated End: 6/15/2018 4:00 PM |
More Details |
Renovate Lecture Center Sub-basement |
Project Description / Scope: There will be a crane on-site to lift materials/equipment to the roof of the Arts & Science Building. Staging/setup for the crane will be within the Building #27 project staging area. During the lifts pedestrian traffic will be briefly redirected. The crane lifts will occur Thursday (6/7/18) morning between 6:00am until 10:00am. |
Estimated Start: 6/7/2018 6:00 AM |
Estimated End: 6/7/2018 10:00 PM |
More Details |
Repair Catch Basin |
Project Description / Scope: The project involves paving the area around the catch basin located at the entrance of the State Faculty/Staff Parking lot on State Drive. While the paving is being done, the entrance will be closed. The exit, on Carillon Drive East, will be used as an entrance and exit while the work is ongoing. Detour signs will be in place to direct traffic to the entrance/exit on Carillon Drive East. |
Estimated Start: 6/6/2018 7:00 AM |
Estimated End: 6/6/2018 4:00 PM |
More Details |
Chemistry Building water Shutdown |
Project Description / Scope: The Chemistry Building water will be shut off at 5:00 AM for hot and cold valves to be installed for room 235 Project. Installation will be completed and water will be returned no later than 11 AM. |
Estimated Start: 6/5/2018 5:00 AM |
Estimated End: 6/5/2018 11:00 PM |
More Details |
Repair Catch Basin |
Project Description / Scope: The project involves repairing the catch basin located at the entrance of the State Faculty/Staff Parking lot on State Drive. While the repairs are being made, the entrance will be closed. The exit, on Carillion Drive East, will be used as entrance and exit while the repairs are being made. Detour signs will be in place to direct traffic to the entrance/exit on Carillion Drive East. |
Estimated Start: 5/31/2018 7:00 AM |
Estimated End: 6/1/2018 4:00 PM |
More Details |
Elevator testing and inspectionsn |
Project Description / Scope: Campus wide elevator inspection and testing |
Estimated Start: 6/4/2018 12:00 AM |
Estimated End: 6/15/2018 12:00 AM |
More Details |
LS-2095 Site Exploration |
Project Description / Scope: Explore site for AV and telecom |
Estimated Start: 5/29/2018 11:00 AM |
Estimated End: 5/29/2018 1:00 PM |
More Details |
Building 27 (BA) – Early Morning Roofing Work |
Project Description / Scope: Carillon Bells Will be OFF |
Estimated Start: 5/29/2018 4:00 AM |
Estimated End: 6/22/2018 5:00 PM |
More Details |
Carillion Bells OFF |
Project Description / Scope: Carillon Bells Will be OFF |
Estimated Start: 5/24/2018 12:30 AM |
Estimated End: 5/25/2018 3:30 PM |
More Details |
Academic Tunnel Near UHALL – Barricaded |
Project Description / Scope:
HTHW Outage Work: Welding in Podium Tunnel near UHall – Limited access – Barricaded Welding in Podium Tunnel near Physics – Limited access – Barricaded Welding in Podium Tunnel near Campus Center – Limited access – Barricaded |
Estimated Start: 5/24/2018 7:00 AM |
Estimated End: 5/30/2018 3:30 PM |
More Details |
Maintenance Projects at Clusters C & E Project / |
Project Description / Scope: Please avoid parking in areas surrounding C and E Clusters. Contractors will be working in and around those areas for the duration of the summer. |
Estimated Start: 5/23/2018 9:00 AM |
Estimated End: 8/30/2018 5:00 PM |
More Details |
Building 27 (BA) – Northwest Service Tunnel Closure 5/21/18 – 6/3/18 |
Project Description / Scope: The Northwest portion of the service tunnel within the Academic Podium will be closed due to construction activities starting at 7:00am on 5/21/18, and will continue to be closed until 5:00pm on 6/3/18. See the attached sketch for the extents of the Service Tunnel closure. This closure is related to construction activities associated with the Building 27 (BA) renovation. For more details regarding this project, please visit; Building 27 Project Details |
Estimated Start: 5/21/2018 7:00 AM |
Estimated End: 6/3/2018 5:00 PM |
More Details |
Renovate Building 27 (BA) – Roof Ballast Removal |
Project Description / Scope: Removal of Roofing Ballast associated with the Building 27 (BA) renovation will commence on 5/21/18 at 7:00am and continue daily until 5:00 pm on 5/25/18. This activity will create noise due to vacuum removal of the stone roof ballast system. For more details regarding this project, please visit; Building 27 Project |
Estimated Start: 5/21/2018 7:00 AM |
Estimated End: 5/25/2018 5:00 PM |
More Details |
Physical Education Building, Rehabilitation |
Project Description / Scope: Phased building rehabilitation/Field investigation for design |
Estimated Start: 5/23/2018 10:00 AM |
Estimated End: 5/23/2018 4:00 PM |
More Details |
University Library – Basement – North East Quadrant (See attached drawing) |
Project Description / Scope: Facilities will be removing the existing Air Handling System in the northeast corner of the Library Basement and connecting into a newly installed air handler in the same area. The shutdown is expected to take one week. Occupants can expect heating/cooling disturbance during the shutdown. The following week, the new air handler will be running but occupants may experience intermittent disturbances in heating and cooling as the new system is integrated. |
Estimated Start: 5/17/2018 7:00 AM |
Estimated End: 5/24/2018 5:00 PM |
More Details |
Renovate Building 27(BA) - Roof Ballast Removal |
Project Description / Scope: Removal of Roofing Ballast associated with the Building 27 (BA) renovation will commence on 5/21/18 at 7:00am and continue daily until 5:00 pm on 5/25/18. This activity will create noise due to vacuum removal of the stone roof ballast system. For more details regarding this project, please visit; https://www.albany.edu/facilities/fp/building_27.html |
Estimated Start: 5/21/2018 7:00 AM |
Estimated End: 5/25/2018 5:00 PM |
More Details |
Renovate Building 27 (BA) – Northwest Service Tunnel Closure |
Project Description / Scope:
The Northwest portion of the service tunnel within the Academic Podium will be closed due to construction activities starting at 7:00am on 5/21/18, and will continue to be closed until 5:00pm on 6/3/18. See the attached sketchfor the extents of the Service Tunnel closure. This closure is related to construction activities associated with the Building 27 (BA) renovation. For more details regarding this project, please visit; https://www.albany.edu/facilities/fp/building_27.html |
Estimated Start: 5/21/2018 7:00 AM |
Estimated End: 6/3/2018 5:00 PM |
More Details |
Social Science Building - Elevator Shutdown |
Project Description / Scope: The elevator in Social Sciences building will be shut down from Monday, May 21st to Tuesday, May 29th 2018. The contractor is performing work related to piston replacement for the elevator. Additional notices will be released as necessary. |
Estimated Start: 5/21/2018 12:00 AM |
Estimated End: 5/29/2018 12:00 AM |
More Details |
Inspection of Fire Suppression System |
Project Description / Scope: Albany Fire Extinguisher will be conducting the Semi-Annual inspection of the Fire Suppression System. There will be no fuel access during the inspection period. |
Estimated Start: 5/4/2018 8:00 AM |
Estimated End: 5/4/2018 12:00 PM |
More Details |
Lighting Mock Ups |
Project Description / Scope:
As part of a lighting upgrade project a few new light fixtures will be installed as a mock up for test and evaluation purposes. The mock ups will be installed in the following locations: Earth Science – 3rd floor east corridor, basement corridor, and west stairwell Library – Basement PE – Gymnasium SEFCU – exterior lights in small sections of roadway, sidewalk, and parking lot |
Estimated Start: 4/30/2018 12:00 AM |
Estimated End: 5/4/2018 12:00 AM |
More Details |
Fountain Minor Maintenance and Cleaning |
Project Description / Scope: Main Fountain will be drained on Friday April 27 and Re-filled on Thursday May 3rd for minor maintenance and cleaning. |
Estimated Start: 4/27/2018 12:00 AM |
Estimated End: 5/3/2018 12:00 PM |
More Details |
Podium Planters Landscaping |
Project Description / Scope: The project involves replanting and landscaping of the eight Podium planters located at the north and south ends of University Library and Performing Arts Center. |
Estimated Start: 4/30/2018 7:00 AM |
Estimated End: 5/9/2018 5:00 PM |
More Details |
Annual Power Plant Shutdown 2018 |
Project Description / Scope: The University's community should expect minimal heating and air conditioning service during the above mentioned period in the uptown campus buildings excluding areas serviced by local systems. Domestic hot water will not be available during this time except areas serviced by local systems, i.e… SEFCU arena, Boor Sculpture Studio, Liberty, Freedom and select residence halls and dining rooms. |
Estimated Start: 5/20/2018 4:00 PM |
Estimated End: 6/4/2018 8:00 AM |
More Details |
Replace Exterior Doors at Podium – Phase 01 |
Project Description / Scope: The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH), Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces. On Thursday April 26, the contractor/Simplex will be briefly testing building fire alarm systems and strobes at locations noted above where new Entry Door Replacements have been installed. Additional notices will be released as necessary. |
Estimated Start: 4/26/2018 6:00 AM |
Estimated End: 4/26/2018 8:00 AM |
More Details |
University Hall Test and Inspect Fire Alarm System |
Project Description / Scope: Annual testing and inspection of fire alarm smoke detectors and pull stations. Access to office hallways with ladders and equipment. |
Estimated Start: 4/24/2018 8:00 AM |
Estimated End: 4/25/2018 5:00 PM |
More Details |
Dutch Quad Site work Construction Preparataion |
Project Description / Scope: In preparation for Dutch Quad renovations, various removals and construction activities will be underway in the U-lounge, kitchen, servery and dining areas. |
Estimated Start: 3/26/2018 9:00 AM |
Estimated End: 5/19/2018 5:00 PM |
More Details |
Chemistry 235 Class Lab Phase V Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology, Chemistry and Physics buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed During this work period asbestos abatement will take place in Chemistry235. During this period there will be no access to this area. For short durations at night areas of the hallway may also be temporarily unavailable. |
Estimated Start: 3/19/2018 12:00 AM |
Estimated End: 3/30/2018 12:00 AM |
More Details |
Renovate Building 27 (BA) – Exterior Demolition |
Project Description / Scope:
Exterior demolition activities for the Business Administration Building (Bldg 27), will begin at 7am on 3/12/18 and conclude at 5pm on 3/18/18. Exterior Demolition activities will include; Removal of stone ballast on roofing of the building. Removal of Podium sealant system at column arches. For more details regarding this project, please visit; https://www.albany.edu/facilities/fp/building_27.html |
Estimated Start: 3/12/2018 7:00 AM |
Estimated End: 3/18/2018 5:00 PM |
More Details |
Class Lab Renovation Phase V – Duct Cleaning/DDT Installation |
Project Description / Scope: Class Lab Renovation Phase V is the improvement of several class labs in the Biology, Chemistry and Physics buildings. During the week of spring break contractors for the above mention project will be cleaning out ducts for the affected spaces in the tunnel. They will also be installing new DDT boxes in the tunnel that serve spaces in Biology, Physics and Chemistry. Please use caution in these areas as the contractors will be working in stationary spots using scaffolding, ladders and lifts. |
Estimated Start: 3/12/2018 12:00 AM |
Estimated End: 3/16/2018 12:00 AM |
More Details |
Campus Center Power Shutdown |
Project Description / Scope: There will be an electrical power shutdown for the entire Campus Center this coming Sunday 3/11 from 7 a.m. till 5 p.m. Please remember to shut off all computers and fax machines when leaving on Friday or Saturday to avoid any problems with a hard start when the power is restarted. The building will be closed to the public during this time frame. |
Estimated Start: 3/11/2018 7:00 AM |
Estimated End: 3/11/2018 5:00 PM |
More Details |
Renovate Lecture Center Sub-basement Glycol System Piping work |
Project Description / Scope: Piping tie-ins into the existing campus glycol cooling system need to occur for the new HVAC equipment. The glycol cooling system will be shut down between 3/8/18 thru 3/27/18. The Arts & Science building service tunnel and main basement corridor tie-in work will occur at night between 10:00pm and 6:00am from 3/11/18 thru 3/16/18. During this time there will be limited access thru the Arts & Science building service tunnel and main basement corridor. See attached sketch for locations of the work. There will be valve replacement work occurring during the day between 3/12/18 to 3/17/18 on the Arts & Science building roof to replace existing valves to the tower. There will be piping modification work occurring during the day between 3/19/18 to 3/23/18 in the Computer Center MER B14 pump room. Upon completion of all of this work the glycol cooling system will be refilled and made operational again. |
Estimated Start: 3/8/2018 8:00 AM |
Estimated End: 3/27/2018 8:00 AM |
More Details |
Building 27 (BA) – Northwest Service Tunnel Closure 3/10/18 – 3/17/18 |
Project Description / Scope: The Northwest portion of the service tunnel within the Academic Podium will be closed due to construction activities starting at 7:00am on 3/10/18, and will continue to be closed until 5:00pm on 3/17/18. See the attached sketch for the extents of the Service Tunnel closure. This closure is related to construction activities associated with the Building 27 (BA) renovation. For more details regarding this project, please visit; https://www.albany.edu/facilities/fp/building_27.html |
Estimated Start: 3/10/2018 7:00 AM |
Estimated End: 3/17/2018 5:00 PM |
More Details |
Replace Exterior Doors at Podium – Phase 01 |
Project Description / Scope:
The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH), Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces. The contractor will continue the Entry Door Replacements with work starting at Education – West Entrance (Work Zone 06) on or about Thursday, March 08. Education - East (WZ 07) entrances / exits will be available for use. Work includes erecting construction fences, installing temporary partition walls, concrete demo/removals, structural lintel installation, electrical work and installation of new entry doors. Demolition work will be noisy but is scheduled for 12am (midnight) to 8am during workdays in order to minimize disruption to building occupants. The entrance noted above will be closed to pedestrian traffic. The East entrance to the building at the podium level is open for use. Plan to use that entry/exit point or an alternate means through the basement level. Additional notices will be released as necessary. |
Estimated Start: 3/8/2018 6:00 AM |
Estimated End: 3/30/2018 4:00 PM |
More Details |
Building 27 (BA) – Podium Fire Sprinkler Interruption |
Project Description / Scope:
Fire Sprinkler Service will be interrupted starting on 2/21/18 at 6:00am and continue until 6:00pm on 2/21/18 at the following locations; Social Science (standpipes) Library (partial sprinklers and standpipes) Building 27 (BA) (standpipes) Arts and Science (sprinklers and standpipes) Fine Arts (standpipes) Earth Science (standpipes) Northern Lecture Centers (standpipes) North portion of Biology (Standpipes) This work is associated with the Renovation of Building 27 (Business Administration) For more details regarding this project, please visit; https://www.albany.edu/facilities/fp/building_27.html |
Estimated Start: 2/21/2018 6:00 AM |
Estimated End: 2/21/2018 6:00 PM |
More Details |
DUTCH QUAD - Site work |
Project Description / Scope: In preparation for Dutch Quad renovations, fencing will be installed on the southeast corner of the quad. |
Estimated Start: 2/9/2018 9:00 AM |
Estimated End: 2/9/2018 5:00 PM |
More Details |
Social Science Power Interruption |
Project Description / Scope: The Social Science Building will experience a power interruption on January 27, 2018, starting at 8am and completing at 12pm. Access to the Social Science building will not be available during the power interruption. This interruption is related to the Renovation of the Business Administration (Bldg 27) Building. For more details regarding this project, please visit; https://www.albany.edu/facilities/fp/building_27.html |
Estimated Start: 1/27/2018 8:00 AM |
Estimated End: 1/27/2018 12:00 PM |
More Details |
Social Science Power Interruption |
Project Description / Scope: The Social Science Building will experience a power interruption on January 27, 2018, starting at 8am and completing at 12pm. Access to the Social Science building will not be available during the power interruption. This interruption is related to the Renovation of the Business Administration (Bldg 27) Building. For more details regarding this project, please visit; https://www.albany.edu/facilities/fp/building_27.html |
Estimated Start: 1/27/2018 8:00 AM |
Estimated End: 1/27/2018 12:00 PM |
More Details |
Biology Tunnel Renovation Duct Cleaning |
Project Description / Scope: Class Lab Renovation Phase V is the improvement of several class labs in the Biology, Chemistry and Physics buildings. On Saturday (1/20/18) and Possibly Sunday (1/21/18) a vendor of A.O.W. will be in the tunnel on the podium cleaning out some duct work and may take up parts of the tunnel at times. |
Estimated Start: 1/20/2018 12:00 AM |
Estimated End: 1/21/2018 12:00 AM |
More Details |
Fuller Road Crane Service |
Project Description / Scope: On Monday morning 1/22/18. Crane service will need and obstruct the power plant parking on the Fuller road (West) side of the building. Contractor will be lifting an electric motor on the roof. Please re-route and park in an alternate location for the duration. |
Estimated Start: 1/22/2018 6:00 AM |
Estimated End: 1/22/2018 11:00 AM |
More Details |
Building 25 Hot Water Shutdown |
Project Description / Scope: There will be a shutdown of the domestic hot water in Building #25 to allow for valve/piping repairs as part of the project. The hot water shutdown will start at 7:00am and be restored as soon as the valve/piping repair work is completed. During the shutdown the domestic cold water will be operational and the buildings rest rooms will be open. |
Estimated Start: 1/19/2018 7:00 AM |
Estimated End: 1/19/2018 11:00 AM |
More Details |
OGS water shut down |
Project Description / Scope: During the evening of Friday, January 19th, OGS will be shutting off the main water supply for the University’s uptown campus so that maintenance work can be performed. From 6pm on 1/19 until 10pm on 1/19 the uptown campus will be relying our secondary water supply. Therefore, the campus will be on restricted water use. During this time, campus-supplied water should not be used, unless absolutely necessary. |
Estimated Start: 1/19/2018 6:00 PM |
Estimated End: 1/19/2018 10:00 PM |
More Details |
OGS water shut down |
Project Description / Scope: In the early morning of Monday, January 15th, OGS will be shutting off the main water supply for the University’s uptown campus so that maintenance work can be performed. During the time period 7am on 1/15 until 11am on 1/15 the uptown campus will be relying on our secondary water supply. Therefore, the campus will be on restricted water use. During this time campus-supplied water should not be used unless absolutely necessary. |
Estimated Start: 1/15/2018 7:00 AM |
Estimated End: 1/15/2018 11:00 AM |
More Details |
Renovate Lecture Centers 10 thru 15 |
Project Description / Scope: There will be a complete shutdown of the hot and cold water in the Lecture Center Building to allow for valve/piping removal as part of the project. The water shutdown will start at 7:00am and be restored as soon as the valve/piping removal work is completed. During the water shutdown, the buildings rest rooms will be closed. Please use rest rooms in other buildings. |
Estimated Start: 1/9/2018 7:00 AM |
Estimated End: 1/9/2018 12:00 PM |
More Details |
Water shutdown |
Project Description / Scope: The water in the biology building will be turned off on January 4th from 7AM to 3:30PM to install new valves on the existing mains to service newly renovated areas. This shutdown is for the entire building and will affect anything using water including hot/cold in sinks, bathrooms and safety showers. |
Estimated Start: 1/4/2018 7:00 AM |
Estimated End: 1/4/2018 12:00 AM |
More Details |
Campus Center Expansion |
Project Description / Scope: Please be advised that the power will be shut off to the Campus Center West Addition on Saturday, January 6th from approximately 7 a.m. through early afternoon in order to clean the electrical switch gear. Please shut down any electronic devices, (computers, fax machines, copiers, etc.) that might be sensitive to a power interruption. |
Estimated Start: 1/6/2018 7:00 AM |
Estimated End: 1/6/2018 12:00 PM |
More Details |
DUTCH QUAD - Site work |
Project Description / Scope: In preparation for Dutch Quad renovations, construction activities will begin in the area south and west of Dutch Quad and just north of the tennis courts, and also in the sunken garden. Trees, fencing and unused equipment will be removed. New stone base will be placed in select locations. |
Estimated Start: 12/18/2017 10:00 AM |
Estimated End: 1/15/2018 5:00 PM |
More Details |
Replace Exterior Doors at Podium – Phase 01 (Reminder!) |
Project Description / Scope: The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH), Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces. The contractor will continue the Entry Door Replacements with work starting at the Performing Arts Center Main Entrance (Work Zone 15) on Monday, December 18. Access to PAC will only be available through the buildings side entrances, Lecture Center Level or Podium Tunnel. Work includes erecting construction fences, installing temporary partition walls, concrete demo/removals, structural lintel installation, electrical work and installation of new entry doors. Demolition work will be noisy but is scheduled for 12am (midnight) to 8am during workdays in order to minimize disruption to building occupants. The main podium level entrances will be closed to all pedestrian traffic. Plan to use alternate entry/exit points noted above. Additional notices will be released as necessary. |
Estimated Start: 12/18/2017 6:00 AM |
Estimated End: 2/1/2018 4:00 PM |
More Details |
Renovate Lecture Center Sub-basement |
Project Description / Scope: Full gut renovation of (2) TV studios and supporting spaces. The main features of the work include; demolition, hazardous materials abatement, new electrical, data & IT, mechanical systems, ductwork, air handling units, cooling tower, ceilings and finishes. Contractor work hours for distributive noisy work will be at night from 11:00pm until 8:00am.. |
Estimated Start: 12/19/2017 11:00 PM |
Estimated End: 12/3/2018 6:00 PM |
More Details |
Class Lab Phase V Renovations |
Project Description / Scope: This project is to renovate several classroom labs in the Biology, Chemistry and Physics buildings. The work includes demolition and asbestos abatement, upgrades to local mechanical, electrical and plumbing systems. New finishes throughout the spaces are also being installed. During this work period asbestos abatement will take place in the tunnel adjacent to Biology, Chemistry and Physics. Hard walls have been set up in the tunnel to protect the containment tents. All vehicles should use caution when driving around these areas, especially when turning into the corners. Additional notices will be released as necessary. |
Estimated Start: 12/11/2017 12:00 AM |
Estimated End: 12/15/2018 12:00 AM |
More Details |
Elevator testing and inspections |
Project Description / Scope: Campus wide elevator inspection and testing. |
Estimated Start: 12/21/2017 12:00 AM |
Estimated End: 1/19/2018 12:00 AM |
More Details |
Performing Arts Center (PAC) – Podium Level Entrances |
Project Description / Scope: The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH), Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces. The contractor will continue the Entry Door Replacements with work starting at the Performing Arts Center Main Entrance (Work Zone 15) on Monday, December 18. Access to PAC will only be available through the buildings side entrances, Lecture Center Level or Podium Tunnel. Work includes erecting construction fences, installing temporary partition walls, concrete demo/removals, structural lintel installation, electrical work and installation of new entry doors. Demolition work will be noisy but is scheduled for 12am (midnight) to 8am during workdays in order to minimize disruption to building occupants. The main podium level entrances noted above will be closed to all pedestrian traffic. Plan to use alternate entry/exit points noted above. Additional notices will be released as necessary. |
Estimated Start: 12/18/2017 6:00 AM |
Estimated End: 2/1/2018 4:00 PM |
More Details |
University Library, Performing Arts Center, Computer Center, Fine Arts Center, |
Project Description / Scope:
Bathrooms will be closed for approximately 30 minutes for the visual verification of existing toilet room facilities and airflow testing. Testing will also occur in corridors near toilet rooms. In addition air flow testing will be conducted in the following locations: Lecture Center: Corridor SB 36A. Library: Corridor 0023, Work Room 0119 Performing Arts Center: rm 0034, 0068, 0111, 0148, 0319 and 0332 |
Estimated Start: 12/6/2017 7:00 AM |
Estimated End: 12/8/2017 4:00 PM |
More Details |
Computing Center Decommissioning |
Project Description / Scope: There will be a test of the fire alarm system that could affect alarms throughout the building. |
Estimated Start: 12/1/2017 7:30 AM |
Estimated End: 12/1/2017 8:30 PM |
More Details |
Milne Basement Classroom & Corridor |
Project Description / Scope: This project converts an existing Storage Room (001) in the basement level of Milne Hall into an Interactive Classroom. The classroom will support interactive general lecture and support technology and be utilized as an assembly space. Work involves selective demolition, installation of new doors, partitions, finishes, ceilings, lighting, mechanical systems, and AV/IT equipment. The work also includes modifications of existing storage rooms into Mechanical and AV/IT Rooms, as well as modifications to existing basement toilet rooms. The contractor will begin mobilization and selective interior demo on or about Monday, November 27th. Additional notices will be released as necessary. |
Estimated Start: 11/27/2017 6:00 AM |
Estimated End: 08/31/2017 5:00 PM |
More Details |
OGS water shut down |
Project Description / Scope: In the early morning of Friday, November 24th, OGS will be shutting off the main water supply for the University’s uptown campus so that maintenance work can be performed. During the time period from 6am on 11/24 until 12pm on 11/27 the uptown campus will be relying on our secondary water supply. Therefore the campus will be on restricted water use, during which time campus-supplied water should not be used unless absolutely necessary. |
Estimated Start: 11/24/2017 6:00 AM |
Estimated End: 11/27/2017 12:00 PM |
More Details |
SEFCU Arena – Elevator Shutdown / UPDATE! |
Project Description / Scope: The overall project represents Phase 03 of the Campus Elevator Renovation Program and will address the renovation, replacement or repair of six (6) elevators/lift systems on campus. The elevators/lifts included in this project are as follows- Linear Accelerator (1970), Physical Education (1968), Draper Hall (1974), Waterbury Hall kitchen freight lift (1959), SEFCU Arena (1992), Lift in Fine Arts (1967) and the conversion of service keys in 18 elevators to campus standard keys. The elevator in SEFCU Arena will be off-line on Friday, December 01 for the entire day. The contractor is required to complete work related to the new elevator installation in the building. Additional notices will be released as necessary. |
Estimated Start: 12/01/2017 6:00 AM |
Estimated End: 12/01/2017 5:00 PM |
More Details |
Sefcu Elevator Shutdown |
Project Description / Scope: The overall project represents Phase 03 of the Campus Elevator Renovation Program and will address the renovation, replacement or repair of six (6) elevators/lift systems on campus. The elevators/lifts included in this project are as follows- Linear Accelerator (1970), Physical Education (1968), Draper Hall (1974), Waterbury Hall kitchen freight lift (1959), SEFCU Arena (1992), Lift in Fine Arts (1967) and the conversion of service keys in 18 elevators to campus standard keys. The elevator in SEFCU Arena will be off-line on Friday, November 24 for the entire day. The contractor is required to complete work related to the new elevator installation in the building. Additional notices will be released as necessary. |
Estimated Start: 11/24/2017 6:00 AM |
Estimated End: 11/24/2017 5:00 PM |
More Details |
Physics – West / Podium Level Entrance |
Project Description / Scope: The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH), Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces. The contractor will continue with the Entry Door Replacement Work at Physics – West (Work Zone 08) beginning on or about Monday, November 06. Physics - East (WZ 09) currently has new accessible entrances / exits. Work includes erecting construction fences, installing temporary partition walls, concrete demo/removals, structural lintel installation, electrical work and installation of new entry doors. Demolition work will be noisy but is scheduled for 12am (midnight) to 8am during workdays in order to minimize disruption to building occupants. The entrance noted above will be closed to pedestrian traffic. The East entrance to the building at the podium level is open for use. Plan to use that entry/exit point or an alternate means through the basement level. Additional notices will be released as necessary. |
Estimated Start: 11/06/2017 6:00 AM |
Estimated End: 12/31/2017 4:00 AM |
More Details |
Planter roof replacement |
Project Description / Scope: Remove trees, transplant 1 tree, remove sand, remove roofing, replace roof, back fill. We will be removing a few trees. Moving a Tree from library to an area down by lacrosse fields. Grounds will Dig hole and prepare to transplant. Roof shop will remove sand from planter, remove roofing, clean up, prepare for roofing roof, then back fill planter. |
Estimated Start: 11/03/2017 7:00 AM |
Estimated End: 12/14/2017 12:00 AM |
More Details |
Carillon Drive East near Life Science Lane |
Project Description / Scope: Paving work is scheduled for the unfinished parking area on Carillon Dr. East near Life Science Lane. Additional accessible parking spaces will be added by paving, and appropriate striping and signage installed. |
Estimated Start: 11/01/2017 7:00 AM |
Estimated End: 11/04/2017 3:00 PM |
More Details |
Biology – North Podium Level Entrance |
Project Description / Scope:
The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH), Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces. The contractor will continue with the Entry Door Replacement Work at Biology – North (Work Zone 14) beginning Monday, November 06. Biology – South & West (WZs 12 & 13) are now accessible entrances / exits. Work includes erecting construction fences, installing temporary partition walls, concrete demo/removals, structural lintel installation, electrical work and installation of new entry doors. Demolition work will be noisy but is scheduled for 12am (midnight) to 8am during workdays in order to minimize disruption to building occupants. The entrance noted above will be closed to pedestrian traffic. The South & West entrances to the building at the podium level are open for use. Plan to use these entry/exit points at the building including alternate means through the basement level. Additional notices will be released as necessary. |
Estimated Start: 11/06/2017 6:00 AM |
Estimated End: 12/31/2017 4:00 PM |
More Details |
Draper 107 Renovation |
Project Description / Scope: There will be hazardous material removal at Draper Hall in Room 107. The work will be done in the evening to reduce any inconvenience. While crew is working at night areas of Draper Hall will be inaccessible to everyone. |
Estimated Start: 10/23/2017 12:00 AM |
Estimated End: 11/3/2017 5:00 PM |
More Details |
SEFCU Arena Buildings – Elevator Shutdown Elevator Renovations – Phase 03 |
Project Description / Scope:
The overall project represents Phase 03 of the Campus Elevator Renovation Program and will address the renovation, replacement or repair of six (6) elevators/lift systems on campus. The elevators/lifts included in this project are as follows- Linear Accelerator (1970), Physical Education (1968), Draper Hall (1974), Waterbury Hall kitchen freight lift (1959), SEFCU Arena (1992), Lift in Fine Arts (1967) and the conversion of service keys in 18 elevators to campus standard keys. The elevator in SEFCU Arena will be temporarily shut down on Monday, October 23 during the following times:
The contractor is required to complete work related to the new elevator installation in the buildings. Additional notices will be released as necessary. |
Estimated Start: 10/23/2017 7:00 AM |
Estimated End: 10/23/2017 11:00 AM |
More Details |
Dorm Quads Canopy Repair |
Project Description / Scope: The concrete canopy areas will be inspected on the Colonial, Dutch, Indian and State Quads. A high lift will be used in the inspection. |
Estimated Start: 10/18/2017 9:00 AM |
Estimated End: 10/20/2017 6:00 PM |
More Details |
Social Science – South Podium Level Entrance |
Project Description / Scope:
The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH), Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces. The contractor will continue with the Entry Door Replacement Work at Social Science – South (Work Zone 03) beginning Tuesday, October 17. Social Science – North & West (WZs 01 & 02) were previously completed. Work includes erecting construction fences, installing temporary partition walls, concrete demo/removals, structural lintel installation, electrical work and installation of new entry doors. Demolition work will be noisy but is scheduled for 12am (midnight) to 8am during workdays in order to minimize disruption to building occupants. The entrances noted above will be closed to pedestrian traffic. The North and West entrances of the building at the podium level is open for use. Plan to use other alternate entry/exit points at the building including through the basement level. Additional notices will be released as necessary. |
Estimated Start: 10/17/2017 6:00 AM |
Estimated End: 12/1/2017 5:00 PM |
More Details |
Buisness Administration Renovate Building 27 (BA) – Site Fencing & Building Access |
Project Description / Scope:
Construction for the Renovation of the Business Administration building (Bldg 27) will begin on October 17, 2017. This project has a planned completion date of February 19, 2020. See the attached map for extents of the work area. Access to the Business Administration Building will not be available at the Podium level (first floor). Access to Mail Services and Rapid Copy should occur via the open staircase west of the Business Administration building and through the Arts & Sciences building. Handicapped access from the Podium level to Mail Services and Rapid Copy shall be via the Arts & Sciences building. For more details regarding this project, please visit; https://www.albany.edu/facilities/fp/building_27.html |
Estimated Start: 10/17/2017 7:00 AM |
Estimated End: 02/19/2020 5:00 PM |
More Details |
Renovate Building 27 (BA) – Parking Access |
Project Description / Scope:
The eastern parking spaces located in the Podium West parking lot will no longer be available starting the morning of 10/17/17. See the attached sketch for extents of the parking area impacted. This location will become the future temporary location for Mail Services and Rapid Copy. For more details regarding this project, please visit; https://www.albany.edu/facilities/fp/building_27.html |
Estimated Start: 10/17/2017 7:00 AM |
Estimated End: 02/19/2020 5:00 PM |
More Details |
Chemistry – Podium Level Entrances |
Project Description / Scope:
The overall project is a first phase of the Uptown Campus Exterior Door Replacement project and will address the replacement of the main building entry doors at seven locations on the Uptown Campus – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH), Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces. The contractor will continue with the Entry Door Replacement Work at Chemistry – West (Work Zone 10) beginning Wednesday, October 11. Chemistry - East (WZ 11) was previously completed. Work includes erecting construction fences, installing temporary partition walls, concrete demo/removals, structural lintel installation, electrical work and installation of new entry doors. Demolition work will be noisy but is scheduled for 12am (midnight) to 8am during workdays in order to minimize disruption to building occupants. The entrances noted above will be closed to pedestrian traffic. The East entrance of Chemistry at the podium level is open for use. Plan to use other alternate entry/exit points at the building including through the basement level. Additional notices will be released as necessary. |
Estimated Start: 10/11/2017 6:00 AM |
Estimated End: 10/17/2017 4:00 PM |
More Details |
PE Building Rehabilitation |
Project Description / Scope: Phased gut rehabilitation of the PE Building. Consultant walk-thru: a group of about 25 consultants will walk thru the PE building, visiting various locations and discussing issues as they move through. |
Estimated Start: 10/10/2017 1:00 PM |
Estimated End: 10/10/2017 2:30 PM |
More Details |
PE & SEFCU Arena Buildings – Elevator Shutdowns |
Project Description / Scope:
The overall project represents Phase 03 of the Campus Elevator Renovation Program and will address the renovation, replacement or repair of six (6) elevators/lift systems on campus. The elevators/lifts included in this project are as follows- Linear Accelerator (1970), Physical Education (1968), Draper Hall (1974), Waterbury Hall kitchen freight lift (1959), SEFCU Arena (1992), Lift in Fine Arts (1967) and the conversion of service keys in 18 elevators to campus standard keys.The building power to Physical Education will be temporarily shut down on Friday early morning, October 06 from 3:00am to 6:00am in order for the contractor to complete electrical work related to the new elevator installation in the building. Please turn off any computers, printers and any other sensitive electronic equipment that may be susceptible to damage when the building re-energized. Additional notices will be released as necessary.The elevators in Physical Education and SEFCU Arena will be temporarily shut down on Monday, October 09 during the following times: SEFCU Arena – 7:00am to 11:00am Physical Education – 11:00am to 3:00pm The contractor is required to complete work related to the new elevator installation in the buildings. Additional notices will be released as necessary. |
Estimated Start: 10/9/2017 7:00 AM |
Estimated End: 10/9/2017 3:00 PM |
More Details |
PE Building – Friday Power Shutdown (Part 2) |
Project Description / Scope:
The overall project represents Phase 03 of the Campus Elevator Renovation Program and will address the renovation, replacement or repair of six (6) elevators/lift systems on campus. The elevators/lifts included in this project are as follows- Linear Accelerator (1970), Physical Education (1968), Draper Hall (1974), Waterbury Hall kitchen freight lift (1959), SEFCU Arena (1992), Lift in Fine Arts (1967) and the conversion of service keys in 18 elevators to campus standard keys. The building power to Physical Education will be temporarily shut down on Friday early morning, October 06 from 3:00am to 6:00am in order for the contractor to complete electrical work related to the new elevator installation in the building. Please turn off any computers, printers and any other sensitive electronic equipment that may be susceptible to damage when the building re-energized. Additional notices will be released as necessary. |
Estimated Start: 10/6/2017 3:00 AM |
Estimated End: 10/6/2017 6:00 AM |
More Details |
PE Building – Wednesday Power Shutdown (Part 1) |
Project Description / Scope:
The overall project represents Phase 03 of the Campus Elevator Renovation Program and will address the renovation, replacement or repair of six (6) elevators/lift systems on campus. The elevators/lifts included in this project are as follows- Linear Accelerator (1970), Physical Education (1968), Draper Hall (1974), Waterbury Hall kitchen freight lift (1959), SEFCU Arena (1992), Lift in Fine Arts (1967) and the conversion of service keys in 18 elevators to campus standard keys. The building power to Physical Education will be temporarily shut down on Wednesday early morning, October 04 from 5:00am to 6:00am in order for the contractor to complete electrical work related to the new elevator installation in the building. Please turn off any computers, printers and any other sensitive electronic equipment that may be susceptible to damage when the building re-energized. Additional notices will be released as necessary. |
Estimated Start: 10/4/2017 5:00 AM |
Estimated End: 10/4/2017 6:00 AM |
More Details |
Computing Center Decommissioning |
Project Description / Scope: There will be a test of the fire alarm system that could affect alarms throughout the building. |
Estimated Start: 9/27/2017 7:00 AM |
Estimated End: 9/27/2017 8:00 AM |
More Details |
Physical Education Building Electrical repairs |
Project Description / Scope: In order to complete needed repairs to restore power to the pool and elevator in the Physical Education Building, a temporary shutdown of building-wide electrical power will be needed on the morning of Tuesday, September 26th from 6:00 am until approximately 6:30am. |
Estimated Start: 9/26/2017 5:00 AM |
Estimated End: 9/26/2017 5:30 AM |
More Details |
Computing Center Decommissioning |
Project Description / Scope: There will be a test of the fire alarm system that could affect alarms throughout the building. |
Estimated Start: 9/26/2017 7:00 AM |
Estimated End: 9/26/2017 7:30 AM |
More Details |
Domestic Hot Water Interruption |
Project Description / Scope: After class, Wednesday September 20, 2017 an emergency repair will be done on the HTHW main distribution under the Academic Podium. The central campus heating system will be cooled, portions drained and a welded repair done. There will be limited domestic hot water, Wednesday evening, Thursday day and Thursday night on the Academic Podium, Science Library, Campus Center, PE, Dutch, Indian, State and Colonial Quads. Wednesday night and Thursday day, there will be no hot water in the Humanities, Education, Campus Center, Physics, Chemistry, Biology, Earth Science, PAC, U Hall, Fine Arts, Indian and State Quads. All domestic hot water service will be restored by 10 AM Friday morning before classes resume.Building cold water will be unaffected. Chilled water for Campus cooling will be unaffected. Buildings not connected to the central plant HTHW system (Liberty, Empire Commons, Freedom, LSRB, Stadium, Building 25, etc…) will be unaffected by this outage. |
Estimated Start: 9/20/2017 2:30 PM |
Estimated End: 9/22/2017 10:00 AM |
More Details |
Biology Building – Asbestos Abatement |
Project Description / Scope:
This project is Phase V in the renovation of labs and lab support spaces in Biology, Physics, and Chemistry. Work in these spaces includes demolition and asbestos abatement, upgrades to existing local mechanical systems, refurbishment of existing lab casework, new lab equipment, and new interior finishes. During this work period, asbestos abatement will take place starting Monday, September 18 in Biology, with similar work in the other buildings taking place later. Additional notices will be released as necessary. |
Estimated Start: 9/18/2017 3:30 PM |
Estimated End: 10/13/2017 11:00 PM |
More Details |
Physics Building - Water Shutdown |
Project Description / Scope: Water shutdown to install safety shower in basement Laboratory. During the shutdown there will be no hot or cold running water. |
Estimated Start: 9/14/2017 5:00 PM |
Estimated End: 9/14/2017 8:00 AM |
More Details |
Renovate Lecture Centers 10 thru 15 |
Project Description / Scope: Full gut renovation of Lecture Centers 10 thru 15, including demolition, abatement, new electrical, data & IT, new ductwork and air handling units, new ceilings and finishes. Contractor work hours are at night from 11:00pm until 8:00am. |
Estimated Start: 9/10/2017 11:00 PM |
Estimated End: 6/15/2018 8:00 AM |
More Details |
POWER Shut Down at PE Building - Cancelled |
Project Description / Scope: Please note that this work was completed without interruption during the normal work week. There will be no power shut down. |
Estimated Start: 9/9/2017 5:00 AM |
Estimated End: 9/9/2017 9:30 PM |
More Details |
Dorm Quads Canopy Repair |
Project Description / Scope: The concrete canopy areas will be inspected on the Colonial, Dutch, Indian and State Quads. A high lift will be used in the inspection. Each Quad will take 2-3 weeks to complete inspection, starting at Colonial Quad. |
Estimated Start: 9/7/2017 9:00 AM |
Estimated End: 10/13/2017 7:00 PM |
More Details |
OGS water shut down |
Project Description / Scope: In the early morning of Saturday, September 9th, OGS will be shutting off the main water supply for the University’s uptown campus so that maintenance work can be performed. During the time period from 4am to 6am on that morning the entire uptown campus will be on restricted water use during which time campus-supplied water should not be used unless absolutely necessary. |
Estimated Start: 9/9/2017 4:00 AM |
Estimated End: 9/9/2017 6:00 AM |
More Details |
Physical Education Building - New Track & Field Trailers |
Project Description / Scope:
On Saturday, September 9, electrical tie-ins are scheduled as needed for the new Track & Field Office building. This requires the shut down of power at the Physical Education building for a short time. PLEASE shut down all electronics by Friday night close of business. |
Estimated Start: 9/9/2017 5:00 AM |
Estimated End: 9/9/2017 9:30 AM |
More Details |
Science Library, Lower Level and Second Floor |
Project Description / Scope: Two external contractors are continuing the process of relocating existing second floor shelving and books to the lower level of the Science Library. There will be access on the second floor for students to utilize group study rooms and group study, and for the offices of Advisement Plus. The lower level of the Science Library will have restricted access to library staff and student’s part of the International Education program using the lower level classrooms until the work is completed. |
Estimated Start: 6/26/2017 8:00 AM |
Estimated End: 9/30/2016 12:00 AM |
More Details |
Biology – Podium Level Entrances |
Project Description / Scope: The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH), Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces. The contractor will continue with the Entry Door Replacement Work at Biology – South (Work Zone 12) and Biology – West (Work Zone 13) beginning Tuesday, September 05. Work includes erecting construction fences, installing temporary partition walls, concrete demo/removals, structural lintel installation, electrical work and installation of new entry doors. Demolition work will be noisy but is scheduled for 12am (midnight) to 8am during workdays in order to minimize disruption to building occupants. The entrances noted above will be closed to pedestrian traffic. The north entrance of Biology at the podium level will be open for use. Plan to use other alternate entry/exit points at the building including through the basement level. Additional notices will be released as necessary. |
Estimated Start: 9/5/2017 6:00 AM |
Estimated End: 11/17/2017 4:00 PM |
More Details |
Tree removal |
Project Description / Scope: A contractor will be removing several trees on East Carillon Drive, adjacent to a section of the Reserved Parking area on the north side of the podium. The affected parking area will be blocked off. |
Estimated Start: 8/18/2017 6:30 AM |
Estimated End: 8/18/2017 11:00 AM |
More Details |
Smoke Purge System Testing |
Project Description / Scope: On Monday morning August 21 at 8:30 am facilities will run a 5-minute test of the smoke purge system at the Massry School of Business. The test requires running the large exhaust fans located on the roof. There will be noise in the public spaces. Tenants are not required to leave during the test but may do so for the duration of the test. |
Estimated Start: 8/21/2017 8:30 AM |
Estimated End: 8/21/2017 8:35 AM |
More Details |
All Buildings OGS Water Shut Down |
Project Description / Scope: Saturday August 19th OGS will be shutting off the main water supply for maintenance work, during which time all of the University of Albany’s uptown campus will be on restricted water use between 7AM and 9AM. |
Estimated Start: 8/19/2017 7:00 AM |
Estimated End: 8/19/2017 9:00 AM |
More Details |
Social Science, Humanities, Education, Physics, Chemistry & Biology – Podium Level Entrances |
Project Description / Scope: The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH), Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces. The contractor will be working to re-install vestibule ceiling components at each of the building entries where the ceiling was previously removed pending the installation of new doors. Door work in most of these areas is being delayed to Summer 2018. |
Estimated Start: 8/15/2017 6:00 AM |
Estimated End: 8/25/2017 4:00 PM |
More Details |
Building 25 (Old Health Center) Renovation |
Project Description / Scope: A section of University Drive West near Building #25 will be reduced to one-lane with a contractor flag person controlling traffic flow while the section of the road surface is being repaired/modified. |
Estimated Start: 8/15/2017 7:00 AM |
Estimated End: 8/16/2017 4:00 PM |
More Details |
University Hall - Grounds Department Fuel Island |
Project Description / Scope: Fuel Island will be out of service between 11:00 a.m. and 2:00 p.m. on Friday, July 28, 2017 during inspection and testing of fire suppression system. |
Estimated Start: 7/28/2017 11:00 AM |
Estimated End: 7/28/2017 2:00 PM |
More Details |
University Hall |
Project Description / Scope: Testing of the fire alarm system smoke detectors and pull stations |
Estimated Start: 7/27/2017 7:45 AM |
Estimated End: 7/28/2017 3:00 PM |
More Details |
University Drive East and Center Drive East and State Drive Roadway Improvements – Milling and Paving |
Project Description / Scope: Milling and paving work is scheduled for select sections of campus roadways – refer to attached Map for specific locations. ROAD CLOSED and DETOUR signage will be posted each day as needed. |
Estimated Start: 7/25/2017 6:00 AM |
Estimated End: 7/28/2017 6:00 PM |
More Details |
ALUMNI QUAD - Maintenance Project |
Project Description / Scope: On Monday afternoon, the power will be temporarily shut down in preparation for tie-ins with new equipment. Additionally, there will be no water during this shutdown. |
Estimated Start: 7/31/2017 4:00 PM |
Estimated End: 7/31/2017 7:00 PM |
More Details |
Second Notice Science Library roadway and accessible parking area 7/25-7/26 |
Project Description / Scope: Milling and paving work is scheduled for the Science Library roadway and accessible parking area on the west side of the library. This area will be closed to all traffic. Please note that accessible parking is available on both the east and west sides of Campus Center. There will be no pedestrian access to the Science Library doors on the west side. |
Estimated Start: 7/25/2017 6:00 AM |
Estimated End: 7/26/2017 6:00 PM |
More Details |
Science Library roadway and accessible parking area 7/25-7/26 |
Project Description / Scope: Milling and paving work is scheduled for the Science Library roadway and accessible parking area on the west side of the library. This area will be closed to all traffic. Please note that accessible parking is available on both the east and west sides of Campus Center. Please see attached map |
Estimated Start: 7/25/2017 6:00 AM |
Estimated End: 7/26/2017 6:00 PM |
More Details |
Campus Wide Fire Hydrant Flushing |
Project Description / Scope: We will be conducting our annual fire hydrant inspections and flushing on all fire hydrants campus wide on the Uptown Campus and Alumni Quad. |
Estimated Start: 7/18/2017 12:00 AM |
Estimated End: 8/18/2017 12:00 AM |
More Details |
Humanities & Education - Dutch Commons Area Improvements |
Project Description / Scope: Paver and concrete repairs are to be completed at the ground floor entrances to Humanities and Education from Dutch Commons during the above dates. Access will only be permitted for exit in an emergency. Pedestrian traffic will be prohibited during these dates. All pedestrians are asked to use the most easterly entrance to Education or the Motorcycle room entrance during this period. Please see attached map |
Estimated Start: 7/19/2017 6:00 AM |
Estimated End: 8/7/2017 4:00 PM |
More Details |
Dutch Quad / Podium south/west area |
Project Description / Scope: The three entrances on Central Drive West to Podium will be closed for two weeks during construction. Please use alternative entrances to Podium. Please see the attached map |
Estimated Start: 7/19/2017 12:00 AM |
Estimated End: 8/7/2017 12:00 AM |
More Details |
Social Sciences (SS) Building – South Podium Entrance |
Project Description / Scope: The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH), Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces. The contractor will continue with the entry door replacement work at Social Sciences – South (Work Zone 3) beginning July 14. Work includes erecting a construction fence, installing temporary partition walls, concrete demo/removals, structural lintel installation, electrical work and installation of new entry doors. Some work will be noisy during these periods. The entrance noted above will be closed to pedestrian traffic. The east entrance at the podium level (Work Zone 2) will be open for use (with new doors). Plan to use other alternate entry points at the building including through the basement level. Additional notices will be released as necessary. |
Estimated Start: 7/14/2017 6:00 AM |
Estimated End: 8/18/2017 4:00 PM |
More Details |
Physical Education Building - Domestic Hot Water Outage |
Project Description / Scope: Because of a necessary HTHW repair in the PE Mechanical Equipment Room, Domestic Hot Water will not be available in the PE Building until 2 PM on Wednesday July 12th. |
Estimated Start: 7/11/2017 2:00 PM |
Estimated End: 7/12/2017 2:00 PM |
More Details |
Lot Cleaning, Crack Filling, Sealcoating, Re-Striping |
Project Description / Scope: WEATHER DEPENDENT – RAIN WILL INTERUPT THE PROCESS Sealing and striping at Empire Commons On Wednesday, 7/12/17 Begin with half of the roadway from the south lot in to the west lot. The west lot would be completed first and then move on to Half of the North lot. Liberty lane (the entrance in front of A and B) Empire staff will be blocking off areas accordingly. |
Estimated Start: 7/12/2017 7:00 AM |
Estimated End: 7/19/2017 4:00 PM |
More Details |
MSC Restacking - Construction |
Project Description / Scope: The overall project represents Phase 03 of the Campus Elevator Renovation Program and will address the renovation, replacement or repair of six (6) elevators/lift systems on campus. The elevators/lifts included in this project are as follows- Linear Accelerator (1970), Physical Education (1968), Draper Hall (1974), Waterbury Hall kitchen freight lift (1959), SEFCU Arena (1992) Lift in Fine Arts (1967); conversion of service keys in 18 elevators to campus standard keys and the installation of fire department Knox Boxes in four buildings. The building power to SEFCU Arena will be temporarily shut down on Thursday early morning, July 06 from 12:00am (Midnight) to 7:00am in order for the contractor to complete electrical work related to the new elevator installation in the building. Please turn off any computers, printers and any other sensitive electronic equipment that may be susceptible to damage when the building re-energizes. Additional notices will be released as necessary. |
Estimated Start: 7/6/2017 12:00 AM |
Estimated End: 7/6/2017 7:00 AM |
More Details |
MSC Restacking - Construction |
Project Description / Scope: Cutting through conference room 102 to accommodate new door to lobby. Move existing wall between huddle rooms and UHS suite 312. |
Estimated Start: 6/26/2017 12:00 AM |
Estimated End: 7/3/2017 12:00 PM |
More Details |
Elevator Renovations – Phase 03 |
Project Description / Scope:
The overall project represents Phase 03 of the Campus Elevator Renovation Program and will address the renovation, replacement or repair of six (6) elevators/lift systems on campus. The elevators/lifts included in this project are as follows- Linear Accelerator (1970), Physical Education (1968), Draper Hall (1974), Waterbury Hall kitchen freight lift (1959), SEFCU Arena (1992), Lift in Fine Arts (1967); conversion of service keys in 18 elevators to campus standard keys and the installation of fire department Knox Boxes in four buildings.
During this period, the elevator in SEFCU Arena will be out of service in order to complete the elevator renovations. Additional notices will be released as necessary. |
Estimated Start: 6/27/2017 7:00 AM |
Estimated End: 8/18/2017 5:00 PM |
More Details |
Stacks Relocation Project |
Project Description / Scope: An off-site contractor will be relocating existing second floor books and their shelving to the lower level of the Science Library. The second floor and lower level of the Science Library will be offline until the work is completed. |
Estimated Start: 6/26/2017 8:00 AM |
Estimated End: 9/5/2016 4:00 PM |
More Details |
Athletics - Track & Field Office |
Project Description / Scope: Within the next two weeks the contractor will begin mobilization and site work for the installation of the new Track & Field Office. The contractor will be on the east and west ends of the track. |
Estimated Start: 6/28/2017 6:00 AM |
Estimated End: 9/30/2017 4:00 PM |
More Details |
Building 25 (Old Health Center) Renovation |
Project Description / Scope: A section of University Drive West near Building #25 will be reduced to one-lane with a contractor flag person controlling traffic flow while the section of the road is being repaired. |
Estimated Start: 6/15/2017 6:00 AM |
Estimated End: 6/16/2017 4:00 PM |
More Details |
Waterbury Hall – Power Shutdown Elevator Renovations – Phase 03 |
Project Description / Scope: The overall project represents Phase 03 of the Campus Elevator Renovation Program and will address the renovation, replacement or repair of six (6) elevators/lift systems on campus. The elevators/lifts included in this project are as follows- Linear Accelerator (1970), Physical Education (1968), Draper Hall (1974),Waterbury Hall kitchen freight lift(1959), SEFCU Arena (1992), Lift in Fine Arts (1967); conversion of service keys in 18 elevators to campus standard keys and the installation of fire department Knox Boxes in four buildings. During this period, the building power to Waterbury Hall will be temporarily shut down on Friday, June 16th in order for the contractor to complete work related to the new kitchen freight lift to be installed in the building. Please turn off any computers, printers and any other sensitive electronic equipment that may be susceptible to damage when the building re-energized. Additional notices will be released as necessary. |
Estimated Start: 6/16/2017 7:00 AM |
Estimated End: 6/16/2017 12:00 PM |
More Details |
Dutch Gold Parking Lot – southern half |
Project Description / Scope: No Parking in Dutch Gold parking lot from Alumni Drive intersection to the south end of the lot. CDTA will be utilizing the lot for their annual Road-E-O obstacle course driving competition. Barricades and signage will be placed. |
Estimated Start: 6/6/2017 7:00 PM |
Estimated End: 6/8/2017 5:00 PM |
More Details |
Replace Exterior Doors at Podium – Phase 01 |
Project Description / Scope:
The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address
the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH), Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC).
Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces.
The contractor will continue with work at following building entrances beginning the week of June 05:
|
Estimated Start: 6/5/2017 6:00 AM |
Estimated End: 6/9/2017 4:00 PM |
More Details |
Academic Podium - Campus Center and Main Fountain |
Project Description / Scope: Due to emergency repair of the fountain surfaces both the Campus Center and Main Fountain will need to be drained on Monday May 29th they will be re-filled and back in service on Monday June 5th. |
Estimated Start: 5/29/2017 10:00 AM |
Estimated End: 6/05/2017 10:00 AM |
More Details |
COLONIAL QUAD - Livingston Tower Sealer Project |
Project Description / Scope: On Tuesday morning, contractor activities will begin around Livingston Tower. There will be scaffolding activities on all four sides through the course of the summer. |
Estimated Start: 5/30/2017 7:00 AM |
Estimated End: 8/30/2017 4:00 PM |
More Details |
University Drive Partial Closure by Life Science Building |
Project Description / Scope:
This work involves installing new underground utility duct banks from existing manholes located in the southeastern lawn area of the Life Sciences Research Building (LSRB) to utility manholes located in the lawn area east of University Drive (in front of LSRB). During the work to install duct banks that cross University Drive (in front of LSRB) traffic will be reduced to one-lane with contractor flag persons controlling traffic flow. After construction activities for the work day have ended two-way traffic will be restored. Duct bank road crossing work is scheduled to start on Monday May 22nd and be completed on Wednesday May 31st. Certain construction activities, such as moving large tracked equipment, demolition of roadway paving and use of vibratory soil compaction equipment, will generate some ground vibrations. Work to start next Monday, after 2017 Spring Commencement. Attached Uptown Campus Map indicates specific work location. |
Estimated Start: 5/22/2017 7:00 AM |
Estimated End: 6/16/2017 4:00 PM |
More Details |
Dutch Commons Area Improvements |
Project Description / Scope: The Dutch Commons and Podium southwest areas will be partly closed during construction. Please see the attached map. The map shows No Parking area location. The project includes removals of existing mineral mulch, concrete pavers and installation of new pavers, concrete, irrigation, re-grading, and landscaping. This project will improve pedestrian safety flow and upgrade the landscaped areas. |
Estimated Start: 5/22/2017 7:00 AM |
Estimated End: 8/21/2017 7:00 AM |
More Details |
Alumni Quad Stormwater Mitigation |
Project Description / Scope: The Alumni Quad courtyard area will be partly closed during construction. Please see the attached map. The project includes removals of existing storm and sanitary infrastructure; installation of new storm and sanitary infrastructure, including sanitary and storm water pump stations; parking lot paving, and site restoration. |
Estimated Start: 5/22/2017 7:00 AM |
Estimated End: 5/07/2018 12:00 AM |
More Details |
Dutch Commons Area Improvements |
Project Description / Scope: The Dutch Commons and Podium southwest areas will be partly closed during construction. Please see the attached map. The project includes removals of existing mineral mulch, concrete pavers and installation of new pavers, concrete, irrigation, re-grading, and landscaping. This project will improve pedestrian safety flow and upgrade the landscaped areas. |
Estimated Start: 5/22/2017 7:00 AM |
Estimated End: 8/21/2017 7:00 AM |
More Details |
DUTCH A & B ROOF REPLACEMENT |
Project Description / Scope: Contractor will maintain a staging area on the west side of Dutch Quad, north of the loading dock for the duration of the project |
Estimated Start: 5/22/2017 7:00 AM |
Estimated End: 8/15/2017 10:00 AM |
More Details |
Life Sciences Building Southeast Lawn Area & Adjacent University Drive Install Electrical & Signal Duct Banks |
Project Description / Scope: NOTICE #2: This work involves installing new underground utility duct banks from existing manholes located in the southeastern lawn area of the Life Sciences Research Building (LSRB) to utility manholes located in the lawn area east of University Drive (in front of LSRB). During the work to install duct banks that cross University Drive traffic will be reduced to one-lane with contractor flag persons controlling traffic flow. After construction activities for the work day have ended two-way traffic will be restored. Duct bank road crossing work is scheduled to start on Monday May 22nd and be completed on Wednesday May 31st. Certain construction activities, such as moving large tracked equipment, demolition of roadway paving and use of vibratory soil compaction equipment, will generate some ground vibrations. Work to start the Monday after 2017 Spring Commencement. Attached Uptown Campus map indicates specific work location. |
Estimated Start: 5/22/2017 7:00 AM |
Estimated End: 6/16/2017 4:00 PM |
More Details |
University Library – Basement Level Asbestos Abatement |
Project Description / Scope: Stairwell 11ST1 will be closed for asbestos abatement in the basement corridor. The stairwell be sealed at the first floor. Occupants should utilize stair 10ST1 for emergency egress. See the attached drawings. |
Estimated Start: 5/10/2017 6:00 AM |
Estimated End: 5/24/2017 5:00 PM |
More Details |
Annual Power Plant Shutdown 2017 |
Project Description / Scope: The University's community should expect minimal heating and air conditioning service during the above mentioned period in the uptown campus buildings excluding areas serviced by local systems. Domestic hot water will not be available during this time except areas serviced by local systems, i.e… SEFCU arena, Boor Sculpture Studio, Liberty, Freedom and select residence halls rooms. |
Estimated Start: 5/21/2017 4:00 PM |
Estimated End: 6/5/2017 8:00 AM |
More Details |
Humanities, Physics & Chemistry Buildings – Podium Entrances |
Project Description / Scope:
The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address
the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education(ED),
Physics(PH), Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap
accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces.
The contractor will begin to shut down the following building entrances beginning the week of May 08:
|
Estimated Start: 5/8/2017 5:00 AM |
Estimated End: 5/29/2017 4:00 PM |
More Details |
Humanities Bldg - Elevator Repairs |
Project Description / Scope: Making repairs to Elevator Hydraulic System |
Estimated Start: 5/1/2017 7:00 AM |
Estimated End: 5/1/2017 12:00 PM |
More Details |
Campus Center East - Grease trap cleaning |
Project Description / Scope: Pumping of multiple grease traps in the Campus Podium Dining Areas |
Estimated Start: 5/23/2017 7:00 AM |
Estimated End: 3/13/2017 2:00pm |
More Details |
Social Science - Elevator Repair Install Electrical & Signal Duct Banks |
Project Description / Scope: Replace packing on Hydraulic cylinder. |
Estimated Start: 4/21/2017 6:00 AM |
Estimated End: 4/21/2017 12:00 PM |
More Details |
Life Sciences Building & University Drive - Install Electrical & Signal Duct Banks |
Project Description / Scope: This work involves installing new underground utility duct banks from existing manholes located in the southeastern lawn area of the Life Sciences Research Building (LSRB) to utility manholes located in the lawn area east of University Drive (in front of LSRB). During the work to install duct banks that cross University Drive traffic will be reduced to one-lane with contractor flag persons controlling traffic flow. After construction activities for the work day have ended two-way traffic will be restored. Certain construction activities, such as moving large tracked equipment, demolition of roadway paving and use of vibratory soil compaction equipment, will generate some ground vibrations. Work to start on the Monday after 2017 Spring Commencement. Attached Uptown Campus Map indicates specific work location |
Estimated Start: 5/22/2017 8:00 AM |
Estimated End: 6/16/2017 5:00 PM |
More Details |
SEFCU Arena – Elevator Shutdown Elevator Renovations – Phase 03 |
Project Description / Scope: The overall project represents Phase 03 of the Campus Elevator Renovation Program and will address the renovation, replacement or repair of six (6) elevators/lift systems on campus. The elevators/lifts included in this project are as follows- Linear Accelerator (1970), Physical Education (1968), Draper Hall (1974), Waterbury Hall kitchen freight lift (1959), SEFCU Arena(1992), Lift in Fine Arts (1967); conversion of service keys in 18 elevators to campus standard keys and the installation of fire department Knox Boxes in four buildings. During this period, the elevator in SEFCU Arena will be temporarily out-of-service in order for the contractor to complete some minor work in the elevator pit as part of the overall elevator renovation work in the building. Additional notices will be released as necessary. |
Estimated Start: 4/12/2017 7:00 AM |
Estimated End: 4/12/2017 11:00 AM |
More Details |
HUMANITIES BUILDING- Elevator |
Project Description / Scope: Replace packing. |
Estimated Start: 4/12/2017 7:00 AM |
Estimated End: 4/12/2017 12:00 PM |
More Details |
Social Sciences (SS) Building – Podium Entrances Update! |
Project Description / Scope: The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH) Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces. To minimize the disruption to building occupants, the contractor has agreed to start demo work at 5am starting tomorrow (04/11) for work needed at the east entrance. This earlier start should reduce the time needed for the extent of the demo at this location. Additional notices will be released as necessary. |
Estimated Start: 3/16/2017 8:00 AM |
Estimated End: 4/30/2017 5:00 PM |
More Details |
University Library Renovate Library Basement - WCI |
Project Description / Scope: The electrical contractor will be completing a power switchover on Thursday March 30 starting at 6:00 AM. This will effect persons located on the north of the Library Basement only. Power loss is expected to be intermittent and the outage will complete by 8:00 AM. Please turn off all electronic devices by the end of business Wednesday March 29th. |
Estimated Start: 3/30/2017 6:00 AM |
Estimated End: 3/30/2017 8:00 AM |
More Details |
Lecture Center Concourse - Fountain Cleaning |
Project Description / Scope: Removal of ice in fountain and pressure washing fountain for resurfacing. |
Estimated Start: 3/22/2017 7:00 AM |
Estimated End: 3/26/2016 4:00 PMM |
More Details |
Social Sciences (SS) Building – Podium Entrances |
Project Description / Scope: The overall project represents the first phase of the Uptown Campus Exterior Door Replacement project and will address the replacement of the main building entry doors at seven locations – Social Sciences (SS), Humanities (HU), Education (ED), Physics (PH) Chemistry (CH), Biology (BI) and the Performing Arts Center (PAC). Work includes new handicap accessible doors and hardware, power openers and other cosmetic enhancements to the lobby vestibule spaces. During this work period, one entrance to Social Sciences will be closed while the door assemblies are replaced in each of the three main entrances off the Podium level. Additional notices will be released as necessary. |
Estimated Start: 3/16/2017 8:00 AM |
Estimated End: 4/30/2017 5:00 PM |
More Details |
Old Computing Center - Asbestos Abatement |
Project Description / Scope: Asbestos abatement of floor tile, pipe insulation, and HVAC duct caulk in CS-04, CS-05, CS-07, and CS-08. All work will be contained within those spaces. |
Estimated Start: 3/13/2017 12:00 AM |
Estimated End: 5/1/2017 12:00 AM |
More Details |
Elevator Renovations – Phase 03 |
Project Description / Scope: The overall project represents Phase 03 of the Campus Elevator Renovation Program and will address the renovation, replacement or repair of six (6) elevators/lift systems on campus. The elevators/lifts included in this project are as follows- Linear Accelerator (1970), Physical Education (1968), Draper Hall (1974), Waterbury Hall kitchen freight lift (1959), SEFCU Arena (1992) , Lift in Fine Arts (1967); conversion of service keys in 18 elevators to campus standard keys and the installation of fire department Knox Boxes in four buildings. During this period, elevators in Fine Arts will be shut down for a three-hour period to complete electrical work as part of the ongoing elevator renovation work in the building. Additional notices will be released as necessary |
Estimated Start: 3/10/2017 5:00 AM |
Estimated End: 3/10/2017 8:00 AM |
More Details |
Podium deck removal and replacement |
Project Description / Scope: Remove concrete deck, remove and replace roof, form and pour concrete to replace deck in the lower level area |
Estimated Start: 3/8/2017 12:00 AM |
Estimated End: 5/12/2017 12:00 AM |
More Details |
Herkimer & Hamilton Hall |
Project Description / Scope: Power will be turned off at 7am for Herkimer and Hamilton Halls. During shut down, there will be no internet service for the entire quad. Power & Internet will be restored by 10am for Hamilton Hall, along with internet service. Power will be out in Herkimer Hall until mid-afternoon. All phones will be maintained throughout. |
Estimated Start: 3/11/2017 7:00 AM |
Estimated End: 3/11/2017 10:00 AM |
More Details |
Science Library - Alarm Testing |
Project Description / Scope: Test the Building Fire Alarm Evacuation system |
Estimated Start: 3/4/2017 6:00 AM |
Estimated End: 3/4/2017 10:00 AM |
More Details |
Campus Center East - Grease Trap Cleaning |
Project Description / Scope: Pumping of multiple grease traps in the Campus Podium Dining Areas |
Estimated Start: 3/13/2017 7:00 AM |
Estimated End: 3/13/2017 2:00 PM |
More Details |
Fine Arts Building (FA) – Power Shutdown! |
Project Description / Scope: The overall project represents Phase 03 of the Campus Elevator Renovation Program and will address the renovation, replacement or repair of six (6) elevators/lift systems on campus. The elevators/lifts included in this project are as followsLinear Accelerator (1970), Physical Education (1968), Draper Hall (1974), Waterbury Hall kitchen freight lift (1959), SEFCU Arena (1992), Lift in Fine Arts (1967); conversion of service keys in 18 elevators to campus standard keys and the installation of fire department Knox Boxes in four buildings. During this period, electrical power to the Fine Arts Building will be shut down on Friday (02/24) morning beginning at 2:00am in order to switch over and connect a new main electrical line, relocated as part of the ongoing elevator work in the building. Additional notices will be released as necessary. |
Estimated Start: 2/24/2017 2:00 AM |
Estimated End: 2/24/2017 8:00 AM |
More Details |
Fire Suppression System Maintenance |
Project Description / Scope: Fuel station will be out-of-service for the above date/times due to scheduled maintenance and re-certification of the fuel island fire suppression system. |
Estimated Start: 2/15/2017 12:00 PM |
Estimated End: 2/15/2017 4:00 PM |
More Details |
SERVICE BUILDING AREA - Construction Trailer Delivery Access and Parking Change |
Project Description / Scope: On Wednesday the University will be receiving construction trailers for installation in the SBA courtyard. The trailers may be staged in the current bus parking spaces. Please avoid parking or driving in that area |
Estimated Start: 2/1/2017 7:00 AM |
Estimated End: 2/1/2017 11:59 PM |
More Details |
Tunnel area between Fine Arts and Arts & Sciences - Stairwell / Machine Room / Tunnel repairs |
Project Description / Scope: Remove damaged concrete from the landing in the stairwell, machine room and tunnel ceilings and pour new concrete to repair those areas. |
Estimated Start: 1/26/2017 12:00 AM |
Estimated End: 2/20/2017 12:00 AM |
More Details |
Podium West Faculty/Staff Parking Lot Site Survey |
Project Description / Scope: A site survey will be performed to the Podium West Faculty/Staff parking lot for work associated with the Renovation of the Business Administration Building (Building 27). The attached map indicates the extent of the survey. For more information about the Building 27 (BA) Renovation project visit the UA featured project website at; https://www.albany.edu/facilities/fp/building_27.html |
Estimated Start: 1/18/2017 9:00 AM |
Estimated End: 1/19/2017 5:00 PM |
More Details |
Chemistry Hot Water Shutoff |
Project Description / Scope: Shutting down domestic hot water to install a shut off valve. |
Estimated Start: 1/18/2017 7:00 AM |
Estimated End: 1/18/2017 2:00 PM |
More Details |
Library Stair entrance to LC overhang repairs |
Project Description / Scope: Damaged concrete and rods will be repaired, replaced and painted as needed. |
Estimated Start: 1/10/2017 12:00 AM |
Estimated End: 1/31/2017 12:00 AM |
More Details |
Lecture Center ADA Toilet Room Rehabilitation |
Project Description / Scope: Site investigation of each of the restrooms in the Lecture Center. One restroom will be taken off line at a time and will remain closed for 45 to 60 minutes each |
Estimated Start: 1/12/2017 8:00 AM |
Estimated End: 1/12/2017 5:00 PM |
More Details |
PAC Hosting Governor's State of the State Address |
Project Description / Scope: The Governor’s security team has mandated the closure of part of the podium tunnel between 11am and 4pm on Wednesday, January 11, 2017. The section outlined on the attached map will be closed to all traffic (no deliveries, vehicles or pedestrian traffic will be allowed). UPD officers will be posted at the access points. Impacted areas are in the southeast corner entrance of the podium tunnel by Life Sciences up to the entrance for the Performing Arts Center. Please refrain from attempting to enter the tunnels near the red area during these hours. Thank you for your cooperation. |
Estimated Start: 1/11/2017 11:00 AM |
Estimated End: 1/11/2017 4:00 PM |
More Details |
Physical Education Elevator Renovations - Phase 03 |
Project Description / Scope: The overall project represents Phase 03 of the Campus Elevator Renovation Program and will address the renovation, replacement or repair of six (6) elevators/lift systems on campus. The elevators/lifts included in this project are as follows- Linear Accelerator (1970), Physical Education (1968), Draper Hall (1974), Waterbury Hall kitchen freight lift (1959), SEFCU Arena (1992), Lift in Fine Arts (1967); conversion of service keys in 18 elevators to campus standard keys and the installation of fire department Knox Boxes in four buildings. During this period, the PE elevator will be out of service while construction activities in the elevator pit takes place, along with related work necessary in preparation for the new elevator cab assembly. Additional notices will be released as necessary. |
Estimated Start: 1/11/2017 7:00 AM |
Estimated End: 3/15/2017 5:00 PM |
More Details |
Colonial - Herkimer Renovation Project |
Project Description / Scope: On Monday, January 9th the power to both Hamilton and Herkimer halls will be shut down at 6 AM. The new service tie-in to the main feeders in the tunnel will be made and should take approxmanetly ½ hour to complete. |
Estimated Start: 1/9/2017 6:00 AM |
Estimated End: 1/9/2017 7:00 AM |
More Details |
University Library Basement AHU Shutdown |
Project Description / Scope: The Air Handling Unit that serves the northwest quadrant of the University Library Basement will be shut down on Tuesday 12/27 from 7:00 AM to 3:00 PM. Heating will not be provided in this area for this time period. Reference the attached map to view the affected area. |
Estimated Start: 12/27/2016 7:00 AM |
Estimated End: 12/27/2016 3:00 PM |
More Details |
Computer Science Area - Library Basement |
Project Description / Scope: An abatement is scheduled to remove the VCT tile from classroom floors in the Computer Science area of the Library Basement. Impacted rooms include B-067 A, B, C, D, E, F & G, 83, 83A, 83B, 98 & 99. The tunnel entrance to these rooms will be closed and access to the adjacent rooms will be available through the main EOP entrance or the Library Sunken Garden entrance. |
Estimated Start: 12/28/2016 7:00 AM |
Estimated End: 1/10/2017 4:00 PM |
More Details |
Dutch Commons - Area Improvements |
Project Description / Scope: Geotechnical Test Boring is to occur in the Dutch Commons area in preparation for site improvements in the region. (see attached map) This work will involve drilling into concrete and will cause noise, dust and some minor pedestrian disruptions. |
Estimated Start: 12/21/2016 8:00 AM |
Estimated End: 12/23/2016 4:00 AM |
More Details |
Performing Arts Center - Overhang repairs |
Project Description / Scope: Damaged concrete will be removed and replaced. Scaffolding wrapped in plastic will be installed to isolate the work area. |
Estimated Start: 12/16/2016 8:00 AM |
Estimated End: 1/2/2017 4:00 PM |
More Details |
MSC Restacking |
Project Description / Scope: Greco Construction and City of Albany will be shutting down the water to MSC to allow plumbers to tie in a new sprinkler system into the building’s water main. |
Estimated Start: 12/17/2016 8:00 AM |
Estimated End: 12/17/2016 5:00pm |
More Details |
Biology Basement Floor Tile Abatement |
Project Description / Scope: A Floor tile abatement will take place in the basement level corridor of Biology during the time frame above. No access will be permitted to the basement level corridor during this time period unless it is deemed an emergency by Facilities Management. |
Estimated Start: 12/21/2016 7:00 AM |
Estimated End: 1/5/2016 4:00pm |
More Details |
Campus Center East, Patroon Room, Argo Tea, Zime |
Project Description / Scope: Pumping of multiple grease traps in the Campus Podium Dining Areas |
Estimated Start: 1/5/2017 7:00 AM |
Estimated End: 1/5/2017 4:00pm |
More Details |
MSC Restacking |
Project Description / Scope: Greco Construction will be starting work on the second and third floor of MSC. They will be cutting in new doors and openings, installing carpet and working on ceilings. All noisy work will be done early in the day. |
Estimated Start: 11/21/2016 7:00 AM |
Estimated End: 12/30/2016 5:00 PM |
More Details |
East Podium Stormwater Upgrades Project |
Project Description / Scope: Surveyors are to start utility locating from the Podium by Fine Arts, to the north of State Quad. The work to be completed is the first phase of design work for storm water upgrades due to East Podium flooding. The surveying work will occur off and on for the next two weeks. There will be no disruption to pedestrians or traffic. |
Estimated Start: 11/10/2016 8:00 AM |
Estimated End: 11/23/2016 4:00 PM |
More Details |
Campus Wide Accessibility Study |
Project Description / Scope: Hyman Hayes Associates will be on site at the Podium to verify existing conditions for the ADA study, including corridor doors at the Podium academic buildings, and changes in elevation and other existing features at the Lecture Center Basement and Sub Basement Levels, and some Tunnel locations. |
Estimated Start: 11/10/2016 8:00 AM |
Estimated End: 11/10/2016 12:00 PM |
More Details |
University Drive- Tree Removal |
Project Description / Scope: Work involves removing trees along the pathway of new underground electrical and signal duct banks running from the Uptown Campus to the Harriman Campus through the wooded area east of University Drive and west of the Boor Sculpture Studio. |
Estimated Start: 11/8/2016 - 8:00 AM |
Estimated End: 11/11/2016 - 5:00 PM |
More Details |
Colonial - Herkimer Renovation Project |
Project Description / Scope: Beginning on Monday 11/7 roof removals will begin, completing on 11/9. On Thursday 11/10 at approx. 7am, new roofing materials will delivered and craned onto the roof. Expect tractor trailers and a crane on site to noon. Access through the area will be limited for the Thursday morning work. |
Estimated Start: 11/7/2016 - 6:00 AM |
Estimated End: 11/10/2016 - 12:00 PM |
More Details |
ADA Toilet Room Rehabilitation |
Project Description / Scope:
Bathrooms will be closed for approximately 10 minutes for the visual verification of existing toilet room facilities.
Buildings impacted include:
|
Estimated Start: 10/31/2016 9:00 AM |
Estimated End: 10/31/2016 3:00 PM |
More Details |
Elevator Renovations - Phase 3 |
Linear Accelerator |
Project Description / Scope: This project represents the third phase of the Campus Elevator Renovation Program and addresses the renovation, replacement or repair of six (6) elevators/lift systems on campus. The elevators/lifts included in this project are as follows: Linear Accelerator, Physical Education, Draper Hall, Waterbury Hall kitchen freight lift, SEFCU Arena and the lift in Fine Arts. The scope includes conversions of service keys in 18 elevators to campus standard keys and the installation of fire department Knox boxes in four buildings. During this timeframe, the contractor will be abating asbestos containing materials (ACMs) in and around the mechanical and electrical room spaces of the linear accelerator facility. Additional work notices will be released as necessary. |
Estimated Start: 10/24/2016 7:00 AM |
Estimated End: 11/11/2016 5:00 PM |
More Details |
Campus Wide |
ADA Toilet Room Rehabilitation |
Project Description / Scope:
Bathrooms will be closed for approximately 10 minutes for the visual verification of existing toilet room facilities in the following buildings:
|
Estimated Start: 10/25/2016 9:00 AM |
Estimated End: 10/25/2016 3:00 PM |
More Details |
Management Service Center- MCS Restacking |
Project Description / Scope: Construction is scheduled to begin on the 1st floor, as well as in Room # 214. Construction will be staggered in phases. A dumpster will be installed on the west (back) side of MSC, which will result in the loss of 3 parking spaces. Construction will include demolition, electrical, mechanical, plumbing and ITS work. |
Estimated Start: 10/3/2016 - 7:00 AM |
Estimated End: 12/30/2016 - 5:00 PM |
More Details |
Rehabilitation of Restrooms for ADA Accessibility |
Project Description / Scope: Upgrade all public restrooms on the Uptown & Downtown campus and provide code compliant accessibility. At least one Universal restroom conversion per building will be included in the project scope. |
Estimated Start: 9/21/2016 - 8:00 AM |
Estimated End: 9/21/2016 - 6:00 PM |
More Details |
Indian Quad- Bike Room Stairway Repair |
Project Description / Scope: For repairs necessary to treads in the stairway leading from outside Onondaga and Seneca Halls to the Bike Room at ground level. The stairway will be closed during this time and will re-open Friday 9/16. |
Estimated Start: 9/12/2016 - 6:00 AM |
Estimated End: 9/16/2016 - 9:00 AM |
More Details |
Colonial Quad - Water Interruption |
Project Description / Scope: A contractor has unexpectantly hit a water main north of the Business Administration building that is effecting the water service to several buildings. Some buildings may experience low water pressure today. Currently Colonial quad is without water service. The repairs to the water service are underway but are not expected to be completed until the end of the day today. |
Estimated Start: 8/22/2016 - 8:00am |
Estimated End: 8/22/2016 - 4:00pm |
More Details |
Tricentennial Drive - Tree removal |
Project Description / Scope: A contractor will be removing a dead oak tree on Tricentennial Drive east of Fuller Road. Traffic will be reduced to one lane. Traffic control signage and flaggers will be in place. |
Estimated Start: 8/17/2016 - 1:00pm |
Estimated End: 8/17/2016 - 5:00pm |
More Details |
Building 25 Renovation - Road Paving |
Project Description / Scope:
A section of University Drive West will be closed on Tuesday August 16th between 5:00am and 5:00pm in order to complete paving work on University Drive. Traffic will be detoured around the closed road section. Flagmen will be present in the work zone to direct traffic. Slight traffic delays may be experienced. Please refer to the attached map for the location of the work. |
Estimated Start: 8/16/2016 - 5:00am |
Estimated End: 8/16/2016 - 5:00pm |
More Details |
University Hall - Sound Level Testing Fire Alarm System |
Project Description / Scope: The Office of Fire Safety will be conducting a visual and sound level test of the Fire Alarm System. |
Estimated Start: 8/15/2016 - 5:00 AM |
Estimated End: 8/15/2016 - 7:00 AM |
More Details |
Carillion Drive East / University Hall Parking - Storm Drain Investigation |
Project Description / Scope: Facilities Management will be investigating the storm drain piping under the roadway between the Fine Arts Building and University Hall. This work requires blocking of three reserved parking spaces at the west end of the north side of Carillon Drive East on Tuesday, August 9th. These parking spaces will have temporary signage installed, as well as cones put in place, to prevent the spaces from being used. As soon as work has been completed, the spaces will be once again open to those authorized to use them. |
Estimated Start: 8/9/2016 - 7:00 AM |
Estimated End: 8/9/2016 - 4:00 PM |
More Details |
Building 25 (Old Health Center) Road Paving |
Project Description / Scope: Paving work is scheduled for a section of University Drive West in front of Building #25, between Tri-Cenntennial Drive and Dock Drive. At times, one lane of University Drive West will be closed to perform the work. Flagmen will be present in the work zone to direct traffic. Slight traffic delays may be experienced. |
Estimated Start: 8/9/2016 - 5:00 AM |
Estimated End: 8/9/2016 - 4:00 PM |
More Details |
University Drive West - Milling and Paving |
Project Description / Scope: Milling and paving work is scheduled for the section of University Drive in front of the Interfaith Center, between Great Dane Drive and the SEFCU bus stop entrance. This section of University Drive will be closed to traffic. Vehicles must follow the posted detour route. There will be pedestrian only access to the Interfaith Center. |
Estimated Start: 8/8/2016 - 6:00 AM |
Estimated End: 8/8/2016 - 6:00 PM |
More Details |
Colonial Quad - Concrete Repairs |
Project Description / Scope: This project encompasses the repairs needed to restore the stairs to the Colonial Quad’s sunken garden to a usable status. The access to these stairs will be closed throughout the duration of the project and there will be noise, along with debris generated during the demolition, as well as the construction phases. |
Estimated Start: 8/3/2016 - 6:00 AM |
Estimated End: 2/28/2017 - 4:00 PM |
More Details |
University Drive - South side Tree Restoration |
Project Description / Scope: Tree restoration project phase 2 – removal of dead trees along University Drive from SEFCU arena parking lot entrance eastward to Liberty Terrace. Road traffic will be reduced to one lane with flaggers and signage. The Purple Path will be CLOSED in this work area. |
Estimated Start: 8/4/2016 - 7:00 AM |
Estimated End: 8/5/2016 - 4:00 PM |
More Details |
Colonial Quad - Concrete Repairs |
Project Description / Scope:
This project encompasses the repairs needed to restore the stairs to the Colonial Quad sunken garden to usable status. The access to these stairs will be closed throughout the duration of the project and there will be noise and debris generated during the demolition as well as the construction phases |
Estimated Start: 7/29/2016 - 6:00am |
Estimated End: 2/28/2017 - 4:00pm |
More Details |
Campus Center East Dining - Grease Trap Cleaning |
Project Description / Scope:
Pumping of Sub-basement grease trap in the Campus Center (east) Dining Area |
Estimated Start: 8/3/2016 - 7:00am |
Estimated End: 8/3/2016 - 4:00pm |
More Details |
Dutch Tunnel - Power Shutdown |
Project Description / Scope:
Power will be off for the day. |
Estimated Start: 7/25/2016 - 7:00am |
Estimated End: 7/25/2016 - 8:00am |
More Details |
Building 25 - Temporary Road Closure |
Project Description / Scope:
A section of University Drive West will be closed on Thursday July 21st between 7:00am and 5:00pm in order to complete Sewer line installation work. Traffic will be detoured around the closed road section. Flagmen will be present in the work zone to direct traffic. Slight traffic delays may be experienced. Please refer to the attached map for the location of the work. |
Estimated Start: 7/21/2016 - 7:00am |
Estimated End: 7/21/2016 - 5:00pm |
More Details |
Campus Center East Dining - Grease Trap Cleaning |
Project Description / Scope:
Pumping of Sub-basement grease trap in the Campus Center (east) Dining Area |
Estimated Start: 8/2/2016 - 7:00am |
Estimated End: 8/2/2016 - 4:00pm |
More Details |
Freedom Quad - Stormwater modifications CNSE |
Project Description / Scope:
Maintenance on Stormwater Management Pond located south of Freedom Quad buildings, consisting of sediment removal and restoration. |
Estimated Start: 7/25/2016 - 7:00am |
Estimated End: 8/12/2016 - 5:00pm |
More Details |
Building 25 (Old Health Center) Renovation |
Project Description / Scope:
Sewer line installation work under University Drive will begin next week. At times, one lane of University Drive will be closed to perform the work. Flagmen will be present in the work zone to direct traffic. Slight traffic delays may be experienced. Please refer to the attached map for the location of the work. |
Estimated Start: 7/14/2016 - 7:00am |
Estimated End: 7/22/2016 - 4:00pm |
More Details |
Campus Center Expansion – Access between SUNYCard and UAS offices |
Project Description / Scope:
Access at the Campus Center Ground Level between the SUNYCard offices and the UAS offices will be interrupted starting July 5, 2016 and continue until July 12, 2016. Please see the attached sketch which identifies the location of the interruption and provides alternate pedestrian route options. For more information about the Campus Center Expansion project visit the UAlbany featured project website at: https://www.albany.edu/facilities/fp/campus_center.html |
Estimated Start: 7/5/2016 - 7:00am |
Estimated End: 7/12/2016 - 7:00am |
More Details |
Parking Lots – SEFCU - Milling & Paving |
Project Description / Scope:
Milling and paving work is scheduled for the SEFCU main parking lot, Colonial Faculty/Staff (labeled Purple) parking lot, and Colonial Student B parking lot. These lots will be closed July 5 through July 8. Signage is posted and ample parking will be available in other lots on campus as your parking permit warrants. Please note faculty/staff with valid parking permits may park in all Student parking lots. |
Estimated Start: 7/5/2016 - 6:00am |
Estimated End: 7/8/2016 - 8:00pm |
More Details |
Campus Center East Dining - Grease trap cleaning |
Project Description / Scope:
Pumping of Sub Basement grease trap in the Health Sciences Campus Dining Area. |
Estimated Start: 6/30/2016 - 7:00am |
Estimated End: 6/30/2016 - 4:00pm |
More Details |
Colonial Quad - Power Interruption |
Project Description / Scope:
In preparation of the Herkimer Hall renovation there will be no power to Clinton, Delancey, Hamilton and Herkimer Halls on Monday, 6/27 beginning at 6:30am. Power will only be disrupted for approximately 15min at Clinton and Delancey Halls. Hamilton and Herkimer halls will be without power until approximately 7:30am. During the shutdown of Hamilton and Herkimer Halls, there will be no internet or phone service on the quad. |
Estimated Start: 6/27/2016 - 6:30am |
Estimated End: 8/1/2017 - 7:30pm |
More Details |
Campus Wide Accessibility Study |
Project Description / Scope:
Survey of accessibility on the Uptown and Downtown Campuses Hymen-Hayes, the Consultants for the project, will be conducting an ADA Accessibility survey on the Podium. They have provided a tentative schedule as follow: 1. 06/27 & 07/01: Social Sciences and Humanities Buildings 2. 07/05 & 07/07: Education and Physics Buildings 3. 07/11 & 07/15: Chemistry and Biology Buildings 4. 07/19 & 07/21: Earth Science and Fine Arts Buildings 5. 07/25 & 07/29: Lecture Center 6. 08/02 & 08/03: Lecture Center 7. 08/08 & 08/12: Campus Center 8. 08/16 & 08/18: Library 9. 08/22 & 08/26: Performing Arts Center |
Estimated Start: 6/27/2016 - 12:00am |
Estimated End: 8/26/2016 - 12:00am |
More Details |
SEFCU - ADA Repairs & Modifications |
Project Description / Scope:
Work includes structural steel modifications, new structural steel platforms and decking, ornamental guardrails, fixed stadium seating, relocation of existing electrical and mechanical systems, signage, etc. to the north mezzanine level of the main arena to address the need to provide increased wheelchair accessible seating locations in the venue. During the construction period, the main SEFCU lobby doors leading to the mezzanine level will be inaccessible and parts of the mezzanine will not be open to pedestrian traffic. Arena floor areas below and adjacent to the north mezzanine will be unavailable during construction, but efforts will be made to maintain access to arena restrooms and doors leading to/from the arena floor. |
Estimated Start: 6/27/2016 - 7:00am |
Estimated End: 9/30/2016 - 5:00pm |
More Details |
Building 25 Renovation |
Project Description / Scope:
Sidewalk demolition and installation work will begin in the areas between Building #25 and the Podium. Please refer to the attached map for locations. Future alerts will be issued if any of the work will effect traffic patterns. |
Estimated Start: 6/13/2016 - 9:00am |
Estimated End: 8/1/2016 - 4:00pm |
More Details |
Colonial Quad - Herkimer Hall |
Project Description / Scope:
Monday 6/20, the renovation of Herkimer Hall will begin. The parking area immediately to the south of the building will be closed for the duration of the construction project. |
Estimated Start: 6/20/2016 - 7:00am |
Estimated End: 8/1/2017 - 4:00pm |
More Details |
State Quad Dining Hall - Painting and stair repair |
Project Description / Scope:
Painting of dining walls, kick plates and rubber slip resistant repairs to kitchen entry stairs. |
Estimated Start: 5/26/2016 - 8:00am |
Estimated End: 6/20/2016 - 4:00pm |
More Details |
Campus Center Patroon Room |
Project Description / Scope:
Furniture shampooing and Blinds cleaned. |
Estimated Start: 6/4/2016 - 8:00am |
Estimated End: 6/4/2016 - 4:00pm |
More Details |
Indian Quad Dining Hall |
Project Description / Scope:
Painting of dining walls, kick plates and rubber slip resistant repairs to kitchen entry stairs. |
Estimated Start: 5/26/2016 - 8:00am |
Estimated End: 6/20/2016 - 4:00pm |
More Details |
Restrooms Rehabilitation |
Project Description / Scope:
Upgrade all public restrooms on the Uptown & Downtown campus and provide code compliant accessibility. At least one Universal restroom conversion per building will be included in the project scope. |
Estimated Start: 5/26/2016 - 8:00am |
Estimated End: 5/26/2016 - 7:00pm |
More Details |
Dutch Quad - Stuyvestant Tower Elevators |
Project Description / Scope:
Due to repairs necessary as part of the Dutch Elevator Modernization Project, there will be NO elevator service during the dates indicated. |
Estimated Start: 5/31/2016 - 6:00am |
Estimated End: 6/3/2016 - 7:00am |
More Details |
Colonial Quad - Upgrade and Renovate Stormwater System |
Project Description / Scope:
Construction work related to this project will be completed in two areas: area “A” between the Podium and Colonial Quad and area “B” north of Colonial Quad (Reference the attached map of work areas). The parking spaces adjacent to Area A on Colonial Drive will be out of service for the duration of the project (Reference the Blue area on the attached map). The work includes installation of two stormwater systems (underground detention/infiltration and dry detention), repair/replacement of existing structures and piping, and site restoration. |
Estimated Start: 5/27/2016 - 7:00am |
Estimated End: 8/12/2016 - 6:00pm |
More Details |
Science Library - Utility Shutdown |
Project Description / Scope:
During this utility shutdown there will be no heat, air conditioning or domestic hot water for the dates noted. This is due to the annual Power Plant Shutdown as well as additional work at the Campus Center Expansion. |
Estimated Start: 5/15/2016 - 4:00pm |
Estimated End: 6/1/2016 - 8:00am |
More Details |
Freedom Quad “C” cluster Bathroom Renovations |
Project Description / Scope:
Renovate 24 existing bathrooms located in “C” freedom Quad, remove existing units and replace with new showers, walls, floors, ventilation, vanities. |
Estimated Start: 5/16/2016 - 7:00am |
Estimated End: 8/12/2016 - 12:00pm |
More Details |
Campus Wide Accessibility Study |
Project Description / Scope:
The Consultants for the project, Hymen Hayes will be doing an orientation walk-thru of the Uptown Campus buildings. The will be wearing their firm ID cards. |
Estimated Start: 5/12/2016 - 8:00am |
Estimated End: 5/13/2016 - 9:00pm |
More Details |
Colonial Tunnel Repair Project |
Project Description / Scope:
For the repairs necessary in the Colonial Quad Tunnel, the parking in the area immediately south of Herkimer Hall will be closed during construction. |
Estimated Start: 5/16/2016 - 5:00am |
Estimated End: 7/1/2016 - 4:00pm |
More Details |
Annual Power Plant Shutdown 2016 |
Project Description / Scope:
The University's community should expect minimal heating and air conditioning service during the above mentioned period in the uptown campus buildings excluding areas serviced by local systems. Domestic hot water will not be available during this time except areas serviced by local systems, i.e… SEFCU arena, Boor Sculpture Studio, Liberty, Freedom and select residence halls rooms. |
Estimated Start: 5/15/2016 - 4:00pm |
Estimated End: 6/1/2016 - 8:00pm |
More Details |
Podium Landscaping |
Project Description / Scope:
Work includes planting trees, shrubs, plants and mulch at the Podium level fountain plaza. The landscaping work will not impact any Podium areas and work should be completed within two weeks. For more information please see https://www.albany.edu/facilities/fp/podium_planters.html |
Estimated Start: 3/28/2016 - 7:00am |
Estimated End: 4/8/2016 - 7:00pm |
More Details |
Rehabilitation of Toilet Rooms for ADA |
Project Description / Scope:
Site investigation of each public restroom on campus in preparation for design to upgrade all such restrooms to be handicapped accessible. A Universal bathroom per building will also be included as part of the project. |
Estimated Start: 3/14/2016 - 8:00am |
Estimated End: 3/23/2016 - 5:00pm |
More Details | Field Survey Schedule |
Draper Entry Plaza - Veterans Memorial |
Project Description / Scope:
Due to repairs necessary in Installation of the new Veterans Memorial Garden. Garden is to be located at the west side of the Draper Entry Plaza, adjacent to the Husted main entrance. |
Estimated Start: 3/7/2016 - 7:00am |
Estimated End: 5/27/2016 - 3:00pm |
More Details |
Dutch Quad Tunnel Repair |
Project Description / Scope:
Due to repairs necessary in the Dutch Quad Tunnel, high temperature hot water will not be available for Dutch Quad or the athletics facilities. Please note the hot water shut down will continue past the normal plant shut down until approximately July 1st. ATHLETICS will NOT have hot water during this project. There will be no Data, Voice or Cable TV for Ten Eyck, Ryckman, Van Ren and Schuyler halls. There will also be minor power interruptions for Ten Eyck and Ten Broeck which will be coordinated at a later date. |
Estimated Start: 5/15/2016 - 7:00am |
Estimated End: 7/1/2016 - 4:00pm |
More Details |
Fire Alarm Upgrade Project - Fiber Testing |
Project Description / Scope:
The campus will be cleaning and testing the fire alarm fiber optic loop on the Uptown Campus. During the process the panels may beep. Please note that all buildings will have full fire protection during the cleaning and testing process. |
Estimated Start: 1/11/2016 - 7:00am |
Estimated End: 2/5/2016 - 4:00pm |
More Details |
University Drive - South Side - Tree Restoration |
Project Description / Scope:
Tree restoration project phase 1 – removal of dead trees along University Drive from SEFCU arena parking lot entrance eastward to Liberty Terrace. Road traffic will be reduced to one lane with flaggers and signage. The Purple Path will be CLOSED. Work area will be identified with barricades and signage. |
Estimated Start: 1/5/2016 - 8:00am |
Estimated End: 1/6/2016 - 4:00pm |
More Details |
Alumni Quad Dorm Field - Exterior Lighting Improvements |
Project Description / Scope:
Excavation around the perimeter of Alumni Quad’s dorm field will allow for the installation of new conduits, feeders and pole bases for approximately 20 light poles that surround Alumni’s dorm field. All sidewalks, driveways and exterior steps will be affected. Vehicle access to the dorm field will be prohibited on December 22, 2015. |
Estimated Start: 12/21/2015 - 7:00am |
Estimated End: 1/8/2016 - 3:00pm |
More Details |
Campus Center Expansion – North / South Access |
Project Description / Scope:
North – South access at the Ground Level will be disrupted starting December 21, 2015 and remain in place until the completion of the interior renovations of the existing Campus Center.
The North – South pedestrian route at the ground level, from the 518 Convenience Market to the SEFCU Bank & Atm’s will no longer be available. Please see the attached sketches regarding pedestrian route options. For more information about the Campus Center Expansion project visit the UA featured project website at: https://www.albany.edu/facilities/fp/campus_center.html |
Estimated Start: 12/21/2015 - 7:00pm |
Estimated End: 12/30/2016 - 5:00pm |
More Details |
Indian Quad - Oneida & Seneca Basement |
Project Description / Scope:
Seneca, the fall out area, and Oneida will have no power on Saturday from Noon – 12:30 during an equipment installation. Additionally, there will be no internet service during this time. |
Estimated Start: 12/19/2015 - 12:00pm |
Estimated End: 12/19/2016 - 12:30pm |
More Details |
Campus Center Expansion - Asbestos Abatement |
Project Description / Scope:
Asbestos abatement work is to begin in the northwest stairwell of the Campus Center on Wednesday 12/9. This work is expected to be completed in 3-4 weeks. The stairs from the Podium level to the 3rd floor will be closed to all pedestrian traffic during this timeframe. The stairs will remain open to the sub-basement level. Access to the elevator will not be affected and access to the Assembly Hall will be via signage placed throughout the 2nd floor. |
Estimated Start: 12/9/2015 - 7:00am |
Estimated End: 1/10/2016 - 12:00am |
More Details |
Building 25 (Old Health Center) Renovation |
Project Description / Scope:
Full gut renovation of building, including mechanical, electrical, plumbing systems, telecommunications systems, windows, roofing, and the adjacent site that includes, parking, sidewalks and landscaping. |
Estimated Start: 10/12/2015 - 8:00am |
Estimated End: 3/1/2017 - 8:00am |
More Details |
Dutch Quad and Softball field intersection(s) – Roadway Closure Near UKIDS |
Project Description / Scope:
Repair Under Ground Heating Pipes. Roadway Passage through this area will be limited. UKIDS will remain accessible from the West or Dutch Quad Parking Lot. |
Estimated Start: 9/1/2015 - 12:00am |
Estimated End: TBD |
More Details |
University Hall – Annual Fire Alarm System Testing |
Project Description / Scope:
The Office of Fire Safety will be conducting an Annual Inspection of the Fire Alarm System to include
Smoke and Heat Detectors. |
Estimated Start: 8/25/2015 - 8:00am |
Estimated End: 8/26/2015 - 4:00pm |
More Details |
Collins Circle Main Entrance – Traffic Signal |
Project Description / Scope:
The City of Albany will be replacing all traffic signals on Washington Avenue in front of Collins Circle on Wednesday August 19th. Accordingly, the Collins Circle main roadway entrance / exit at Washington Avenue will be closed for one day on August 19, 2015, from 6 AM to 6PM. The campus east and west roadways to/from Washington Avenue will be open for use. Please see the attached map for detour route. |
Estimated Start: 8/19/2015 - 6:00am |
Estimated End: 8/19/2015 - 6:00pm |
More Details |
Domestic Hot Water Interruption |
Project Description / Scope:
This project involves the removal of the existing Due to Electrical work on the Main Service to the Power Plant, the HTHW generators will be shutdown at 8PM Saturday
evening August 15, 2015. Domestic hot water will continue to be available until 10 PM. The Electric outage at the Power
Plant will last 4 to 6 hours. Domestic hot water service will again be available by 6 AM. Chilled water for Campus cooling
will be unaffected. |
Estimated Start: 8/15/2015 - 10:00pm |
Estimated End: 8/16/2015 - 6:00am |
More Details |
Colonial Quad Loading Dock - Concrete Floor Repairs |
Project Description / Scope:
This project involves the removal of the existing damaged concrete floor at the Colonial Quad
Loading Dock and installation of a new concrete surface. This will affect access to the dock for
approximately two weeks. Very limited foot traffic will be possible for a portion of this time, but major
deliveries cannot be accommodated until after the new surface is complete. |
Estimated Start: 8/3/2015 - 6:00am |
Estimated End: 8/18/2015 - 4:00am |
More Details |
Center Drive West and Indian Roadway East - Road Repairs and Paving |
Project Description / Scope:
Road repairs/paving work at Center Drive West and on the service roadway on the east side of Indian
Quad. These areas will be closed to through traffic. The Social Science bus stop will be closed and
bus riders will be redirected to the Collins Circle bus stop. |
Estimated Start: 8/1/2015 - 6:00am |
Estimated End: 8/1/2015 - 5:00pm |
More Details |
Campus Center Expansion - Exterior Site Work |
Project Description / Scope:
The walkway adjacent to the Campus Center Expansion on the east side by the Physics Building will
be closed from Thursday, July 16 until Saturday, August 1. Please use the Physics Building for entry
to the Podium or Campus Center. Both Physics doors adjacent to the construction site and the
Campus Center doors will remain open during this period. Please see attached map. |
Estimated Start: 7/16/2015 - 7:00am |
Estimated End: 8/1/2015 - 4:00pm |
More Details |
Campus Center Expansion - East–West Access |
Project Description / Scope:
East–West access at the Ground Level will be disrupted starting July 7, 2015 and remain in place until the completion of the interior renovations of the existing Campus Center.
Existing East-West pedestrian flow via Campus Center Commons and the corridor located south of Campus Center Commons will no longer be available.
East–West access can be achieved via the service tunnel, the Parent’s fountain courtyard or the Science Library lobby. See attached sketch. For more information about the Campus Center Expansion project, visit the UA featured project website. |
Estimated Start: 7/7/2015 - 7:00am |
Estimated End: 1/1/2017 - 5:00pm |
More Details |
Onondaga Oneida Renovation - Project Commencement |
Project Description / Scope:
The renovation project is beginning,Oneida being offline for this summer, and Onondaga being fully closed until its reopening in August of 2016. |
Estimated Start: 7/4/2015 - 7:00am |
Estimated End: 8/4/2016 - 12:00pm |
More Details |
Grounds Fueling Station - Dry Chemical Fire Suppression |
Project Description / Scope:
Semi-annual inspection, testing and maintenance of dry chemical fire suppression system. |
Estimated Start: 7/6/2015 - 9:00am |
Estimated End: 7/6/2015 - 3:00pm |
More Details |
Power Plant & Data Center - Power Plant Smoke Stack Cleaning & Painting |
Project Description / Scope:
Lift equipment may intermittently block the access way between power plant and data center for
smoke stack cleaning and painting. |
Estimated Start: 6/23/2015 - 12:00am |
Estimated End: 6/30/2015 - 12:00am |
More Details |
Campus Center - Grand Staircase |
Project Description / Scope:
The Grand Staircase in the Campus Center will be closed permanently as of Monday, June 22 at
7:00 a.m. This staircase is being removed as part of the Campus Center Expansion and will be
barricaded with a new wall on that date. Please use the two stairways on the north end of the
Campus Center to access the basement level. Map attached. |
Estimated Start: 6/22/2015 - 7:00am |
Estimated End: 1/1/2016 - 12:00am |
More Details |
Grounds Fueling Station - Dry Chemical Fire Suppression |
Project Description / Scope:
Semi-annual inspection, testing and maintenance of dry chemical fire suppression system. |
Estimated Start: 7/1/2015 - 9:00am |
Estimated End: 7/1/2015 - 3:00pm |
More Details |
Colonial Bike Room - Colonial Stair Repairs |
Project Description / Scope:
Remove some of the landing and steps, then replace with new concrete. |
Estimated Start: 6/11/2015 - 12:00am |
Estimated End: 7/10/2015 - 12:00am |
More Details |
Podium, Dormitory Quadrangles, Physical Education, SEFCU Arena and Service Buildings - Emergency Power Plant Weekend Shutdown |
Project Description / Scope:
The University's community should expect minimal heating and air conditioning service
during the above-mentioned period in the uptown campus buildings excluding areas serviced by local
systems. Domestic hot water will not be available during this time except areas serviced by local
systems, i.e... SEFCU Arena, Boor Sculpture Studio, Liberty, Freedom and select residence halls.
This is being done to facilitate a repair on the HTHW service tunnel piping that developed after the
recent Annual Shutdown. |
Estimated Start: 6/12/2015 - 4:00pm |
Estimated End: 9/13/2015 - 10:00pm |
More Details |
Campus Center Expansion – Hazardous Materials Removal |
Project Description / Scope:
Asbestos and PCB removal in various locations of the Campus Center will be on-going throughout
the summer. The areas will be flagged off and all safety protocols are to be monitored by an
independent agency. There is no danger to passing pedestrians since air quality is closely monitored
at all times. It should also be noted that the asbestos currently being removed is contained in the glass and is non-friable, meaning it does not become air borne. |
Estimated Start: 06/05/2015 - 12:00am |
Estimated End: 09/30/2015 - 12:00pm |
More Details |
Dutch Quad – Tunnel Repairs - Utility Interruptions |
The high temperature hot water lines feeding Dutch and Athletics will be off-line for an additional period of time for abatement work. We are securing hard dates and will continue to provide scheduling information. Repairs are anticipated to take four weeks with utility restoration thereafter. Systems affected are the electric feeder, telephone, data and CATV. Domestic hot water on for the summer will remain on for Dutch apartments. We are working with all necessary University Offices to minimize service interruptions. Buildings that will be affected include: Ten Eyck, Van Rensselaer, Ryckman, Schuyler, PE and SEFCU. |
Estimated Start: 6/1/2015 - 6:00am |
Estimated End: 7/3/2015 - 4:00pm |
More Details |
Campus Wide - Elevator Inspections |
Annual Elevator Tests and Inspections. This work will take elevators out of service for short periods. |
Estimated Start: 6/1/2015 - 7:00am |
Estimated End: 7/31/2015 - 4:00pm |
More Details |
Washington Avenue - East Entrance Improvements |
The Washington Avenue East Entrance roadway and sidewalk will be closed during construction from June 8, 2015 to August 17, 2015. Please see the attached map for detour route. The project includes utility adjustments, paving, re-grading, selective tree removal, landscaping, and installation of a new pedestrian sidewalk with lighting. This project will improve vehicular flow in and out of the campus by installing turn lanes and adjusting Washington Avenue traffic lighting. |
Estimated Start: 6/8/2015 - 6:00am |
Estimated End: 8/17/2015 - 6:00am |
More Details |
Social Science - Repair of Southwest Doorway Leading to Bus Stop |
Repairs to concrete sidewalk will impact this doorway. Please use another exit/entrance. |
Estimated Start: 5/22/2015 - 12:00am |
Estimated End: 6/27/2015 - 12:00am |
More Details |
Washington Avenue - East Entrance Improvements |
The Washington Avenue East Entrance roadway and sidewalk will be closed during construction. Please see the attached map for detour route. The project includes utility adjustments, paving, re-grading, selective tree removal, landscaping, and installation of a new pedestrian sidewalk with lighting. This project will improve vehicular flow in and out of the campus by installing turn lanes and adjusting Washington Avenue traffic lighting. |
Estimated Start: 5/26/2015 - 12:00am |
Estimated End: 8/17/2015 - 12:00am |
More Details |
Annual Power Plant Shutdown 2015 |
The University's community should expect minimal heating and air conditioning service during the above mentioned period in the uptown campus buildings excluding areas serviced by local systems. Domestic hot water will not be available during this time except areas serviced by local systems, i.e…SEFCU arena, Boor Sculpture Studio, Liberty, Freedom and select residence halls. |
Estimated Start: 5/17/2015 - 4:00pm |
Estimated End: 6/1/2015 - 8:00am |
More Details |
Campus Center - Small Fountain Dome Repairs |
Remove and replace dome panels, scaffold fountain area up to dome. |
Estimated Start: 5/18/2015 - 12:00pm |
Estimated End: 6/1/2015 - 12:00am |
More Details |
Campus Center - Partial Electric Shutdown |
There will be a shutdown of selected electric panels at the Campus Center this coming Friday from 10 pm until Saturday at 5 am as part of the Electrical upgrades pertaining to the Campus Center Expansion. The only area affected will be the basement level (food service level) and will primarily affect wall outlets and the elevator lights. As a result, the elevators will not be in service during this period. To minimize start-up problems once the power has been restored, it is recommended that all staff and students who have offices in the building shut down their computers prior to this shutdown. |
Estimated Start: 5/1/2015 - 10:00pm |
Estimated End: 5/2/2015 - 5:00am |
More Details |
Facilities Physical Space Inventory Update |
Starting Wednesday, April 29, 2015 and continuing through Monday, May 18, 2015, the architecture
and planning firm of JMZ will be on campus to audit and update our Physical Space Inventory
database. Their work will consist of space walkthroughs to review and familiarize themselves with our
campus organizations and buildings. These walkthroughs will be brief as they are planning to cover
over 150,000 gross square feet of our facilities a day. No participation is required of either Department Heads or Building Managers at this time. If you are available and would like to tour your space with JMZ, you are invited to do so. We recognize the walkthrough schedule is at a sensitive time of year with finals and graduation approaching and we do not wish to inconvenience anyone's work schedules. JMZ has been instructed to review all spaces quickly and quietly and without any interruptions to students, staff or faculty. |
Estimated Start: 4/29/2015 - 12:00am |
Estimated End: 5/18/2015 - 12:00am |
More Details |
Dutch Quad - Paver Plaza Repair |
Two paver plazas on the Northwest corner of Dutch Quad are to be repaired beginning April 21 and take approximately one week. Pedestrian traffic will be re-routed around the work zone. Please see attached map. |
Estimated Start: 4/21/2015 - 7:00am |
Estimated End: 4/29/2015 - 4:00pm |
More Details |
Campus Center Expansion - South of Physics |
Physics Lane will be closed from 7:00 am to 9:00 am on Tuesday, April 14, 2015 for off-loading materials for the Campus Center Expansion. Indian Drive will become two-way for this brief period of time. Please use caution. See attached map. |
Estimated Start: 4/14/2015 - 7:00am |
Estimated End: 4/14/2015 - 9:00am |
More Details |
Lecture Centers Podium West Concrete Roofing Replacement |
Remove concrete and stone, abatement, replace roofing, stone, concrete, seal and caulk. |
Estimated Start: 5/18/2015 - 12:00am |
Estimated End: 12/18/2015 - 12:00am |
More Details |
Campus Center East Concrete Roof Replacement |
Remove 25 concrete pavers, abatement, roof, replace concrete. |
Estimated Start: 4/13/2015 - 12:00am |
Estimated End: 6/1/2015 - 12:00am |
More Details |
Performing Arts Podium Planters |
Provide new waterproofing for L shaped planters and re-establish plantings. |
Estimated Start: 4/9/2015 - 12:00pm |
Estimated End:04/30/2015 - 12:00am |
More Details |
Campus Center Electrical Shutdown |
All electric power to the Campus Center will be shutdown this coming weekend at 6pm on Friday, March 13th, 2015. |
Estimated Start: 3/13/2015 - 6:00pm |
Estimated End: 3/16/2015 - 6:00am |
All electric power to the Campus Center will be shutdown this coming weekend at 6pm on Friday, March 13th and will be restored by 6:00am on Monday, March 16th to allow for the installation of new switch gear. A generator will be installed for Life Safety systems and certain coolers for the kitchen. The building will be closed to all students and staff. |
More Details |
Humanities Concrete Demolition Phs IV |
Removal of an existing concrete stage on two Saturdays, February 14th and 28th, 2015. There will be no access to classrooms HU 039, 040, 041 during this time. |
Estimated Start: 2/14/2015 - 7:00am-4:00pm |
Estimated End: 2/28/2015 - 7:00am-4:00pm |
Removal of an existing concrete stage on two Saturdays, February 14th and 28th, 2015. There will be no access to classrooms HU 039, 040, 041 during this time. The concrete demolition work will take place between 7:00am - 4:00pm. |
More Details |
Humanities Classroom Renovation |
Asbestos floor tile, mastic, caulk, glazing compounds, panels, pipe fitting insulation and other asbestos containing materials will be removed from classrrooms HU 039, 040, 041 as part of the classroom renovation project. |
Estimated Start: 1/26/2015 |
Estimated End: 2/5/2015 |
Asbestos floor tile, mastic, caulk, glazing compounds, panels, pipe fitting insulation and other asbestos containing materials will be removed from classrrooms HU 039, 040, 041. |
More Details |
Asbestos Abatement 3rd Floor PE Building |
Asbestos abatement of carpet, floor tile and mastic in rooms 307-313 (NCAA Compliance and Football Offices). |
Estimated Start: 1/22/2015 |
Estimated End: 1/30/2015 |
Asbestos abatement of carpet, floor tile and mastic in rooms 307-313 (NCAA Compliance and Football Offices). |
More Details |
Pumping of Grease Traps in all Campus Center Kitchens |
Scheduled cleaning of grease traps in all kitchens located in the Campus Center |
Estimated Start: 1/6/2015 |
Estimated End: 1/6/2015 |
Scheduled cleaning of grease traps in all kitchens located in the Campus Center. |
More Details |
ITM Grounds Fueling Station Dry Chemical Fire Supression System |
Semi-annual inspection, testing and maintenance of dry chemical fire supression system. |
Estimated Start: 1/8/2015 |
Estimated End: 1/8/2015 |
Semi-annual inspection, testing and maintenance of dry chemical fire supression system. |
More Details |
Science Library Power Outage |
A power outage is necessary for the replacement of a circuit breaker. All 120 volt outlets will not have power on the ground level. |
Estimated Start: 1/2/2015 |
Estimated End: 1/2/2015 |
A power outage is necessary for the replacement of a circuit breaker. All 120 volt outlets will not have power on the ground level. This will not affect lighting or power on any other floors. |
More Details |
Campus Wide Elevator Inspections |
Annual safety tests and periodic inspection of all campus elevators will be conducted. |
Estimated Start: 12/15/2014 |
Estimated End: 1/16/2015 |
Annual safety tests and periodic inspection of all campus elevators will be conducted. This work may take each elevator out of service for short durations |
More Details |
Campus Center Expansion Power Shut Down |
All power will be shutdown at the Campus Center on two consecutive weekends. |
Est Start: 1/2/2015 at 9:00PM - Est End: 01/05/2015 at 6:00AM |
Est Start: 1/9/2015 at 5:00PM - Est End: 01/12/2015 at 6:00AM - CANCELED |
All power will be shutdown at the Campus Center on two consecutive weekends to allow for asbestos abatement and installation of new switch gear. Dates and times are as follows: 1/2/15 at 9PM - 1/5/15 at 6AM and CANCELED - 1/9/15 at 5PM - 1/12/15 at 6AM - CANCELED. |
More Details |
Campus Wide Elevator Inspections |
Annual safety tests and periodic inspection of all campus elevators will be conducted. |
Estimated Start: 12/15/2014 |
Estimated End: 1/16/2015 |
Annual safety tests and periodic inspection of all campus elevators will be conducted. This work may take each elevator out of service for short durations |
More Details |
Ornamental Fountains Shutdown |
Campus Ornamental fountains will be shutdown for the winter season |
Estimated Start: 11/3/2014 |
Estimated End: 3/23/2015 |
Campus ornamental fountains will be shut down for the winter season, starting with the Entry plaza fountain, followed by the Parents fountain and Lecture Center fountain and Campus Center fountain. |
More Details |
Life Sciences, Indian Quad and Building 25 |
Construct ETEC Building & Renovate Building 25 |
Estimated Start: 10/16/2014 |
Estimated End: 10/16/2014 |
Fire hydrant flow testing will be conducted on 2 hydrants near Life Sciences, 1 hydrant near Indian Quad and 1 hydrant near Building 25. Due to testing, there is a possibility that sediment in campus water mains could be disturbed resulting in a slight discoloration of water at water fixtures near the testing sites. This discoloration is harmless and it is suggested that users run the water at the fixture until it is clear again. |
More Details |
Empire Commons |
Painting Center Line |
Estimated Start: 9/27/2014 |
Estimated End: 9/27/2014 |
Painting of a single 4" yellow line travel lane delineator will be done along Capital Hill Drive starting at Building 25 north to the intersection of Excelsior Drive. The installation of painted stop bars at the Intersections of Liberty Lane and Capital Hill Drive in addition to the exit from the parking area south west of B5 Empire will also be done. |
More Details |
Business Building |
Business Building / Colonial Commons – Sidewalk Closure |
Estimated Start: 9/08/2014 |
Estimated End: 10/08/2014 |
The sidewalk between the Business Building and Colonial Commons will be closed in order to perform work related to the storm sewer. The sidewalk will be closed from 9/8/14 to 10/8/14. |
More Details | Map |
Business Building & Stadium |
Elevator Inspection |
Estimated Start: 8/27/2014 |
Estimated End: 8/28/2014 |
Annual no load testing and inspection of elevators will be done one at a time. Each elevator will be out of service for about one hour. |
More Details |
Campus Center |
Concrete Roof Replacement |
Estimated Start: 8/25/2014 |
Estimated End: 11/25/2014 |
Remove top layer of concrete and replace roofing; form and pour new concrete on lower level of podium in front of campus center. |
More Details |
Physics/Campus Center |
Campus Center Expansion |
Estimated Start: 8/14/2014 |
Estimated End: 8/16/2014 |
The corridor between Physics and the Campus Center will be closed from Thursday, August 14 at 7:00 a.m. through Friday, August 15 at approximately 3 p.m. for work on the High Temperature Hot Water system. Pedestrians will be directed to walk through the tunnel to access the Campus Center. See map link below. |
More Details | Map |
Podium Lecture Center – New Retail Venue |
Argo Tea Installation |
Estimated Start: 7/31/2014 |
Estimated End: 9/16/2014 |
A new retail venue will be constructed in the area of the old vending area on the north side of the Lecture Center. A construction partition will enclose the work area. The computer lounge area will be offline for the duration of construction. |
More Details |
PHYSICS BUILDING/CAMPUS CENTER |
Campus Center Expansion |
Estimated Start: 7/25/2014 |
Estimated End: 8/28/2014 |
Excavation work to begin in the basement level plaza between Physics and Campus Center starting Friday, July 25 at 6 a.m. and continuing through August. Entry from the east will be through the Physics Building. Entry from the Podium level will be via the stairwell for approximately two weeks at which point the stairwell will also be closed. The corridor inside the building will be maintained for open passage through this period. |
More Details | Map |
University Drive and Roadways |
Roadway Line Painting |
Estimated Start: 7/28/2014 |
Estimated End: 7/29/2014 |
University Drive and campus roadways – center line striping and crosswalk painting will take place after 6:00 pm on Monday, July 28 and Tuesday, July 29 - weather permitting. |
More Details |
Education & Physics |
Campus Center Expansion |
Estimated Start: 7/14/2014 |
Estimated End: 7/16/2014 |
Concrete cutting and removal will begin in the southeast corner of Education (by the circular driveway) and the corridor between Campus Center and Physics. The work in the Physics corridor will occur from 6 pm through the night ending at 6 am. The work in Education will occur during normal work hours, from 7 am – 4 pm. This work will involve saw cutting and jackhammering and will cause vibration and noise throughout the basement level. The work is anticipated to take no more than two days. |
More Details | Map |
Business Administration |
Business Administration Bathrooms |
Estimated Start: 7/11/2014 |
Estimated End: 7/11/2014 |
Bathrooms are out of order this afternoon and should be back on by close of business today. The plumbers are working on the main sewer line for Business Administration. |
More Details |
State Purple Faculty/Staff Parking Lot |
Temporary Parking Lot Closure |
Estimated Start: 7/22/2014 |
Estimated End: 7/24/2014 |
State Purple Faculty/Staff Parking lot – temporary closure for improvements beginning Tuesday, July 22 through Thursday, July 24. As a reminder, “No Parking” signage with dates will be posted in advance. Parking is available in adjacent State Gold lot. |
More Details |
Indian East Student Parking and Indian Visitor Parking |
Test Bores |
Estimated Start: 8/04/2014 |
Estimated End: 8/18/2014 |
Consultants will be performing multiple test bores in various locations throughout the 2 parking lots. Access to the lots will not be available during this time. |
More Details |
Business Building |
Business Building – Water Outage |
Estimated Start: 7/08/2014 |
Estimated End: 7/08/2014 |
Hot and cold water service will be interrupted at the Business Building from 7am – 12pm on July 8, 2014. |
More Details |
Physics Building |
Campus Center Expansion |
Estimated Start: 7/07/2014 |
Estimated End: 7/07/2014 |
The northern portion of Physics Lane will be closed for excavation on Monday, July 7 from 7 am until 3 pm. Indian Drive will be open for two-way traffic during this period only. |
More Details | Map |
SEFCU Arena |
Purple Path, Phase 3C |
Estimated Start: 7/07/2014 |
Estimated End: 9/08/2014 |
The project includes re-grading, selective tree removal, utility adjustments, landscaping and installation of a new pedestrian sidewalk with lighting. The existing running path will be closed during construction. |
More Details | Map |
Dutch Tennis Courts |
Tennis Court Renovation |
Estimated Start: 6/30/2014 |
Estimated End: 9/01/2014 |
The Dutch tennis courts/basketball courts will be closed for public use starting Monday, June 30 for tennis court upgrades which include; new surfacing, new fence and lighting upgrades. A construction fence will be installed on Monday, the 30th followed by the removal of the existing fence in its entirety. Courts are re-scheduled to open on Monday, September 1. |
More Details |
Indian Quad – Mohawk Tower Renovation |
Indian Quad- No Parking near Montauk |
Estimated Start: 6/30/2014 |
Estimated End: 7/18/2014 |
Select parking locations between the Parking Management Building and Montauk Residence Hall will be off-line to allow for the delivery and install of the furniture and equipment at Mohawk. Please look for signage specifically indicating the restricted parking areas. See map indicating the general location. |
More Details | Map |
Perimeter Road |
Road Striping |
Estimated Start: 6/16/2014 |
Estimated End: 6/17/2014 |
University Drive center line striping, crosswalk striping – painting of roadway in re-paved areas of University Drive. |
More Details |
Campus Center |
Grease Trap Pumping |
Estimated Start: 6/16/2014 |
Estimated End: 6/16/2014 |
Pumping with remote grease trap pump in kitchen areas at Campus Center will take place. |
More Details |
Campus Center |
Grease Trap Pumping |
Estimated Start: 6/11/2014 |
Estimated End: 6/11/2014 |
Pumping with remote grease trap pump in kitchen areas at Campus Center will take place. |
More Details |
University Drive |
Milling Asphalt/Paving |
Estimated Start: 6/04/2014 |
Estimated End: 6/09/2014 |
Asphalt milling and paving will take place on University Drive from Empire Commons to Collins Circle – MSC access road past the baseball field and Great Dane Way to Empire Commons Roadway. |
More Details |
GROUNDS FUELING STATION |
DRY CHEMICAL FIRE SUPPRESSION |
Estimated Start: 6/09/2014 |
Estimated End: 6/09/2014 |
Semi-annual inspection, testing & maintenance of dry chemical fire suppression system. |
More Details |
Tunnel Area Behind Campus Center |
Radiographic Testing |
Estimated Start: 5/29/2014 |
Estimated End: 5/29/2014 |
Periodic closure of tunnel to traffic during brief periods of testing. |
More Details |
Campus Center |
Campus Center Expansion |
Estimated Start: 5/23/2014 |
Estimated End: 7/29/2014 |
Campus Center Expansion fencing installation: The area on the attached maps will be fenced off through the duration of each side of the project. The east side area is slated to be completed by the summer of 2015, the west side area will continue through the winter of 2016. The fencing will periodically be moved to allow for greater access as work is completed. Signage will be installed and constantly updated to assist with access and wayfinding as the project progresses. |
More Details | West Map | East Map |
Multiple Quads | ||||||||||||||||||||||||||||||
Water Shutdowns | ||||||||||||||||||||||||||||||
Estimated Start: 5/20/2014 | ||||||||||||||||||||||||||||||
Estimated End: 6/04/2014 | ||||||||||||||||||||||||||||||
The water in the buildings listed below will be shut down for water meter bypass insulations:
| ||||||||||||||||||||||||||||||
More Details |
Dutch Quad Parking Lot |
Data Center Redundant Network Connectivity – Sidewalk Closure |
Estimated Start: 5/19/2014 |
Estimated End: 5/23/2014 |
New underground conduits will be installed in the lawn area between Dutch Quad and Dutch Student Parking Lot. These conduits are required for the installation of fiber optic cabling from the new Data Center to buildings on the Uptown Campus. The new conduit path will cross one of the sidewalks from Dutch Student Parking Lot which will result in the temporary closure of the sidewalk. |
More Details |
Power Plant, Service Building A (SBA), & Service Building A Annex Relocate University Data Center |
Power Interruptions |
Estimated Start: 5/20/2014 |
Estimated End: 5/22/2014 |
Building power interruptions are required for the connection of back-up generators in the new Data Center to the Power Plant. These interruptions will be as follows:
|
More Details |
Colonial Quad Kitchen |
Elevator Replacement |
Estimated Start: 6/02/2014 |
Estimated End: 6/30/2014 |
Otis will be replacing the Kitchen Freight elevator with a scissors lift. |
More Details |
Indian Quad – Mohawk Tower Renovation |
Concrete Installation at Courtyard - Update |
Estimated Start: 4/23/2014 |
Estimated End: 4/23/2014 |
Due to the predicted inclement weather, the following activity has been postponed until Wednesday: This work is for the concrete walkway on the north side of Mohawk Tower, requiring a concrete pumper truck. The truck will be parked on the pavers just north of Montauk and the concrete will be pumped over top of Montauk to the courtyard beginning at 1pm. The road will remain open in this area; however, the parking will be restricted Tuesday morning until the concrete work is complete. Please use caution while in this area. |
More Details |
Academic Podium – Humanities Building |
Redundant Network Connectivity |
Estimated Start: 4/18/2014 |
Estimated End: 4/22/2014 |
The contractors will be doing some intermittent drilling in the wall of the steam tunnel below the Humanities Building at the Academic Podium. This may cause periods of noise reverberation in the rooms above. |
More Details |
Mohawk Tower Renovation |
Indian Road Work |
Estimated Start: 4/10/2014 |
Estimated End: 4/11/2014 |
The contractor will be working at the new manholes on the roadway south of Indian Quad. The road will be maintained open, but with cones and flagmen at the construction locations. Please use caution when in the area. |
More Details |
STATE QUAD LOADING DOCK |
OVERHEAD DOOR AND WALL REPAIR |
Estimated Start: 4/8/2014 |
Estimated End: 4/9/2014 |
Remove overhead door and framing. Make repairs to wall where damaged. Secure opening for overnight, replace framing, reinstall overhead door and adjust. |
More Details |
Campus Center |
Fire Alarm System Testing |
Estimated Start: 4/15/2014 |
Estimated End: 4/15/2014 |
Test voice intelligibility of fire alarm system in the Campus Center Cafeteria. Campus Center fire alarm system notification will be activated intermittently throughout the duration of the test. Evacuation not required during fire alarm system testing; however, building occupants should use caution and be prepared to evacuate the building in the case of a real emergency. |
More Details |
Podium deck above LC#4 |
Podium Joint Repairs |
Estimated Start: 4/01/2014 |
Estimated End: 4/25/2014 |
Remove 4 slabs of concrete from deck; remove stone, and repair to stop leak |
More Details |
Campus Center |
Fire Alarm System Testing |
Estimated Start: 4/02/2014 |
Estimated End: 4/02/2014 |
Test voice intelligibility of fire alarm system in the Campus Center Cafeteria. Campus Center fire alarm system notification will be activated intermittently throughout the duration of the test. Evacuation not required during fire alarm system testing; however, building occupants should use caution and be prepared to evacuate the building in the case of a real emergency. |
More Details |
Lecture Center |
Rehabilitate Water Tower, Fountains & Main Fountain |
Estimated Start: 3/22/2014 |
Estimated End: 3/22/2014 |
Due to the forecasted weather conditions, the concrete pour scheduled for Saturday, March 22 has been canceled. |
More Details |
Lecture Center |
Rehabilitate Water Tower, Fountains & Main Fountain |
Estimated Start: 3/20/2014 |
Estimated End: 3/22/2014 |
The contractors will be pumping concrete to the Main Fountain plaza on Thursday, March 20 and Saturday, March
22 between 7:00 am and 7:00 pm. A concrete pumper will be located near the Entry Plaza/Fine Arts building.
Piping will be set on the podium deck to the Main Fountain plaza. Ramps will be constructed for pedestrian
traffic. At times during the pumping process, access to the parking space near University Hall may be limited. Please refer to the attached map. |
More Details | Map |
Colonial Quad, Dutch Quad (except Ten Eyck Hall), State Quad - Melville Hall, Indian Quad – Oneida Hall, & Freedom Quad |
Relocate University Data Center – Fire Alarm System Connection |
Estimated Start: 3/18/2014 |
Estimated End: 3/18/2014 |
The contractor for the new campus Data Center will connect the building into the campus fire alarm
system. During the connection of this building to the campus system, there is a potential that fire
alarms that occur in the following buildings might not be received at the campus central monitoring
station:
|
More Details |
Tower in Colonial Quad |
Elevator Repair |
Estimated Start: 3/17/2014 |
Estimated End: 3/19/2014 |
Otis will replace ropes on #3 Elevator at Colonial Quad’s Livingston Tower. For safety reasons, #2 Elevator will also be out of service during working hours. |
More Details |
Business Building |
Business Building - Alert #26 Smoke Purge System Test |
Estimated Start: 2/21/2014 |
Estimated End: 2/21/2014 |
A smoke purge system test will be performed at the new Business Building at 12 pm on February 21, 2014. The test will generate large volumes of air flow throughout the building. The smoke purge system is a system to be utilized by responding emergency personnel during an emergency. Again, this is only a test to ensure proper operation. |
More Details |
Uptown and Downtown Campuses |
MULTIPLE BUILDINGS |
Estimated Start: 2/25/2014 |
Estimated End: 3/03/2014 |
Below is the schedule for fire door inspections: Tuesday, February 25, Academic Podium – Chemistry, Physics, possibly Biology Wednesday, February 26, Indian Quad – Montauk Hall, Mahican Hall, Adirondack Hall, Cayuga Hall Monday, March 3, Downtown – Richardson Hall, possibly Page Hall The impact on building occupants should be minimal. The scope of work will generally be fire doors in exits and mechanical spaces. Someone from EH&S will accompany the contractor at all times. |
More Details |
State Quad Fulton and Irving |
Podium Tunnel by Humanities (west end), Campus Center, & Chemistry (east end) |
Estimated Start: 2/20/2014 |
Estimated End: 2/21/2014 |
Project - to install fiber optic cabling to connect new campus Data Center to buildings on Uptown Campus. Work includes saw cutting short sections of Podium Tunnel floor to installing new cabling conduits into existing signal manholes located in Tunnel floor. Work may produce noticeable noise and/or vibration in rooms adjacent to the work location. |
More Details |
State Quad Fulton and Irving |
Water Main Repairs |
Estimated Start: 2/10/2014 |
Estimated End: 2/10/2014 |
Repairs are needed for a leaking water main in the service tunnel. The water for both State Fulton (C) and Irving (D) will need to be turned off for the repairs. There will be no water in either building during the repairs on Monday, February 10, 2014 from 3:30 am to 6 am. |
More Details |
Lecture Center |
Elevator Repair |
Estimated Start: 2/14/2014 |
Estimated End: 2/14/2014 |
Otis will be making repairs to the Lecture Center West elevator. |
More Details |
Campus Wide |
Elevator Inspections |
Estimated Start: 1/27/2014 |
Estimated End: 2/23/2014 |
Annual safety inspection and test of all Campus elevators will be conducted. This may cause all elevators to be out of service for up to one hour each. Students and/or Staff with special needs will be accommodated by notifying Customer Service at 442-3480. |
More Details |
Podium Tunnel by Education Building |
Data Center Network Connectivity Cabling Project |
Estimated Start: 1/23/2014 |
Estimated End: 2/05/2014 |
Project: To install fiber optic cabling to connect new campus Data Center to buildings on Uptown
Campus. Work includes installing ceiling hanger rods and conduits in the south Podium Tunnel. Contractor will periodically drill hanger rod anchors into the Podium Tunnel ceiling. Drilling should be infrequent and of short duration. However, it may produce noticeable noise and/or vibration in rooms adjacent to the work location. |
More Details |
Mohawk Tower Renovation |
Power Outage at Mahican and Montauk |
Estimated Start: 1/16/2014 |
Estimated End: 1/16/2014 |
Electrical tie-ins are being relocated as part of the Mohawk renovation project. Power will be off in Mahican and Montauk for approximately one hour. |
More Details |
Business Administration |
Water Restored |
Estimated Start: 1/14/2014 |
Estimated End: 1/14/2014 |
Water has been restored to the Business Administration Building. All restrooms are back in order. |
More Details |
Mohawk Tower Renovation |
Mechanical Equipment Installation w/ Temporary Road and Area Closures |
Estimated Start: 1/18/2014 |
Estimated End: 1/18/2014 |
Mechanical equipment will be air lifted from Indian Gold Lot to Mohawk Tower on Saturday, January 18, 2014. Operations are scheduled from 7:30 am to 1 pm and will restrict pedestrian, vehicular and parking access in the area.
Parking Lot Closures: Indian Gold Parking Lot = Lot will be closed at 5 pm on Friday 1/17/14 Indian Visitor Parking Lot = Lot will be closed at 5 pm on Friday 1/17/14 Road Closures: Center Drive East Indian Drive Justice Drive (West of the Grounds Department) Life Science Lane Chemistry Lane Physics Lane Science Library Loading Dock Access |
More Details | Map |
Arts and Sciences |
Pedestrian Tunnel Door Modifications |
Estimated Start: 1/13/2014 |
Estimated End: 1/17/2014 |
Two additional doors are to be added at the basement level of the East Stairwell. Vision panels are also to be added to the east and west doors into the basement corridors. While this work occurs, the stairwell from the first floor to the basement will be closed. The basement corridor to the Business Building will also be closed during this period. |
More Details |
Arts and Sciences |
Water Shutdown |
Estimated Start: 12/30/2013 |
Estimated End: 12/30/2013 |
The domestic water supply to the Arts and Sciences building will need to be turned off in order to make emergency repairs to the water supply line. The restrooms are closed in the building on all floors. |
More Details |
Business Building |
Water Shutdown |
Estimated Start: 12/28/2013 |
Estimated End: 1/06/2014 |
The domestic water supply to the Business Administration building has been turned off in order to make emergency repairs to the water supply line. The restrooms on all floors in the BA building are closed. Updates will be issued as repairs progress. |
More Details |
Business Building |
Terrazzo Polishing |
Estimated Start: 1/07/2014 |
Estimated End: 1/10/2014 |
Beginning January 7 at 4 pm, work will begin to polish the terrazzo in the entire basement area of the new Business Building. The area will be closed to all foot traffic while work is in progress between 4pm and 2:30am. |
More Details |
Chemistry |
Water Shutdown |
Estimated Start: 12/23/2013 |
Estimated End: 12/23/2013 |
There will be a complete shutdown of the hot and cold water in the Chemistry Building to allow valve installation on the second floor. Shutdown will start at 7:30 am and be restored as soon as valve installation is complete. |
More Details |
Physics 209 & Biology B-009 |
Asbestos Abatement |
Estimated Start: 12/20/2013 |
Estimated End: 01/10/2013 |
A project to remove asbestos floor tiles and mastic will take place starting in physics room 209 on Friday, December 20, 2013 and proceeding to biology B-009 with all asbestos removals completed by January 10, 2014. There will be no access to the rooms during the work period. The work area and designated pathways will be outlined in asbestos caution tape. There may be low citrus odors associated with the removals. |
More Details |
Dutch Quad and State Quad |
Uptown Quads – Power Quality Improvements |
Estimated Start: 12/23/2013 |
Estimated End: 12/23/2013 |
To finalize the installation of equipment that will improve the efficiency of the electrical systems throughout the facility, work needs to be done on the main transformers for these residential quads. This work will require a 1 hour power shutdown in both of the named quads; State Quad will experience a shutdown between 8 am and 9 am, Dutch between 10 am and 11 am. If work proceeds quickly, the Dutch power outage may begin as early as 9 am. |
More Details |
Performing Arts Center |
Scaffolding Set Up Over Main Stairs to Second Floor Lounge |
Estimated Start: 12/16/2013 |
Estimated End: 12/27/2013 |
Contractor will set up scaffolding over staircase to facilitate lamp replacement. Staircase will be useable after installation. Scaffolding will be removed within a two-week period. |
More Details |
All of Indian Quad |
Mohawk Tower Rehabilitation, Power Shutdown |
Estimated Start: 11/29/2013 |
Estimated End: 11/29/2013 |
Electrical power will be shut down to all residential halls, kitchen and loading dock in Indian Quad. |
More Details |
Colonial Planter over Dining Hall |
Replace Roofing of Planter |
Estimated Start: 11/08/2013 |
Estimated End: 01/08/2014 |
Dig out planter, replace old roofing, put in new stone and drainage pipe. Put down filter fabric, back fill with top soil. Put copper cap on seal concrete. |
More Details |
Business Building |
Interior Stair Closure |
Estimated Start: 11/01/2013 |
Estimated End: 11/04/2013 |
No access will be permitted at the interior stairways in the Business Building during the period identified above. This closure is required to perform construction tasks associated with interior stairs. The stair towers and the elevators will remain in service during this period to permit vertical circulation throughout the building. For more details regarding this project, please visit the Business Building featured project page. |
More Details |
Service Tunnel between Business Admin and Arts and Science |
Concrete Cutting |
Estimated Start: 10/14/2013 |
Estimated End: 10/14/2013 |
Cutting of concrete floor to allow access to under ground pipe. |
More Details |
Lecture Center |
Rehabilitate Water Tower, Fountains & Main Fountain |
Estimated Start: 10/14/2013 |
Estimated End: 10/14/2013 |
The contractors will be testing the new fire alarm devices in the Lecture Center concourse on Monday, October 14th, between 6:00am and 7:00am. |
More Details |
PODIUM |
Podium Canopy Repair – Phase 2 |
Estimated Start: 10/15/2013 |
Estimated End: 10/15/2013 |
The concrete canopy on the south side Podium (between Humanities and Education buildings) will be in the process of small area repair. The additional two areas will be inspected. A high lift will be used in the area indicated on the attached plan. |
More Details | Map |
Indian Quad, Northwest & Northeast Corners of the Quad |
Mohawk Tower Rehabilitation |
Estimated Start: 10/01/2013 |
Estimated End: 10/01/2013 |
Water flow tests will be conducted at the northwest and northeast hydrant corners of Indian Quad. |
More Details |
CAMPUS CENTER/SCIENCE LIBRARY |
HYDRANT FLOW TESTING |
Estimated Start: 9/23/2013 |
Estimated End: 9/23/2013 |
Hydrant flow testing will occur this morning east of the Campus Center and adjacent to Parking Management. Increased water will flow on the ground and may cause some mud to occur to the east of the Campus Center and west of Parking Management trailer. Expected time frame is 8-11 a.m. Pedestrian traffic may be diverted due to increased water on the ground. |
More Details |
Business Administration |
Asbestos Removal in BA 340, 364, 364-A, 364-B & 364-C |
Estimated Start: 9/25/2013 |
Estimated End: 9/30/2013 |
Asbestos floor tile and mastic will be removed from BA 340, 364, 364-A, 364-B & 364-C. During the abatement, there will be no access to these spaces. There may be some citrus odor associated with the removal. |
More Details |
Campus Center |
Emergency Lighting Repairs/Upgrades |
Estimated Start: 9/11/2013 |
Estimated End: 9/11/2013 |
Removal of old emergency lighting inverter will require a temporary loss of some stairwell and hallway lighting. There will not be a total loss of lighting in any area. |
More Details |
University Hall |
Elevator Repair |
Estimated Start: 9/05/2013 |
Estimated End: 9/05/2013 |
The elevator in University Hall will be out of service for the day on Thursday, September 5, 2013. The tile floor will be replaced at this time. |
More Details |
Purple Path, Washington Avenue Entrance and State Drive |
Site Improvements, Purple Path and Indian Pond |
Estimated Start: 9/05/2013 |
Estimated End: 9/28/2013 |
There will be some minor construction work on the Purple Path from Collins Circle to State Drive. The Path will remain open. There will be some curb adjustments made on State Drive and access will be maintained. There will be some sidewalk work at the Collins Circle/Washington Avenue entrance. Sidewalks will remain open. See attached map. |
More Details | Map |
Colonial Quad |
Parking Interruption |
Estimated Start: 8/23/2013 |
Estimated End: 8/25/2013 |
NO PARKING during student move in – Colonial Drive – roadways will be for vehicles dropping off and passing through. |
More Details |
Indian Quad |
Parking Interruption |
Estimated Start: 8/22/2013 |
Estimated End: 8/23/2013 |
NO PARKING during student move in – Indian Drive, Chemistry Lane and Life Sciences Lane – roadways will be for vehicles dropping off and passing through. |
More Details |
Campus Center |
Hydrant Flow Tests |
Estimated Start: 8/09/2013 |
Estimated End: 8/09/2013 |
Contractor will be conducting hydrant flow tests in several locations around the Campus Center. This may affect pedestrian and vehicular traffic flow for brief periods of time. |
More Details |
Indian Quad – Mohawk Tower Renovation |
Temporary Road Closure at Indian Quad |
Estimated Start: 7/15/2013 |
Estimated End: 8/16/2013 |
Due to complicated underground utilities as well as coordination with the utility provider, the road closure will continue until August 16. Through access will continue along Justice Drive to Indian Drive. Access will also be maintained to the Science Library loading dock and around the athletic track. We apologize for any inconvenience. |
More Details |
University Hall |
Yearly Power Shutdown/Generator Test |
Estimated Start: 8/08/2013 |
Estimated End: 8/08/2013 |
At approximately 7:00 am, on Thursday, August 8, power will be turned off to University Hall so the emergency generator can be tested. Once the generator is running, all loads that are supposed to be on emergency power will be verified that they operating properly. Then the building will be switched back to normal power. Anyone in their offices at this time will be without power and the elevator will not operate. The generator only provides power to systems deemed necessary in a true emergency. Normal power should be returned to the building by 8:00 am. |
More Details |
Campus Center Room B-52 |
Replacement of West Doors |
Estimated Start: 8/05/2013 |
Estimated End: 8/09/2013 |
The replacement of two glass doors going into CC B-52 from the west (CC kitchen side) will take place. This will require the closing of two of the four doorways on this side. |
More Details |
Lecture Center Sub-basement Suites 018 and 026 |
Asbestos Abatement |
Estimated Start: 8/01/2013 |
Estimated End: 8/09/2013 |
Asbestos floor tile and mastic will be removed from Lecture Center sub-basement rooms 18, 18-A, 18-B, 026, 026-A, 026-B and 026-C. During the removal, there will be no access to these spaces. There may be low citrus odors associated with the removal. Ventilation ducts will be run in the hallway and exhausted into a vacant space. Noise will be minimal. |
More Details |
SEFCU ARENA |
POWER OUTAGE |
Estimated Start: 8/04/2013 |
Estimated End: 8/04/2013 |
Building power will be shut down for repair and maintenance of the P-2 high voltage switch. All electrical systems will be shut down including lighting, HVAC, elevator and card access. Shut off office computers as a precaution. |
More Details |
Athletic Fields Repairs & Improvements – Alert 05 |
Multi-use Stadium Site Work at SEFCU Parking Lot |
Estimated Start: 8/05/2013 |
Estimated End: 8/09/2013 |
Starting Monday, August 5, the entry drive to the SEFCU Parking Lot will be closed to both vehicular and pedestrian traffic through Tuesday, August 6 (weather dependent). No parking in the SEFCU lot will be allowed at that time. There will be no access to the SEFCU along the east side pedestrian path through Friday, August 9. Directional signage will be provided as necessary. Refer to the attached map for the extent work around the project site. Additional alert notifications will be issued as needed throughout the project’s construction. |
More Details | Map |
Uptown Residential Quads – Dutch, Indian, State and Colonial |
Power Shutdown |
Estimated Start: 8/03/2013 |
Estimated End: 8/04/2013 |
Power Quality Improvement Upgrades and Switchgear Maintenance are scheduled for the Uptown
Residential Quads: Dutch, Colonial, State & Indian. During the weekend of August 3 and 4, each of
these residential facilities will experience a power outage (approximately 8 hours – one at a time)
affecting all electrical systems within the Quad: including, but not limited to, all lighting, HVAC,
elevators and kitchens. Scheduled Power Outages will be as follows:
|
More Details |
University Police Department |
Parking Lot Repair |
Estimated Start: 7/25/2013 |
Estimated End: 7/26/2013 |
The University Police Department’s parking lot will be cleaned, have cracks repaired, seal coated and re-striped. |
More Details |
Indian Quad |
Repair of Visitor Lot II |
Estimated Start: 7/25/2013 |
Estimated End: 7/26/2013 |
The visitor lot II in Indian Quad will be cleaned, have cracks repaired, seal coated and re-striped. |
More Details |
SEFCU Arena |
Building Power Shutdown |
Estimated Start: 7/20/2013 |
Estimated End: 7/20/2013 |
During routine maintenance, it was discovered that the High Voltage switching mechanism located in the SEFCU Arena requires immediate repair and attention. The building will be without power on Saturday, July 20 from 7:00 am until 11:00 am. |
More Details |
Campus Wide |
Elevator Reduction |
Estimated Start: 7/18/2013 |
Estimated End: 7/19/2013 |
Due to the electrical use reduction request, one elevator in every building which houses more than one elevator will be taken out of service beginning today, July 18, 2013 through tomorrow, July 19, 2013. |
More Details |
PE, INDIAN, and SEFCU ARENA |
Water Main Break |
Estimated Start: 7/15/2013 |
Estimated End: 7/15/2013 |
Emergency water main break has occurred. Expect service to return by 5 pm today. |
More Details |
Indian Quad |
Parking Lot Repairs |
Estimated Start: 7/12/2013 |
Estimated End: 7/14/2013 |
Indian Quad student and visitor parking lots – Cleaning / pothole filling / crack filling. |
More Details |
Indian Quad – Mohawk Tower Renovation |
Temporary Road Closure at Indian Quad |
Estimated Start: 7/15/2013 |
Estimated End: 8/04/2013 |
The roadway south of Indian Quad and the Indian Quad loading dock will be closed to all traffic for utility work associated with Mohawk Tower. Through access will be maintained along Justice Drive to Indian Drive. Access will also be maintained to the Science Library loading dock and around the athletic track. |
More Details | Map |
University Hall |
Elevator Shutdown |
Estimated Start: 7/09/2013 |
Estimated End: 7/12/2013 |
Due to water infiltration from the rain storm on July 9, the building elevator is out of service. It is expected to be completely dried and returned to service by Friday, July 12. |
More Details |
Livingston Tower |
Livingston Tower Exterior Rehab, Phase 1 |
Estimated Start: 6/26/2013 |
Estimated End: 8/16/2013 |
Repair exterior concrete damage. Work day hours are from 6 am to 2:30 pm, Monday through Friday. |
More Details | Staging Plan |
Business Administration |
Elevator Out Of Service |
Estimated Start: 6/24/2013 |
Estimated End: T.B.D. |
The elevator in the Business Administration building will be shut down today and return to service upon completion. |
More Details |
Physics Rooms 312 & 327 |
Asbestos Abatement |
Estimated Start: 6/27/2013 |
Estimated End: 7/12/2013 |
As part of the classroom/lab renovations, asbestos floor tile and mastic will be removed from Physics 312 & 327. During the work period, there will be an area clearly marked with tape that goes from the 3rd floor to the basement exit. This path is used by the asbestos workers when active abatements are underway. There may be minimal odors associated with the removal. |
More Details |
Science Library |
Elevator Shutdown |
Estimated Start: 6/17/2013 |
Estimated End: 6/19/2013 |
The Science Library elevator experienced substantial flooding over the weekend causing it to be shutdown for a period to be repaired and dried out. |
More Details |
Indian Quad |
Mohawk Tower Rehabilitation, Emergency Generator Site Work |
Estimated Start: 6/10/2013 |
Estimated End: 6/16/2013 |
Relocate existing water line; install 3 electrical manholes; install electrical duct bank connection. |
More Details | Map |
Business Administration |
Elevator Out Of Service |
Estimated Start: 6/6/2013 |
Estimated End: Unknown |
The elevator has developed a hydraulic fluid leak and the technician will be working to locate and
repair the problem as soon as possible. At this time completion time is unknown |
More Details |
Campus Center |
B-52 West Door Replacement |
Estimated Start: 6/26/2013 |
Estimated End: 6/28/2013 |
Replacement of the four doors going into CC B-52* from the west side. *(CC kitchen side) |
More Details |
New School of Business |
Cleaning and CCTV Storm Drains |
Estimated Start: 5/30/2013 |
Estimated End: 5/31/2013 |
Arold Construction Company will clean and video various storm and sanitary lines located at the southwest corner of the new School of Business off of Carillon Drive West. |
More Details |
Biology Lobby |
Asbestos Abatement of Floor Tile & Mastic |
Estimated Start: 5/29/2013 |
Estimated End: 6/05/2013 |
Approximately 40 sq. ft. of asbestos floor tile and mastic will be removed from the Biology 1st floor main lobby. During this time there will be no access into the lobby. Red asbestos tape will outline the work zone. Access to Biology Office 148 and classroom 152 will not be affected. There may be minimal odors associated with the removal. |
More Details |
University Library |
Asbestos Abatement in Sub Basement MER |
Estimated Start: 5/22/2013 |
Estimated End: 6/7/2013 |
Asbestos caulk/sealant will be removed from air handling equipment in the Library sub-basement mechanical equipment room to make way for upgraded equipment. During the removal process, one air handling unit at a time will be out of service until all three have been abated. |
More Details |
Campus Wide |
Annual Elevator Inspection and Testing |
Estimated Start: 5/21/2013 |
Estimated End: 6/3/2013 |
Annual elevator inspections will be performed on May 21, 2013 through May 27, 2013 for the podium. Testing will be performed starting May 28, 2013 and ending June 3, 2013 for State, Colonial, Dutch Quad towers, State dining hall, and Liberty Terrace. |
More Details |
State Drive Roadway |
Road Closure |
Estimated Start: 5/19/2013 |
Estimated End: 5/19/2013 |
Due to commencement ceremonies, State Drive roadway will be closed on Sunday, May 19 for parking and through traffic. This closure is for approximately 6 hours, 6:00am to 12:00pm. |
More Details |
PODIUM, DORMITORY QUADRANGLES, PHYSICAL EDUCATION, SEFCU ARENA AND SERVICE BUILDINGS |
Annual Power Plant Shutdown 2013 |
Estimated Start: 5/19/2013 |
Estimated End: 6/3/2013 |
The University’s community should expect minimal heating and air conditioning service during the above-mentioned period in the uptown campus buildings with the exception of areas serviced by local systems. Domestic hot water will not be available during this time except areas serviced by local systems, i.e…SEFCU Arena, Boor Sculpture Studio, Liberty, Freedom and select residence halls. |
More Details |
Campus Wide |
Annual Heating Plant Shutdown |
Estimated Start: 5/13/2013 |
Estimated End: 6/3/2013 |
Heating and domestic hot water will be secured for the duration of the shutdown period. Ventilation could be affected due to the work being done. |
More Details |
Campus Wide |
Annual Fire Hydrant Flushing and Testing |
Estimated Start: 5/20/2013 |
Estimated End: 6/21/2013 |
Inspection and testing of fire hydrants campus wide may cause lower water pressures and/or dirty water. |
More Details |
Podium |
Podium Canopy Repair |
Estimated Start: 5/20/2013 |
Estimated End: 8/23/2013 |
The concrete canopy and columns on the west side Academic Podium will be in the process of repair. A high lift will be used in the area indicated on the attached plan. |
More Details | Map |
Chemistry 331, 332, 333 & 333-A |
Asbestos Abatement |
Estimated Start: 5/09/2013 |
Estimated End: 5/16/2013 |
Asbestos floor tile, mastic and caulk/sealants will be removed from the above-mentioned rooms. During the process, there may be some odors associated with the removal. There will be a small decon attached to the room in the hallway with a dedicated pathway marked with caution tape from the 3rd floor hallway to the basement exit. The main decon will be staged outside of Chemistry on Center Drive East. |
More Details |
Athletic Fields Repairs & Improvements |
Track and Field Venue Construction Startup |
Estimated Start: 5/06/2013 |
Estimated End: 8/31/2013 |
The Athletic Fields Repairs and Improvements project continues with the final phase of the project.
The construction of the new track and field facility at the former University Field will begin on Monday,
May 6. Work includes a new nine-lane track surface, reconditioning of the natural turf infield for field events, and the installation of a hammer throw facility south of the existing softball field. The entire facility will be closed for the duration of the project. Additional alert notifications will be issued as needed throughout the project’s construction. See map for details regarding work zones. |
More Details | Map |
LSRB |
Fire Alarm Testing |
Estimated Start: 4/29/2013 |
Estimated End: 4/29/2013 |
The contractor working on the RNA Institute will be testing the fire alarm system again for approximately 3 hours on Monday morning, April 29 at approximately 7 a.m. The strobe lights and horns will be disabled for the basement and first floor and should only be heard on the second floor. Occupants do not have to evacuate the building during this testing. |
More Details |
Podium, Dormitory Quadrangles, Physical Education, SEFCU Arena, and Service Buildings |
Annual Power Plant Shutdown |
Estimated Start: 4/24/2013 |
Estimated End: 4/25/2013 |
The University's community should expect minimal heating and air conditioning service during the above-mentioned period in the uptown campus buildings with the exception of areas serviced by local systems. Domestic hot water will not be available during this time except areas serviced by local systems, i.e…SEFCU arena, Boor Sculpture Studio, Liberty, Freedom and select residence halls. |
More Details |
University Hall |
Elevator unavailable |
Estimated Start: 4/24/2013 |
Estimated End: 4/25/2013 |
Due to mechanical problems, this elevator will be out of service for the remainder of today, April 24, 2013 and a portion of tomorrow, April 25, 2013. |
More Details |
LSRB |
Fire Alarm Testing |
Estimated Start: 4/22/2013 |
Estimated End: 4/22/2013 |
Testing of the fire alarm system in the new RNA Institute will begin on Monday, April 22 at 7 am. Strobes and horns will be disabled on the basement and first floor levels only. The first test on the second floor will take several minutes. All testing thereafter will only last for several seconds. Occupants will NOT have to leave the building. The work is expected to take between 2-5 hours. |
More Details |
Off Campus |
Fuller Road Closure |
Estimated Start: 5/03/2013 |
Estimated End: 5/13/2013 |
Due to the continuing construction related to the new Fuller Road/Washington Avenue roundabout/overpass, the portion of Fuller Road between the Tricentennial Circle and the newly constructed Washington Avenue roundabout is scheduled to be closed beginning at 9:00 pm on the evening of Friday, May 3 and will remain closed until 7:00 am on the morning of Monday, May 13. |
More Details |
Eastman Tower |
Eastman Tower Exterior Rehabilitation, Mast Climber Installation |
Estimated Start: 4/10/2013 |
Estimated End: 5/17/2013 |
The University is replacing the windows and the sealant on Eastman Tower this summer 2013. In preparation for this work, a scaffolding system will need to be installed in advance of the replacement. This will involve the construction of a center support or mast and the attachment of a conveyor type platform on each exterior face of the building. In addition, a protective cover will be provided at the entry doors of the building. The installation will take a month and notice will be provided to occupants when construction outside occupant windows is involved. This work will be conducted from 9 am – 6 pm on weekdays and 10 am – 6 pm on Saturdays. |
More Details |
Fulton Hall Basement |
State Quad - Eastman Tower, Exterior Rehab |
Estimated Start: 3/25/2013 |
Estimated End: 3/29/2013 |
Installation of shoring for entry tunnel to State Quad will begin on March 25. The work will include installation of plywood enclosures for the protection of insulation of plumbing and HVAC equipment. |
More Details |
Visitor Parking Lots at Collins Circle |
Landscaping Remediation at Collins Circle Visitor Parking Lots |
Estimated Start: 3/20/2013 |
Estimated End: 4/16/2013 |
Landscaping remediation will occur at the Visitor Parking lots located on Collins Circle and the State
Quad Annex. Remediation will include the replacement of trees and ground cover. Pedestrian access will be maintained at all areas of work. Parking will remain in service at all areas of work. |
More Details |
Lecture Center / Campus Center / Main Fountain |
Rehabilitate Water Tower, Fountains & Main Fountain |
Estimated Start: 3/18/2013 |
Estimated End: 10/1/2013 |
The contractors will resume construction activities for the second phase of the project. They will begin the week of March 18th with the demolition work for the Lecture Center Curtin (window) wall replacement. Please refer to the Facilities Management featured project website for the remaining Project Schedule/Timelines: https://www.albany.edu/facilities/fp/ |
More Details |
Colonial and Indian Quads |
Water Shutdowns |
Estimated Start: 3/16/2013 |
Estimated End: 3/20/2013 |
Daily water shutdowns for water meter bypass installations on Colonial and Indian Quads. Daily shutdowns will be as listed below: March 16th 6:30 AM until 6:30 PM Colonial Zenger (H), Colonial Clinton (A) and Delancey (B) March 17th 6:30 AM until 6:30 PM Colonial Hamilton (C), Colonial Herkimer (D), Colonial Johnson (E) and Colonial Morris (F) March 18th 6:30 AM until 6:30 PM Colonial Paine (G), Indian Tuscarora (H) March 19th 6:30 AM until 6:30 PM Indian Seneca (G), Indian Oneida (E) and Indian Onondaga (F) March 20th 6:30 AM until 6:30 PM Indian Adirondack (A), Indian Cayuga (B), Indian Mahican (C) and Indian Montauk (D) |
More Details |
Chemistry |
Asbestos Abatement - Chemistry 320 & 321 |
Estimated Start: 3/15/2013 |
Estimated End: 3/22/2013 |
Asbestos floor tile and mastic will be removed from Chemistry rooms 320 and 321. There may be some odors associated with the removal during this time. A dedicated walkway will be in place from the 3rd floor to the basement west exit through the west side stairwell. This area will be clearly delineated with caution tape. |
More Details |
Athletic Fields Repairs & Improvements |
Electrical Work at New Recreation Field |
Estimated Start: 3/4/2013 |
Estimated End: 3/15/2013 |
The Athletic Fields Repairs and Improvements project continues with the installation of the new
Recreation Field sports lighting system. The Contractor will begin installing concrete bases in four
locations around the field. While most work will be confined to the perimeter areas of the turf field,
the field will remain closed during this two-week period due to the nature of this work. Notice – There should be no impact of access to and from the U-Kids facility at any time during this work, as the roadway will remain open. Additional alert notifications will be issued as needed throughout the project’s construction. |
More Details |
Humanities |
Hot Water System Leak |
Estimated Start: 2/20/2013 |
Estimated End: 2/22/2013 |
High temperature hot water leak on the Humanities domestic hot water tank needs repair. Work begins immediately and will continue until leak is fixed. Anticipated duration of hot water shut down for the Humanities building should be no more than three days (dependent upon final scheduling of the work with Troy Boiler). |
More Details |
SEFCU Lobby Entrance |
Removal of Recessed Walk Off Mat & Installation of New |
Estimated Start: 2/25/2013 |
Estimated End: 2/27/2013 |
The existing recessed entry mat will be replaced with new. The work will be done over three days and at all times at least one set of entry doors will be open for access and egress. |
More Details |
Dutch Quad - Beverwyck and Schuyler Halls |
Emergency Hot Water Shut Down |
Estimated Start: 2/5/2013 |
Estimated End: 2/5/2013 |
There will be an emergency shut down of the Domestic Hot Water to Dutch Quad’s Beverwyck and Schuyler Halls at midnight on February 5 and will be reactivated between 4 am and 6 am on February 5 to make repairs to a leak located in the mechanical room. |
More Details |
Biology |
Water Shutdown |
Estimated Start: 1/14/2013 |
Estimated End: 1/14/2013 |
Building Water Shutdown for Lab Renovations (date changed from 1/16/13 to 1/14/13 at building manager’s request). |
More Details |
University Library |
Pressure Wash |
Estimated Start: 1/9/2013 |
Estimated End: 1/10/2013 |
Pressure wash glass area under the stairwell (EOP). |
More Details |
State Quad: Melville and Steinmetz Halls |
Water Meter Installation |
Estimated Start: 1/15/2013 |
Estimated End: 1/15/2013 |
All water will be shut down to both Melville and Steinmetz Halls for the installation of a water meter. During this time, there will be no domestic water in either building. |
More Details |
SS, HUM, ED, CHEM, PHYS, ES, FA, and LC West |
Elevator Repairs |
Estimated Start: 1/17/2013 |
Estimated End: 1/23/2013 |
Contractor will be making repairs to the elevator car ceilings. Each elevator will be out of service for
approximately one hour. All elevators will be available for handicap service if needed. These elevators are located in Social Science, Humanities, Education, Chemistry, Physics, Earth Science, Fine Arts, and Lecture Center West buildings. |
More Details |
Lecture Center |
Restroom Renovations |
Estimated Start: 12/26/2012 |
Estimated End: 1/23/2013 |
Minor repairs and modifications to the Lecture Center sub-basement north and south side rest rooms. Restrooms may be out of service for various periods of time as workers perform renovations. Please be advised that alternate restrooms are available. |
More Details |
Lecture Center |
Water Service Outage Building Wide |
Estimated Start: 1/3/2013 |
Estimated End: 1/3/2013 |
There will be a shutdown of the domestic water system to the Lecture Center building on Thursday, January 3
from 7:00 am to 12:00 pm in order to replace the existing water service valves. All of the buildings’ domestic water systems will be shut off, including water service to rest rooms, sinks and drinking fountains. |
More Details |
Campus Wide |
Annual Kitchen Exhaust Hood Cleanings and Hood Suppression Systems Testing and Cleaning |
Estimated Start: 12/26/2012 |
Estimated End: 1/18/2013 |
Contractors will be on site performing required semi-annual maintenance on kitchen exhaust and fire suppression systems. Fire alarms will be tested during this process. Prior to activation, an announcement will be made to building occupants advising them of the alarm. |
More Details |
University Hall |
Switchgear Fuse Replacement |
Estimated Start: 12/21/2012 |
Estimated End: 12/21/2012 |
The temporary fuse to restore power to UHALL will be replaced along with the 2 other fuses that protect the 120 volt power distribution panel. A two-hour window has been provided in case unforeseen issues arise. Lighting, heat and the elevator will remain operating during this period. The only effect will be on 120 volt distribution system. Nothing plugged into the wall will operate during this period, including computers. All computers should be shut down properly the night before to prevent any issues. The Business Building temporary power feed from UHALL will be off during this period as well. |
More Details |
Physics Building |
2nd Floor Hallway Asbestos Abatement |
Estimated Start: 12/20/2012 |
Estimated End: 12/31/2012 |
Abscope Environmental will be performing an asbestos removal project in Physics 2nd floor hallway. Asbestos floor tile and mastic will be removed. During the abatement process there will be a de-con trailer staged outside of the Physics building. There will be no access to the second floor. |
More Details |
Physics Building |
3rd Floor Hallway Ceiling Replacement |
Estimated Start: 12/21/2012 |
Estimated End: 1/31/2013 |
The Physical Plant will be replacing the ceiling in the 3rd floor hallway of the Physics Building beginning Friday, December 21 at 7 am and continuing until approximately Thursday, January 31. This will involve the removal and replacement of the ceiling tiles, suspension grid, HVAC registers, lighting, etc. This hallway will be accessible while work is being performed with only limited restrictions as specific construction details require. Academic and administrative functions performed on this floor can continue throughout the work period with only minor disturbance as a result of the construction. |
More Details |
Physics Building |
2nd Floor Hallway Floor Replacement |
Estimated Start: 12/20/2012 |
Estimated End: 1/23/2013 |
The Physical Plant will be replacing the hallway floor on the 2nd floor of the Physics Building beginning Thursday, December 20 at 7 pm and continuing through to approximately Friday, January 25. During this period, there will be a complete shutdown with no access to the second floor between 12/20/12 and 1/11/13 while abatement is performed, the subfloor sanded and leveled, and new tiles are laid. Between 1/11/13 and 1/23/13 limited access will be restored while the finish work is being performed. |
More Details |
Campus Center East |
Elevator Mechanical Repair |
Estimated Start: 12/10/2012 |
Estimated End: 12/10/2012 |
The Otis Elevator Company will install bevel projection shields inside the elevator shaft to meet elevator code. |
More Details |
Podium |
Renovation of Landscape Planters on Academic Podium |
Estimated Start: 11/30/2012 |
Estimated End: 12/31/2012 |
Phase One – Facilities will be renovating the 10’ x 10’ landscape planters. Work will include tree removal, soil removal, inspect and repair concrete structure and reassembly of planter. The use of construction equipment will be required which will impact pedestrian traffic patterns. |
More Details |
Service Tunnel - BA & A&S Building Areas |
New Business School Building - Alert #24 Service Tunnel Closure - No Thru Access |
Estimated Start: 12/3/2012 |
Estimated End: 12/5/2012 |
There will be NO THRU ACCESS in the service tunnel between the Business Administration Building
and Computing Center. See the attached drawing for the extents of the tunnel closure. This closure is required to perform construction tasks associated with construction of the Business School Building. For more details regarding this project, please visit: https://www.albany.edu/facilities/fp/newbusiness.html |
More Details | Map |
Earth Science |
Elevator |
Estimated Start: 11/26/2012 |
Estimated End: Until further notice |
Earth Science elevator is malfunctioning. |
More Details |
Lecture Center SB 39 & 41 |
Gender Neutral Restrooms |
Estimated Start: 11/20/2012 |
Estimated End: 12/20/2012 |
Renovation of 2 existing Podium restrooms to 2 unisex (gender neutral) restrooms – bathrooms will be unavailable intermittently during the scheduled period of work; when restrooms are offline, signs will be posted and individuals will need to find alternate bathroom locations. |
More Details |
Uptown Podium, Quad Dining Halls, SEFCU Arena, Physical Education, University Hall, and Life Science |
End of Cooling Season for 2012 |
Estimated Start: 11/19/2012 |
Estimated End: 4/15/2012 |
The central chilled water plant will be shut down for the season on November 19, 2012. The above listed areas will not have air conditioning from the central plant until the chilled water plant comes back on line tentatively scheduled for mid-April 2013. |
More Details |
Service Tunnel - BA & A&S Building Areas |
New Business School Building - Alert #23 Service Tunnel Closure - No Thru Access |
Estimated Start: 11/5/2012 |
Estimated End: 11/8/2012 |
There will be NO THRU ACCESS in the service tunnel between the Business Administration Building
and Computing Center during the above-mentioned period. See the attached drawing for the extents of the tunnel closure. This closure is required to perform construction tasks associated with construction of the Business School Building. For more details regarding this project, please visit: https://www.albany.edu/facilities/fp/newbusiness.html |
More Details | Map |
Off Campus |
Fuller Road Closure Change |
Estimated Start: 11/9/2012 |
Estimated End: 11/12/2012 |
There has been a change in the proposed shutdown of the eastbound lanes of Washington Avenue. The original dates for this shutdown were stated as being from November 2, 2012 to November 5, 2012 but this is now incorrect and the shutdown has been postponed one week. Due to the construction of the new Fuller Road/Washington Avenue roundabout/overpass, the eastbound lanes of Washington Avenue east of the entrance to Crossgates Mall and west of the I-90 exit 2 ramp will now be closed from 9:00 pm on Friday, November 9 until 7 am on Monday, November 12 to all traffic except emergency vehicles. The westbound Washington Avenue lanes and both the north and southbound Fuller Road lanes will all remain open during this period. |
More Details |
SEFCU Arena Parking Lot & Athletics Gravel Strip Lot |
Temporary Closure |
Estimated Start: 10/31/2012 |
Estimated End: 11/1/2012 |
Be advised that beginning on Wednesday October 31, 2012 at 9:00 PM the SEFCU Arena main parking lot and the Athletics gravel strip lot will be closed to all vehicles until after 11:00 PM on Thursday November 1, 2012. This is to accommodate reserved parking for guests attending the Citizen Laureate Dinner at SEFCU Arena. |
More Details |
U-Kids Day Care Center |
Roadway Repair |
Estimated Start: 10/26/2012 |
Estimated End: 10/26/2012 |
Roadway repair at the U-Kids Day Care Center will involve repairs to the existing speed bumps. This will require a temporary road closure between the Dutch Quad dock entrance and the intersection at the south east corner of Dutch Quad. |
More Details |
Lecture Center |
Water Service Outage Building Wide |
Estimated Start: 10/27/2012 |
Estimated End: 10/27/2012 |
There will be a shutdown of the domestic water system to the Lecture Center building on Saturday, October 27
from 6:00 am to 6:00 pm in order to replace the existing water service valves. All of the domestic water systems in the building will be shut off, including water service to rest rooms, sinks and drinking fountains. |
More Details |
Service Tunnel - BA & A&S Building Areas |
New Business School Building - Alert #22 Service Tunnel Closure - No Thru Access |
Estimated Start: 10/23/2012 |
Estimated End: 10/23/2012 |
There will be NO THRU ACCESS in the service tunnel between the Business Administration Building
and Computing Center during the above listed time. See the attached drawing for the extents of the tunnel closure. This closure is required to perform construction tasks associated with construction of the Business School Building. For more details regarding this project, please visit: https://www.albany.edu/facilities/fp/newbusiness.html |
More Details | Map |
Off Campus |
Fuller Road Closure |
Estimated Start: 11/2/2012 |
Estimated End: 11/5/2012 |
Due to the construction of the new Fuller Road/Washington Avenue roundabout/overpass, the eastbound lanes of Washington Avenue east of the entrance to Crossgates Mall and west of the I-90 exit 2 ramp will be closed from 9:00 pm on Friday, November 2 to 7 am on Monday, November 5 to all traffic except emergency vehicles. The westbound Washington Avenue lanes and both the north and southbound Fuller Road lanes will all remain open during this period. |
More Details |
Indian Drive and East Road of Indian Quad |
Campus Roadway Resurfacing and Repairs |
Estimated Start: 10/26/2012 |
Estimated End: 10/29/2012 |
Resurfacing and repairing Indian Drive scheduled work will start at University Drive East and end at
the service dock entrance of Indian Quad at Justice Drive. Please note that this work will involve the closing of that portion of Indian Drive and East Road of Indian Quad. Parking along the North side of Indian Quad, on Indian Drive will continue to be open. Please use Center Drive East for access. Please view area maps attached. |
More Details | Map 1 | Map 2 |
Lecture Center / Main Fountain |
Rehabilitate Water Tower, Fountains & Main Fountain |
Estimated Start: 10/18/2012 |
Estimated End: 10/24/2012 |
The contractor needs to demolish the main fountain southern stairs. This work is scheduled to begin
Thursday, October 18 and continue through Wednesday, October 24. During the work week, the
demolition activities will start at 4:00 am and end at 8:00 am. Work will continue on Saturday,
October 20 from 7:00 am until 4:00 pm. Additional exiting will be provided via temporary egress/exit stairs prior to the demolition of the stairs. Refer to the attached map labeled “Exiting Post Stair Installation” for pedestrian flow and exiting. |
More Details | Map |
Academic Podium Deck Behind Chemistry & Physics |
Asbestos Removal |
Estimated Start: 10/15/2012 |
Estimated End: 10/31/2012 |
Asbestos roof membrane will be removed from the podium deck behind Chemistry and Physics. There will be a roll-off set adjacent to the ground level podium south east stairwell which will be cordoned off and covered. Actual asbestos removals will be done at night and completed by 7:00 am each day until project completion. |
More Details |
Off Campus |
Fuller Road Closure |
Estimated Start: 10/19/2012 |
Estimated End: 10/22/2012 |
Due to the construction of the new Fuller Road/Washington Avenue roundabout/overpass, the westbound lanes of Washington Avenue west of the I-90 exit 2 ramp will be closed from 9:00 pm on Friday, October 19 to 7 am on Monday, October 22 to all traffic except emergency vehicles. The eastbound Washington Avenue lanes and both the north and southbound Fuller Road lanes will remain open during this period. |
More Details |
Center Drive East at Campus Center |
Obstructed Walkway Access |
Estimated Start: 09/26/2012 |
Estimated End: 09/28/2012 |
Excavation of the fire hydrant located adjacent to the walkway entrance at Center Drive East will require obstructed access to the walkway. Pedestrians should use caution in the area. |
More Details |
Physical Education |
Water Shutdown |
Estimated Start: 09/26/2012 |
Estimated End: 09/26/2012 |
The water in the Physical Education Women’s Locker Room will be shut down for valve replacement in the Restroom and Shower area. |
More Details |
Campus Entrance Closures |
Site Improvements, Purple Path and Indian Pond |
Estimated Start: 09/17/2012 |
Estimated End: 09/18/2012 |
The Washington Ave main/center entrance and the Western Ave. campus entrance will be closed on Monday September 17 through Tuesday September 18, 2012 for pavement resurfacing. Traffic for the main/center entrance on Washington Ave will be detoured to the two alternative entrances on Washington Ave, east and west of the main entrance. The traffic for the Western Ave. entrance will be detoured to Fuller Road and then to Great Dane Drive or Tri-Centennial Drive. Detour signs will be in place for direction. Please see the attached map for the detour routes. |
More Details | Map |
State Drive Detour |
Site Improvements |
Estimated Start: 09/17/2012 |
Estimated End: 09/21/2012 |
The intersection of State Drive and University Drive is to be reconstructed and will require a portion of State Drive to be closed from University Drive to the State Quad Purple parking lot entrance. Access to State Drive and the State Quad Purple parking lot will be detoured to Carillon Drive. A portion of Carillon Drive from University Drive to the parking lot exit will be converted to two-way traffic. Traffic to State Drive and the State Quad parking lot will be detoured to Carillon Drive with signs. See attached map for detour route. |
More Details | Map |
Performing Arts Center |
Theater/Lighting Repairs |
Estimated Start: 09/14/2012 |
Estimated End: 09/14/2012 |
The contractor for the Performing Arts Center Theater/Lighting Repairs project will be removing scaffolding equipment from the Performing Arts Center and loading the scaffolding onto a truck located at the front of the Podium (center entrance). The contractor may cone off a couple of parking spaces to facilitate the loading of the truck. |
More Details |
State Quad Parking Lot Entrance |
Site Improvements |
Estimated Start: 09/10/2012 |
Estimated End: 09/10/2012 |
The north access to the State Quad parking lot from University Drive will be closed for utility installation. Vehicles are directed to use the east access. See attached map. |
More Details | Map |
Biology B-22, B-22A, & B-23 |
Asbestos Abatement |
Estimated Start: 09/12/2012 |
Estimated End: 10/25/2012 |
Asbestos floor tile, mastic and asbestos fittings will be removed from these spaces in Biology. During the abatement period there will be some odors and minimal noise. The prep work will be done during the day and actual asbestos removals will occur in the evenings. |
More Details |
Fuller Road Roundabout |
Signage Installation |
Estimated Start: 08/30/2012 |
Estimated End: 08/30/2012 |
The installation of a Campus Identifier Sign will occur on the NE corner of the roundabout at Fuller Road and Tricentennial Drive this Thursday, August 30. The west bound lane of Tricentennial Drive from the campus perimeter road to the roundabout will be closed from 6 a.m. to approximately noon. West bound traffic will be diverted to Great Dane Drive during this time. |
More Details |
Washington Avenue Sign |
Fuller Road Closure |
Estimated Start: 08/27/2012 |
Estimated End: 08/28/2012 |
In order to relocate the power pedestal for the installation of new sidewalks, the Washington Avenue message sign has been turned off. |
More Details |
Off Campus |
Fuller Road Closure |
Estimated Start: 09/04/2012 |
Estimated End: 09/24/2012 |
Due to the construction of the new Fuller Road/Washington Avenue roundabout/overpass, Fuller Road north of Washington Avenue and south of the I-90 westbound exit 2 roundabout will be closed for a period of three weeks from 6 am on Tuesday, September 4 to 7 am on Monday, September 24 to all traffic except emergency vehicles. |
More Details |
Uptown Campus |
Potential Water Discoloration |
Estimated Start: 08/22/2012 |
Estimated End: 08/22/2012 |
The College of Nanoscale Science and Engineering has had a water main fail. They will be opening a bypass valve to utilize main campus water. This may cause some water discoloration on campus. |
More Details |
Life Sciences Building |
RNA Institute |
Estimated Start: 08/20/2012 |
Estimated End: 08/08/2014 |
Completion of the 2nd Floor Shell Space at LSRB is to commence on Monday, August 20. The RNA Institute project will involve construction of the research lab as well as a heat recovery system for the entire building. The lab is estimated for completion in May 2013 and the heat recovery system is estimated to be completed in stages for another heating/cooling season thereafter. The staging area is on the NE corner of the front lawn (see map) as well as the island between the driveway and Carillon Drive East. |
More Details | Map |
Washington Avenue East Access |
Washington Avenue Bus Stop |
Estimated Start: 08/14/2012 |
Estimated End: 08/23/2012 |
Construction of a concrete pad and sidewalks for a CDTA bus shelter on Washington Avenue located at the intersection with the Washington Avenue East access will be taking place. This bus stop replaces the bus stops located along the Washington Avenue main campus entrance and the Washington Avenue East access. |
More Details |
South Side of University Library |
Concrete Roofing |
Estimated Start: 08/14/2012 |
Estimated End: 08/28/2012 |
Remove and replace concrete and roofing. |
More Details |
Performing Arts Center |
PAC 2nd Floor South Hallway |
Estimated Start: 08/14/2012 |
Estimated End: 08/15/2012 |
Installation of vinyl tile in the PAC’s 2nd floor south hallway will take place during the above listed dates. |
More Details |
State Quad |
State Quad Recreation Fields, Sidewalks |
Estimated Start: 08/10/2012 |
Estimated End: 11/26/2012 |
The project includes reconstruction of an existing softball field as well as creating a new multipurpose recreation field. Project construction activities will consist primarily of site grading, selective tree removal, utility adjustments, new equipment storage shed, sod, irrigation, a new softball field backstop, sidewalks and Purple Path phase 4 with new lighting. |
More Details |
Western Avenue Sign |
Site Improvements, Purple Path and Indian Pond |
Estimated Start: 08/09/2012 |
Estimated End: 08/14/2012 |
The Western Avenue sign has been turned off in order to relocate the transformer for the installation of new sidewalks as part of the improvements to the Western Avenue entrance. |
More Details |
Health Sciences Campus Entrance |
CDTA Bus Shelter Relocation |
Estimated Start: 08/07/2012 |
Estimated End: 08/10/2012 |
There will be intermittent traffic control for entering and exiting the Washington Avenue Health Sciences Campus entrance during the installation of a new CDTA bus shelter and paved sidewalk. |
More Details |
State Quad Parking Lot North Access |
Site Improvements, Purple Path and Indian Pond |
Estimated Start: 08/15/2012 |
Estimated End: 10/01/2012 |
This alert addresses work areas associated with the New Business School Building project for Fall
2012 for the period starting on August 15, 2012 and ending on October 1, 2012. See the attached map for extents of the work areas. The attached map also identifies the staging area required for the water tower renovation project. Both projects are shown to identify pedestrian and vehicular routing. Minimal utility interruptions are anticipated. Work at the Business School Building will continue after the 10/1/12 date shown, however, the work area fencing will be reconfigured. For more details regarding this project, please visit: https://www.albany.edu/facilities/fp/newbusiness.html |
More Details | Map |
Chemistry, Parking Management |
Limited Power Outage |
Estimated Start: 08/06/2012 |
Estimated End: 08/06/2012 |
There will be a brief limited power outage shutdown of the Chemistry building on Monday, August 6 from 6:00 am
to 7:30 am. This limited electrical shutdown will affect power panels that sever the following areas: • Chemistry 219 lab • Ion Beam lab (B-62) • Hazmat storage shed • Parking Management building • Visitor Parking booth Staff should turn off all equipment (i.e. computers, printers, etc.) prior to the power outage. |
More Details |
State Quad Parking Lot North Access |
Site Improvements, Purple Path and Indian Pond |
Estimated Start: 08/07/2012 |
Estimated End: 08/10/2012 |
The north access from University Drive East to the State Quad parking lot will be closed for installation of utilities. See attached map for work area. |
More Details | Map |
Performing Arts Center |
Asbestos Removal 2nd floor South Hallway |
Estimated Start: 08/06/2012 |
Estimated End: 08/12/2012 |
Asbestos floor tile and mastic will be removed from the Performing Arts center 2nd floor south side hallway. Upon completion of the abatement, new floor tile will be installed. The abatement will take place between 8/6/12 and conclude by 8/12/12. There will be no access to any offices in this area during the abatement period. |
More Details |
Lecture Center |
Power Outage Building Wide |
Estimated Start: 08/04/2012 |
Estimated End: 08/05/2012 |
There will be a building-wide power outage shutdown of the Lecture Center building starting on Saturday, August 4 at 6:00 am and ending on Sunday, August 5 at 3:00 pm. All of the building’s electrical systems will be shut off. Any equipment that uses power will not be operational, such as computers, lights, fans, refrigerators, vending machines, elevators, etc. There will not be any cooling or ventilation during the shutdown. Staff will not be allowed to enter or occupy the building during the shutdown timeframe. Staff in the Lecture Center should turn off all office equipment (i.e. computers, printers, etc.) prior to the weekend of the power outage. |
More Details |
Physics Room 225 & 225 |
Asbestos Abatement |
Estimated Start: 07/24/2012 |
Estimated End: 08/10/2012 |
Asbestos floor tile, mastic and asbestos fittings will be removed from Physics 223 & 225. During the abatement period, there will be a pathway outlined with red tape that identifies the asbestos workers’ path from the decon trailer outside up to the rooms on the 2nd floor. There may be slight odors associated with the removal. The removal of asbestos will occur between 5:00 PM and 1:00 AM. |
More Details |
University Hall |
New Business School Building - Natural Gas Tie-In |
Estimated Start: 07/24/2012 |
Estimated End: 07/24/2012 |
This alert addresses a Natural Gas tie-in to service the New School of Business Building. The Tie-in
will occur at the Northwest campus entrance from Washington Avenue, near University Drive west. Natural gas service will be disrupted for one hour. |
More Details |
Campus Center Extension |
Soil Borings |
Estimated Start: 07/17/2012 |
Estimated End: 07/23/2012 |
Soil borings will be performed at the exterior of the existing Campus Center Extension on the east and west sides of the building. |
More Details |
Lecture Center |
Power Outage Building Wide |
Estimated Start: 07/28/2012 |
Estimated End: 07/28/2012 |
There will be a building wide power outage shutdown of the Lecture Center building on Saturday, July 28th from 6:00am to 6:00pm. All of the buildings electrical systems will be shutoff. Any equipment that uses power will not be operational, such as computers, lights, fans, refrigerators, vending machines, elevators, etc. There will not be any cooling or ventilation during the shutdown. Staff will not be allowed enter or occupy the building during the shutdown timeframes. Staff in the Lecture Center should turn off all office equipment (i.e. computers, printers, etc.) prior to the weekend of the power outage. Please note: There will be another building wide power outage shutdown of the Lecture Center building on Saturday, August 4th and Sunday, August 5. A separate Facilities Alert will be issued for this shutdown. |
More Details |
Physics |
Basement Level Door Replacement |
Estimated Start: 07/17/2012 |
Estimated End: 07/18/2012 |
Replacement of Exterior Doors Basement Level. |
More Details |
Performing Arts Center |
Theatre/Lighting Repairs |
Estimated Start: 07/03/2012 |
Estimated End: 09/14/2012 |
Project to replace and repair theatre and theatre lighting systems in the Main Theatre, Studio Theatre, and Recital Hall. Work to include connection of new house lighting controls to building fire alarm system. |
More Details |
Physical Education and Dutch Quad South |
Campus Roadway Resurfacing and Repairs |
Estimated Start: 07/09/2012 |
Estimated End: 07/13/2012 |
Roadway resurfacing at the Physical Education bus circle starting at University Drive through the bus
circle and encompassing the small adjacent parking lot and continuing to the southeast corner of
Dutch Quad will begin July 9. The small PE parking lot will be closed. The VIP parking lot will remain open. Resurfacing of the Dutch Dock area includes the dock area and roadway from the dock entrance to the bus entrance at the Science Library. There will be alternating traffic patterns. |
More Details | Dutch Dock Map | Dutch Bike Room Map | U-Kids Roadway Map | PE Area Map |
CAMPUS WIDE |
FIRE HYDRANT TESTING |
Estimated Start: 07/02/2012 |
Estimated End: 08/31/2012 |
Testing / maintenance of fire hydrants. During such testing, water may become discolored or low water pressure may occur. |
More Details |
PE Track Area |
Post Pipe Lining Inspection |
Estimated Start: 07/02/2012 |
Estimated End: 07/02/2012 |
Cured In Place Piping (CIPP) Post lining CCTV inspection of 8” sanitary line located at the athletic track area. |
More Details |
Physical Education and Dutch Quad South |
Campus Roadway Resurfacing and Repairs |
Estimated Start: 07/09/2012 |
Estimated End: 07/13/2012 |
Roadway resurfacing at the Physical Education bus circle will include the roadway from University
Drive to the southeast corner of Dutch Quad. The small Physical Education parking lot will be closed. Resurfacing of the Dutch dock area will include the entrance of Dutch dock southeast to the Science Library entrance including the driveway to the Dutch bike room. There will be alternating traffic patterns. |
More Details |
Dutch Quad Tower |
Elevator Repair Services to Stuyvesant Tower |
Estimated Start: 07/02/2012 |
Estimated End: 07/03/2012 |
There will be no elevator access to the Dutch Quad’s Stuyvesant Tower floors via elevator. Elevator #1 will be out of service at this time so that the elevator ropes can be replaced. Elevator #2 will also be out of service in order to complete the repairs to the #1 car. Elevator #3 will have doors repaired. |
More Details |
Education |
Education Basement Level East Entrance Doors |
Estimated Start: 06/26/2012 |
Estimated End: 06/27/2012 |
Replacement of exterior doors, basement level. |
More Details |
Chemistry |
Chemistry Basement Level West Entrance Doors |
Estimated Start: 06/28/2012 |
Estimated End: 06/29/2012 |
Replacement of exterior doors, basement level. |
More Details |
Indian Quad |
Seneca Hall Renovation |
Estimated Start: 07/07/2012 |
Estimated End: 07/07/2012 |
As the Seneca Hall Renovation concludes on Saturday, July 7 at 7am, we will be shutting off the power to all the buildings on Indian Quad to clean the main electrical equipment that serves the quad. Power will be shut off for approximately 4 hours. |
More Details |
Select Podium Buildings and Dormitory Quadrangles |
NYS Mandated - Energy Cutback Emergency |
Estimated Start: 06/21/2012 |
Estimated End: 06/21/2012 |
The University's community should expect minimal air conditioning service during the above mentioned period while cooling may not be available in the uptown campus buildings. This does not include areas serviced by local systems and critical needs. Please contact the Power Plant at 442-3444 for any emergency concerns. |
More Details |
Podium |
Podium Canopy Repair – Phase 2 |
Estimated Start: 06/26/2012 |
Estimated End: 06/28/2012 |
During the week of June 26 to June 28, the concrete canopy and columns on the west side of the Academic Podium will be inspected. A high lift will be used in the area indicated on the attached plan. |
More Details | Map |
Athletic Fields Repairs & Improvements |
Electrical Work / Temporary Road Closure / Asbestos Abatement |
Estimated Start: 07/02/2012 |
Estimated End: 07/03/2012 |
The Athletic Fields Repairs and Improvements project continues with work to provide electrical power
from Dutch Quad to the new Recreation Field lighting system. The Contractor will begin work laying
underground conduit from the sub-basement Mechanical Room of Dutch Quad across the roadway
near U-Kids to the new field. Additionally, minor asbestos glue removal work will be confined to the
sub-basement Mechanical Room ceiling prior to the new installation. Notice – Starting Monday, July 2 through July 3, no traffic will be allowed along a portion of the UKids road during the installation of the conduits. There should be no impact of access to and from the U-Kids facility at anytime during this work. Refer to the map for the extent of the project work. Additional alert notifications will be issued throughout the project’s construction. |
More Details | Map |
State Quad |
Eastman Tower Exterior Restoration Phase 1 |
Estimated Start: 06/22/2012 |
Estimated End: 08/17/2012 |
Project will include removal and replacement of sealant and concrete repair to the exterior of the building. There will be swing scaffold installed on the tower to accommodate repairs and a covered scaffold to gain access to the tower. |
More Details | Map |
Various Locations |
Site Improvements, Purple Path and Indian Pond |
Estimated Start: 06/27/2012 |
Estimated End: 09/28/2012 |
The project includes new curbing and landscaping improvements to the Washington Avenue main entrance and Western Avenue entrance, construction of sections 2A, 3A & 3B of the Purple Path at Collins Circle and State Quad parking lot perimeter, and pathway and landscape improvements around Indian Pond. The north section of State Quad parking lot will be closed during construction and there will be temporary parking space closures along the east section of State Quad parking lot for tree removal. See attached map for work areas. |
More Details | Map of Work Areas |
Science Library Bus Circle, Dutch Quad Parking Lot and U-Kids Roadway |
Underground Pipe Renovations |
Estimated Start: 06/19/2012 |
Estimated End: 06/22/2012 |
Cured In Place Pipe operation. Continuation of Project P-0021. Reline failing sanitary and storm
drains throughout the campus. Upgrade drainage to increase flow rate and reduce water backups.
This operation will incur temporary road closures in the areas of: Faculty/Staff Lot R north entrance,
roadway between Dutch loading dock to southeast corner of Dutch Quad and pedestrian traffic at the
Science Library bus circle. Work Schedule: 6/19/12 PE track and Science Library bus circle 6/20/12 Dutch Faculty / Staff parking lot ‘R’ north entrance 6/21/12 Road closure from Dutch dock entrance to southeast corner of Dutch Quad |
More Details |
Physical Education Athletic Track |
Site Utility Repairs |
Estimated Start: 06/18/2012 |
Estimated End: 06/19/2012 |
Relining of sanitary and storm drains located on the inside track area will take place. |
More Details |
Lecture Center / Campus Center / Main Fountain |
Rehabilitate Water Tower, Fountains & Main Fountain |
Estimated Start: 06/15/2012 |
Estimated End: 11/01/2012 |
The contractor for the project requires additional staging in order to perform concrete pumping construction activities. Concrete will be pumped from the staging area to the main fountain plaza. The staging is located in parking spaces north of the Earth Science building. Refer to the attached map for the specific location of the staging. |
More Details | Staging Map |
Fuller Road & Tri-Centennial Drive Roundabout |
New Signage Installation |
Estimated Start: 06/18/2012 |
Estimated End: 07/20/2012 |
New monumental signs will be installed at the new Roundabout, one on the NE corner and one on the SW corner. The west bound lane of Tri-Centennial Drive will be closed on several occasions. Traffic will be diverted to Great Dane Drive. East bound lane on Tri-Centennial coming from CESTM will be flagged and re-routed into one lane on several occasions. Any lane closures will be for short periods of time and will be managed by a flag person. |
More Details |
Social Science |
Asbestos Removal in Social Science, Rooms 308, 310, 312 & 314 |
Estimated Start: 06/26/2012 |
Estimated End: 07/10/2012 |
Asbestos floor tile and mastic will be removed from Social Science rooms 308, 310, 312 & 314. During the project, there may be odors and minimal noise. The decon trailer will be staged just off of the Carillon Drive West roadway near the northwest corner of the academic podium. One half of the stairway on the north side of Social Science from the 1st floor to the 3rd floor will be blocked off with barricade tape to identify the asbestos workers’ path to and from the worksite. |
More Details |
Humanities |
Asbestos Removal |
Estimated Start: 06/13/2012 |
Estimated End: 06/13/2012 |
The exterior doors on the east side basement podium entrance of Humanities will be removed on June 13, 2012 and new doors installed upon completion of the abatement work. The abatement will start and finish the same day, June 13, 2012, by 8:00 AM. Also at this time, the Humanities west side basement level exterior doors will be replaced. No abatement is required at that location. It will take 2- 3 days to complete the installation of the new doors. |
More Details |
Chemistry |
Asbestos Removal Chemistry 147, 147-A, 148 & 150 |
Estimated Start: 06/14/2012 |
Estimated End: 06/29/2012 |
Asbestos floor tile, mastic, caulk and sealants will be removed from the Chemistry labs noted above. During this period, there will be no access to the space and there may be some odors associated with the removals. The asbestos trailer will be located on Center Drive East as close to the building as possible. Parking will not be impacted. |
More Details |
Campus Center |
Elevator Out of Service |
Estimated Start: 06/05/2012 |
Estimated End: 06/15/2012 |
Campus Center west elevator (across from Wendy’s) will be out of service due to the replacement of a faulty part. |
More Details |
Education |
2nd & 3rd Floor Hallway Asbestos Removal |
Estimated Start: 06/04/2012 |
Estimated End: 06/22/2012 |
Asbestos floor tile and mastic will be removed from the 2nd and 3rd floor hallways of Education. Work will begin on the west side of the 2nd & 3rd floor hallways June 4, 2012 and will be done by June 12, 2012. At this time, the west side hallways will reopen and the east side 2nd & 3rd floor hallways will be closed from June 12, 2012 until June 22, 2012. During this time frame, the restrooms on the 2nd & 3rd floor will be closed and the elevator to the 2nd & 3rd floor will not be accessible. There will be minimal noise and odors associated with the abatement. The decon trailer will be staged outside of Education on Center Drive West. |
More Details |
University Hall |
New Business School Building - Alert #19 / UHall North Vehicle Access |
Estimated Start: 06/01/2012 |
Estimated End: 08/15/2012 |
This alert addresses Vehicle access and parking located immediately north of University Hall. Vehicle parking located at the immediate north of UHall will no longer be available due to work associated with the New Business School Building. All existing parking located at the immediate north of UHall will be relocated and signed on the south side of UHall. All existing handicapped parking spaces on Carillon Drive East will remain. See attached map for the extents of work areas and parking areas available at Carillon Drive East. Minimal utility interruptions are anticipated. For more details regarding this project, please visit the New Business School's Featured Project page. |
More Details | Map |
LSRB, Science Library and Husted |
Annual Elevator Testing |
Estimated Start: 06/04/2012 |
Estimated End: 06/06/2012 |
Proper operation and maintenance of elevator systems require periodic load testing. This
comprehensive testing makes it necessary to have elevators taken out of service during this time.
All elevators listed below will be interrupted of service for inspections and testing according to the
following schedule:
|
More Details |
Collins Circle |
Temporary Road Closure |
Estimated Start: 05/19/2012 |
Estimated End: 05/20/2012 |
On Saturday night, May 19, 2012, Collins Circle roadway will be closed temporarily during the torchnight
fireworks ceremony which will occur between 9:00 PM and 9:30 PM. On Sunday morning, May 20, 2012, the Collins Circle roadway will be closed to all traffic during the commencement ceremony beginning at approximately 9:45 AM until 1:00 PM. |
More Details |
Dutch Quad |
Replace Roofs: Ten Eyck, Bleeker and Van Cortlandt |
Estimated Start: 05/21/2012 |
Estimated End: 08/10/2012 |
Project will replace these 3 roofs along with the sky lights and exhaust fans. |
More Details |
Podium, Dormitory Quadrangles, Physical Education, SEFCU Arena and Service Buildings |
ANNUAL POWER PLANT SHUTDOWN 2012 |
Estimated Start: 05/20/2012 |
Estimated End: 06/03/2012 |
The University's community should expect minimal heating and air conditioning service during the above mentioned period in the uptown campus buildings excluding areas serviced by local systems. Domestic hot water will not be available during this time. |
More Details |
Colonial Quad & State Quad |
New Business School Building - Alert #18 / Summer 2012 work areas |
Estimated Start: 06/01/2012 |
Estimated End: 08/15/2012 |
This alert addresses work areas associated with the New Business School Building project for
summer 2012. See attached map for extents of the work areas. The attached map also identifies the staging area required for the water tower renovation project. Both projects are shown to identify pedestrian and vehicular routing. Minimal utility interruptions are anticipated. Work at the Business School Building will continue after the 8/15/12 date shown, however the work area fencing will be reconfigured. Note: The new bus shelter at Collins Circle west will be in service on 6/1/12. The existing bus shelter at Collins Circle will be removed from service. For more details regarding this project, please visit the New Business School's Featured Project page. |
More Details | Work Area Map |
Lecture Center / Campus Center / Main Fountain |
Rehabilitate Water Tower, Fountains & Main Fountain |
Estimated Start: 05/01/2012 |
Estimated End: 05/09/2012 |
The contractor is continuing with construction of the lecture center concourse construction barrier wall. The barrier wall is nearing completion and the contractor needs to modify the exterior barricades to the existing southern stairs. This is so the preparation work for the temporary egress stairs can begin. The changes to exterior barricades will occur Tuesday night, May 1. Refer to the attached map labeled “Exiting During Stair Installation” for pedestrian flow and exiting. |
More Details | Exiting During Stair Installation |
Chemistry and Humanities Buildings |
Replace Roofing on Chemistry and Humanities Buildings – On the Podium |
Estimated Start: 05/21/2012 |
Estimated End: 09/30/2012 |
During this summer the roofs on the Chemistry and Humanities buildings will be renovated. The existing ballast roof will be replaced with EPDM single-ply membrane roofing system. |
More Details |
Dutch Tower |
Elevator Maintenance |
Estimated Start: 04/30/2012 |
Estimated End: 05/11/2012 |
Dutch Tower elevator pit work will be done. There will be scraping and painting of elevator frames and pit floor with alternating ‘out of service cars’. |
More Details |
Podium |
Podium Canopy Repair – Phase 2 |
Estimated Start: 05/21/2012 |
Estimated End: 05/28/2012 |
During the week of May 21 to May 28, the concrete canopy and columns on the west side of the Academic Podium will be inspected. A high lift will be used in the area indicated on the attached plan. |
More Details | Map |
Lecture Centers |
Power Outage |
Estimated Start: 05/23/2012 |
Estimated End: 05/23/2012 |
Lecture Center power outage required for 3000 amp breaker upgrade. Area impact includes all LC’S and sub basement areas. Power should be restored by 9am on May 23, 2012. |
More Details |
Campus Center and Extension |
Power Outage Building Wide |
Estimated Start: 05/22/2012 |
Estimated End: 05/22/2012 |
Building wide power outage required for 3000 amp breaker upgrade. Power should be restored by 9am on May 22, 2012. |
More Details |
Lecture Center / Campus Center / Main Fountain |
Rehabilitate Water Tower, Fountains & Main Fountain |
Estimated Start: 04/18/2012 |
Estimated End: 05/09/2012 |
The contractor will begin the lecture center concourse construction barrier wall starting Wednesday night, April 18th. Construction of the barrier wall will occur between 10:00pm and 6:00am. The main fountain plaza area will be restricted to contractor access only with the exception of the southern stairs. |
More Details | Map |
Liberty Terrace |
Justice Drive Road Work & Temporary Closure |
Estimated Start: 04/23/2012 |
Estimated End: 04/25/2012 |
Catch basin repair work will occur on Monday and Tuesday, with flagmen on site to allow through traffic. On Wednesday, Justice Drive will be closed for milling and asphalt work, from University Drive East to the UPD parking lot. |
More Details | Map |
Podium |
Podium Canopy Repair – Phase 2 |
Estimated Start: 05/01/2012 |
Estimated End: 05/03/2012 |
The project starts inspection of the underside of the concrete canopy beginning with the column on the Academic Podium. |
More Details |
Social Science Podium |
Social Science Podium Deck Asbestos Abatement |
Estimated Start: 04/09/2012 |
Estimated End: 04/18/2012 |
Asbestos roof matting will be removed from the Social Science Podium deck on the west side of the building directly above the loading docks. There will be a detour to use another entrance while work is being performed above pedestrian entrances. |
More Details |
Lecture Center / Campus Center / Main Fountain |
Rehabilitate Water Tower, Fountains & Main Fountain |
Estimated Start: 04/09/2012 |
Estimated End: 10/07/2013 |
The contractor will begin to mobilize his equipment, start setting up fencing, staging areas and erecting scaffolding up the entire length of the water tower. Scaffolding will start the week of April 16. Noisy work will not start until after commencement. Refer to the attached map for the extent of the project sites. Additional alerts will be issued throughout the project’s construction. |
More Details | Map |
Athletic Fields Repairs & Improvements – Alert 01 |
Project Start – Construction Staging Areas |
Estimated Start: 04/04/2012 |
Estimated End: 09/30/2013 |
The Athletic Field Repairs and Improvements project begins with work on two of the three project
venues – Recreation Field (adjacent to tennis courts) and the Multi-Purpose Stadium (southeast of
SEFCU Arena). Contractor will begin work staging the project sites which will include fencing;
locating project trailers and installing temporary pathways around the project site. Notice – Starting Wednesday, April 04 no parking is allowed in the first two rows of the SEFCU lot west of the access drive. See attached graphic Refer to the attached map for the extent of the project sites. Additional alert notifications will be issued throughout the project’s construction. |
More Details | Map |
State & Colonial Quads |
Railing Installation |
Estimated Start: 04/09/2012 |
Estimated End: 04/13/2012 |
Contractor will be installing permanent barrier railing above the cafeteria garden area in State and Colonial Quads. |
More Details |
Social Science |
Social Science Basement Level Entrance Doors South End |
Estimated Start: 04/03/2012 |
Estimated End: 04/04/2012 |
Replacement of the Entrance Doors - Social Science Basement Level (South Side - Humanities Side). |
More Details |
Physical Education Building |
Cleaning of Sanitary and Storm Drains |
Estimated Start: 03/19/2012 |
Estimated End: 03/30/2012 |
Cleaning storm and sanitary drain lines on the north side of the Physical Education Building continues. |
More Details |
Science Library (East/West Entrances) |
Pressure Wash |
Estimated Start: 03/14/2012 |
Estimated End: 03/16/2012 |
Both East and West entrances to the Science Library will be pressure washed. |
More Details |
Biology |
Asbestos Abatement in Biology B-032 |
Estimated Start: 03/15/2012 |
Estimated End: 03/22/2012 |
Asbestos floor tile and mastic will be removed from Biology B-032 and the adjacent hallway. During this removal, there will be no access to Biology AC-1 or Biology Lab B-031during the abatement period. |
More Details |
Uptown Campus |
Eastman Tower |
Estimated Start: 03/09/2012 |
Estimated End: 03/18/2012 |
Survey exterior of Eastman, Stuyvesant, Mohawk and Livingston Towers for structural damage and leakage. Survey will require hydraulic scaffolding on all four sides of each building. Provide design drawings as necessary. Bid and administer subsequent projects as necessary. |
More Details |
Uptown Campus |
Physical Education Building |
Estimated Start: 03/05/2012 |
Estimated End: 03/14/2012 |
Continuation of cleaning sanitary and storm drains, north of the Physical Education Building. |
More Details |
Uptown Campus |
Humanities Building |
Estimated Start: 03/12/2012 |
Estimated End: 03/14/2012 |
Final renovation work for the elevator in the Humanities building will take place. Contractor will
modify the elevator hydraulic piston and install new guide rail rollers. Specific schedule as follows:
|
More Details |
Uptown Campus |
SEFCU Arena |
Estimated Start: 02/29/2012 |
Estimated End: 03/07/2012 |
There will be jetting, cleaning, and video taping of storm drains at the site of the new stadium, east of the SEFCU arena. |
More Details |
Uptown Campus |
Estimated Start: 02/21/2012 |
Estimated End: 02/21/2012 |
OGS has a water main leak that needs emergency repair. There may be a need to purge faucets after 5 pm. |
More Details |
Power Plant and SBA |
Road Block |
Estimated Start: 02/17/2012 |
Estimated End: 02/17/2012 |
A crane will be blocking the roadway in between Power Plant (SBB) and SBA. This is in order to remove a large cooling tower condenser pump for overhaul. |
More Details |
Building 25 |
Water Shutdown |
Estimated Start: 02/11/2012 |
Estimated End: 02/11/2012 |
All the water will be shut off in Building 25 to allow for a removal of a sink and supply lines in room 113. |
More Details |
Performing Arts Center |
Asbestos Abatement in Classrooms 263 & 355 |
Estimated Start: 02/15/2012 |
Estimated End: 02/24/2012 |
Asbestos floor tiles and mastic will be removed from the floor and glue pucks removed from behind the glass chalkboards. There will be a citrus odor associated with the removal. Access to these spaces will be prohibited. |
More Details |
Seneca Hall, Indian Quad |
Seneca Hall Rehabilitation |
Estimated Start: 01/09/2012 |
Estimated End: 07/13/2012 |
This Seneca Hall project is a complete renovation. |
More Details |
Biology |
Asbestos Removal - Biology Rooms 155, 156 & 157 |
Estimated Start: 01/09/2012 |
Estimated End: 01/16/2012 |
Asbestos floor tile and mastic will be removed from these rooms. There may be a citrus odor associated with the removal. |
More Details |
Service Building A |
Service Buildings Renovations Project |
Estimated Start: 1/03/2012 |
Estimated End: 10/01/2012 |
Alumni Drive and the SBA parking lot will be closed due to the renovation project. Temporary road closing signage will be installed by the contractor. |
More Details |
Physics Tunnel |
Abatement |
Estimated Start: 12/19/2011 |
Estimated End: 12/22/2011 |
In conjunction with Class Labs Phase III renovation work, abatement will take place in Physics Tunnel beginning December 19 and proceeding through the day. The bulk of the work will be done during normal business hours and there will be changes to access and egress during those times. There will be no access through this area until air monitoring has been cleared. There will be evidence of wood and plastic enclosures at the room entrances and an occasional orange citrus odor associated with cleansers. |
More Details |
State Quad – Whitman Hall |
Water Meter Install |
Estimated Start: 12/20/2011 |
Estimated End: 12/20/2011 |
Water will be shut off at 7 am on Tuesday, December 20 in order to install two water meters. Water will be back on by 11 am. |
More Details |
Campus Wide |
Elevator Inspections |
Estimated Start: 12/19/2011 |
Estimated End: 1/13/2011 |
Annual elevator safety inspections and tests will be conducted. Each campus elevator will be out of service for 30 minutes. |
More Details |
Service Tunnel – Social Sciences to Arts & Sciences |
New Business School Building – Alert #17 / Chilled Water Line Replacement at Podium Service Tunnel |
Estimated Start: 12/18/2011 |
Estimated End: 1/17/2011 |
This alert addresses the replacement of the existing chilled water supply and return lines from the
Social Science loading dock area to the west end of the Arts & Sciences building. This replacement
will be limited to the podium service tunnel. No through access will be allowed from 10 pm to 6 am in this area of the service tunnel. Through access from 6 am to 10 pm will be allowed in this area of work. Brief access restrictions during these hours may occur. |
More Details |
Power Plant |
Roof Project |
Estimated Start: 12/14/2011 |
Estimated End: 12/14/2011 |
The south entrance from Perimeter Road into the Power Plant will be closed for the day on Wednesday, December 14 for a crane set up in the rear parking lot. The north entrance and the Fuller Road entrance will remain open. |
More Details |
Service Building A |
Service Buildings Renovations Project |
Estimated Start: 12/10/2011 |
Estimated End: 12/10/2011 |
University Drive West will have intermittent lane closures near Alumni Drive. Use caution in this area and watch for flagmen. |
More Details |
Dutch Quad Stuyvesant Tower |
Hot Water System Repairs |
Estimated Start: 12/20/2011 |
Estimated End: 12/20/2011 |
Stuyvesant Tower water will be shut down on December 20, 2011 from 7 am until approximately 2 pm to allow for valves in the hot water system to be replaced. |
More Details |
Business |
Pipe Repair |
Estimated Start: 12/08/2011 |
Estimated End: 12/08/2011 |
Repair leaking hot water pipe in hallway ceiling outside room Basement 0026. Public Restrooms will have no hot water during this repair. |
More Details |
Southeast Area of Campus |
New Student Housing Project – University Drive Road Work |
Estimated Start: 12/05/2011 |
Estimated End: 12/16/2011 |
University Drive will have intermittent lane closures near the southeastern turn. Use caution in this area and watch for flagmen. |
More Details |
Chemistry & Education |
Elevator Renovations, Phase 3 |
Estimated Start: 12/23/2011 |
Estimated End: 12/30/2011 |
Final renovation work for the elevators in Chemistry and Education. Contractor will install new
hydraulic lines to replace original buried lines. New lines to be run from elevator to elevator machine
room along basement ceiling in east staircases. Specific schedule as follows: Chemistry elevator: start Friday, December 23, complete Wednesday, December 28 Education elevator: start Wednesday, December 28, complete Friday, December 30 The elevator will not be available for service during the renovation period. Access from basement level of the east staircase to basement main corridor will be temporarily restricted during a portion of the renovation period while new hydraulic lines are run over the staircase to main corridor doorways. |
More Details |
Justice Drive |
Underground Pipe Renovations |
Estimated Start: 11/28/2011 |
Estimated End: 12/02/2011 |
A 36” storm sewer main that runs from Justice Drive along the east side of the softball field will be rehabilitated using a process called Cured in Place Pipe. In order to avoid any interruption of service to the area, above ground piping that is well marked with traffic cones will be utilized. The work will create very little disruption, greatly improve flow rates and reduce the likelihood of future pipe failures. |
More Details |
Dutch Quad Ten Eyck |
Hot Water Valve Installation |
Estimated Start: 11/23/2011 |
Estimated End: 11/23/2011 |
The hot water will be shut down in Ten Eyck Building at 11 am on November 23 for a valve replacement; it will be restored by 3 pm on the same day. |
More Details |
Chemistry Building |
Classroom Renovations |
Estimated Start: 11/18/2011 |
Estimated End: 11/18/2011 |
Steam system to the entire building will be shut down in order to install a new disconnect valve to serve Chemistry 145 & 146. This is anticipated to take less than 3 hours. |
More Details |
Eastman Tower |
Emergency Pipe Repair |
Estimated Start: 11/18/2011 |
Estimated End: 11/18/2011 |
Project will involve replacing valves and expansion joint in hot water 2 ½ inch supply pipe in chase on the seventh floor of Eastman Tower. This repair may affect the hot water to the entire tower or only the 01 and 02 suites from the 1st floor to the 16th floor. |
More Details |
Academic Podium and near State Quad |
Rehab. of Water Tower and Fountains – Construction Sound Simulation Testing |
Estimated Start: 11/12/2011 |
Estimated End: 11/12/2011 |
Construction sound simulation testing will be performed on Saturday. See below table for the testing timeframes. It is asked that students and staff avoid the testing areas during these timeframes. |
More Details | Map |
Lecture Center Fountain |
End of Season Shutdown of the Lecture Center Fountain |
Estimated Start: 11/10/2011 |
Estimated End: |
The reflecting pool to the Lecture Center's fountain is being drain for the season. During this time, major renovation will be made to the fountain and water tower. |
More Details |
Campus Center 111A |
Wallcovering Installation |
Estimated Start: 11/01/2011 |
Estimated End: 11/04/2011 |
Contractor will install digital wallcovering in existing lounge area. |
More Details |
Colonial Quad |
New Business School Building - Alert #16 / natural gas line installation |
Estimated Start: 10/27/2011 |
Estimated End: 11/30/2011 |
This alert addresses installation of a new natural gas line to be installed on the north side of Colonial
Quad. No utility interruptions are anticipated. This installation is required for construction of the Business School Building. For more deatils regarding this project, please visit: https://www.albany.edu/facilities/fp/newbusiness.html |
More Details |
Academic Podium |
Campus Center Fountain Shutdown |
Estimated Start: 10/28/2011 |
Estimated End: 10/28/2011 |
The Campus Center Fountain will be shut down and drained for the season. A leaking supply line has been identified and the fountain must be drained in order to perform the necessary repairs. |
More Details |
Eastman Tower 01 and 02, Suites from Floors 6-15 |
Hot Water Shutdown |
Estimated Start: 10/26/2011 |
Estimated End: 10/26/2011 |
There will be a Hot Water Shutdown for 1 hour from 11am – 12pm tomorrow Wednesday, October 26, 2011. Plant department needs to replace a faulty hot water valve in the tower. This shutdown will only affect the 01 and 02 suites from floors 6 to 15 and will be approximately 1 hour in duration. There will still be cold water in the suites for the sink, shower and toilets. Please plan accordingly. We are sorry for the inconvenience and appreciate your cooperation during this time period. |
More Details |
Earth Science 03 |
Demolition/Construction |
Estimated Start: 10/24/2011 |
Estimated End: 12/31/2011 |
In conjunction with CEMHD renovation work, demolition and construction will take place in ES 03 and 01J beginning October 24 and proceeding through November 8. The bulk of the work will be done during normal business hours. |
More Details |
Earth Science 03 |
Abatement |
Estimated Start: 10/25/2011 |
Estimated End: 11/08/2011 |
In conjunction with CEMHD renovation work, abatement will take place in ES 03 and 01J beginning October 24 and proceeding through November 8. The bulk of the work will be done during normal business hours and there will be changes to access and egress during those times. There will be evidence of wood and plastic enclosures at the room entrances and an occasional orange citrus odor associated with cleansers. |
More Details |
Academic Podium Deck Between Fine Arts & College of Arts & Science |
Removal of Asbestos Roof Mat & Repair of Concrete Deck |
Estimated Start: 10/24/2011 |
Estimated End: 11/11/2011 |
Work to repair the podium deck on the north central stairway that leads to the main campus fountain will begin. The concrete will be removed and then an asbestos removal will take place. Upon completion of the abatement, the deck concrete will be replaced. During this period, the entire stairway will be closed to all pedestrian traffic. Alternate routes are available per the attached map. Signage will be in place to identify detour routes. |
More Details | Podium Work Map |
Chemistry 145 & Physics 229 |
Demolition Work |
Estimated Start: 10/21/2011 |
Estimated End: 12/30/2011 |
In conjunction with classroom renovation work, demolition and construction will take place in CH 145, 141A and PH 229, 228, 228A beginning October 21 and proceeding through December 30. |
More Details |
Chemistry 145 & Physics 229 |
Abatement Work |
Estimated Start: 10/24/2011 |
Estimated End: 11/03/2011 |
In conjunction with classroom renovation work, abatement will take place in CH 145, 141A and PH 229, 228, 228A beginning October 24 and proceeding through November 3. The bulk of the work will be done during off hours and there will be changes to access and egress during those times. There will be evidence of wood and plastic enclosures at the room entrances and an occasional orange citrus odor associated with cleansers. |
More Details |
Empire Commons |
Asphalt Sidewalk Repairs |
Estimated Start: 11/01/2011 |
Estimated End: 11/04/2011 |
Deteriorated sidewalks behind ‘F’ and ‘G’ Clusters will be milled, excavated and resurfaced. The appropriate signage and safety barricades will be in place. Pedestrians will be able to access the north parking lot by following the sidewalks along Excelsior Drive and Capital Hill. |
More Details |
State Quad |
State Drive Roadway Repairs |
Estimated Start: 10/14/2011 |
Estimated End: 10/14/2011 |
A small section of State Drive will be milled and overlaid with new asphalt. Traffic will be permitted through the area, but delays may incur. |
More Details |
New Business School Building – Alert #15 / Collins Circle |
Traffic Restriction |
Estimated Start: 10/04/2011 |
Estimated End: 10/07/2011 |
This alert addresses temporary traffic restrictions at Collins Circle. Traffic movement at Collins Circle will be restricted for short periods during the dates indicated above. All traffic at the circle will be stopped to allow for the delivery of the crane required to erect the new School of Business Building. We do not anticipate traffic movement to be suspended more than 5 minutes per delivery. This closure is required to perform construction tasks associated with construction of the Business School Building. For a more details regarding this project, please visit our Project Deatils page. |
More Details |
Campus Wide |
Manhole Repairs |
Estimated Start: 06/20/2011 |
Estimated End: 07/01/2011 |
Repairs will be made to selected manholes located in parking lots and roadways on the uptown campus. The work will include the replacement of missing blocks, cementitious repairs, resetting of framing grates and laying down new asphalt. Road signs, safety cones and flagmen will be utilized on all roadways. |
More Details |
Indian Quad/Power Plant |
Underground Pipe Renovations |
Estimated Start: 06/27/2011 |
Estimated End: 07/08/2011 |
Storm and sanitary sewer pipes located on the south side of Indian Quad and under the parking area on the west side of the Power Plant will be rehabilitated using a process called Cured in Place Pipe. In order to avoid any interruption of service to the areas, above ground bypass piping that is well marked with safety cones will be utilized. The work will create very little disruption, greatly improve flow rates and reduce the likelihood of future pipe failures. |
More Details |
Colonial Quad Commons Area |
New Business School Building - Alert #01 / Exterior Work Area - Rev #1 |
Estimated Start: 05/16/2011 |
Estimated End: 07/13/2011 |
Construction for the New Business School Building will begin on May 16, 2011. This project has a planned completion date of August 15, 2013. See attached map for extents of the work area. The attached map also indentifies the West Skylight Dome work area. Both projects are shown to identify pedestrian and vehicular routing. For a more details regarding this project, please visit our Project Deatils page. |
More Details | Map |
Lecture Center Rooms 11, 12 & 13 |
Remove Asbestos Floor Tile & Mastic |
Estimated Start: 06/22/2011 |
Estimated End: 07/08/2011 |
Floor tile and mastic will be removed from Lecture Center rooms 11, 12 and 13. During the course of the work, there will be a designated area outside of these rooms for the decon chambers. There may be some odors associated with the removal. |
More Details |
Social Science Building |
Social Science Photovoltaic System |
Estimated Start: 06/25/2011 |
Estimated End: 06/25/2011 |
The Social Science building will be without power on Saturday, June 25, starting at 8:00 am and will be restored no later than 2:00 pm that day. The building has to be deenergized in order to install a breaker in the main switch gear as part of the Social Science photovoltaic project scheduled later in the summer. |
More Details |
Colonial Quad |
Herkimer, Clinton, and Delancey Roof Replacement |
Estimated Start: 06/16/2011 |
Estimated End: 08/12/2011 |
Project will consist of removal of existing roof systems and install 3 new Black EPDM roofs. |
More Details |
Water Service Interruption - A & S, FA and UHall Buildings |
New Business School Building - Alert #04 / Water Service Interruption at Arts & Sciences, Fine Arts & UHall Buildings |
Estimated Start: 06/16/2011 |
Estimated End: 06/17/2011 |
There will be NO WATER SERVICE at Arts & Sciences, Fine Arts, and University Hall buildings from 9pm to 1am on the dates indicated above.
This closure is required to perform construction tasks associated with construction of the Business School Building.
For more details regarding this project, please visit: New Business School Featured Project Page |
More Details |
Physics Classroom 116 |
Asbestos Removal |
Estimated Start: 06/15/2011 |
Estimated End: 06/20/2011 |
Asbestos floor tile, mastic and glue pucks will be removed from Physics room 116. There will be some citrus odors associated with the removal. |
More Details |
Colonial Livingston Tower |
Fire Pump Replacement |
Estimated Start: 06/07/2011 |
Estimated End: 06/08/2011 |
The standpipe and sprinkler line for the tower will be shut down and drained for piping to be replaced. |
More Details |
Education Rooms 013, 013-A and 014 |
Removal of Asbestos Floor Tile & Mastic |
Estimated Start: 06/10/2011 |
Estimated End: 06/17/2011 |
Asbestos floor tile and mastic will be removed from Education basement rooms 013, 013-A and 014. Prep work will begin on June 10 with the abatement to begin on June 13 and end by June 17. There may be slight odors associated with the removal. |
More Details |
Dutch Quad Southeast Podium Deck |
Asbestos Removal |
Estimated Start: 06/13/2011 |
Estimated End: 06/16/2011 |
An asbestos roof membrane will be removed from the podium deck of Dutch Quad in the southeast corner between Van Cortlandt and Beverwyck Halls. During this period, there will be no access to this area. |
More Details |
Academic Podium |
Podium Skylight Domes - Alert #06 / East Dome Assembly |
Estimated Start: 06/06/2011 |
Estimated End: 06/31/2011 |
Work for the SkyDomes Project continues with the start of assembly of the east dome
structure at the Podium roof at the corner of Earth Science and Biology. Work includes:
|
More Details|Map |
Southeast Area of Campus |
New Student Housing Project - SEFCU Parking Lot CLOSURE |
Estimated Start: 06/05/2011 |
Estimated End: 06/06/2011 |
SEFCU Parking Lot will be closed for 24 hours as the site work is completed. No overnight parking will be permitted. |
More Details |
State Quad Eastman Tower Front Entrance |
Walk-Off Grid Installation |
Estimated Start: 06/01/2011 |
Estimated End: 06/15/2011 |
Eastman Tower front entrance will be closed from June 1, 2011 until June 15, 2011. Work will begin on the installation of an aluminum walk-off grid in the vestibule floor. This closure is required to assure that the framework and concrete remain undisturbed while curing. Residential Life access will be through the sunken garden. Other access will be through the tunnel to the basement. |
More Details |
Biology Rooms 152, 154 & Prep Room |
Asbestos Removal of Tile, Mastic and Glue Pucks |
Estimated Start: 06/01/2011 |
Estimated End: 06/13/2011 |
Asbestos floor tile, mastic and glue pucks will be removed from Biology 152, 154 and the prep room of 154. During the removal process, there will be slight odors and minimal noise. A secure decon will be erected in the hallway so asbestos removal personnel can access the work site. |
More Details |
Social Science Building |
Social Science Photovoltaic System |
Estimated Start: 06/11/2011 |
Estimated End: 06/11/2011 |
The Social Science building will be without power on Saturday, June 11, starting at 8:00am and will be restored no later than 2:00pm that day. The building has to be deenergized in order to install a breaker in the main switch gear as part of the Social Science photovoltaic project scheduled later in the summer. |
More Details |
University Police Building |
Fire Protection SystemTesting |
Estimated Start: 05/31/2011 |
Estimated End: 05/31/2011 |
Testing / maintenance of water-based fire protection system will take place. During such testing, audible alarm devices may activate briefly. Occupants will not have to evacuate during testing and will be informed when testing is complete. |
More Details |
Earth Sciences Building |
Replace Uptown Windows, Phase 1 2011 Door Replacements |
Estimated Start: 06/08/2011 |
Estimated End: 06/28/2011 |
Removal and replacement of the original exterior doors on the east and west sides of
the Earth Sciences Building is scheduled to begin on 6/8/11. This work is planned to
continue through 6/28/11. Building access will be maintained at all times. |
More Details |
Fine Arts Building |
Replace Uptown Windows, Phase 1 2011 Door Replacements |
Estimated Start: 06/01/2011 |
Estimated End: 06/21/2011 |
Removal and replacement of the original exterior doors on the east side of the Fine Arts
Building is scheduled to begin on 6/1/11. This work is planned to continue through
6/21/11. Building access will be maintained at all times. |
More Details |
Arts & Sciences Building |
Replace Uptown Windows, Phase 1 2011 A&S Door & Window Replacements |
Estimated Start: 05/23/2011 |
Estimated End: 06/16/2011 |
Removal and replacement of the original exterior doors on the east side of the Arts &
Sciences Building is scheduled to begin on 5/23/11. This work is planned to continue
through 6/16/11. Window replacement directly above these doors is also planned
during this time period. Building access will be maintained at all times. |
More Details |
Earth Science |
Asbestos Removal Basement East Vending Closet |
Estimated Start: 05/25/2011 |
Estimated End: 06/01/2011 |
Asbestos floor tile and mastic will be removed from the vending area located in the basement of Earth Science east end. Access through the hallway during the work period will not be disrupted. |
More Details |
Podium Stairs |
Podium Stairs Renovation Phase 3 |
Estimated Start: 05/16/2011 |
Estimated End: 10/24/2011 |
Work includes renovation of the Podium stairs between Earth Science and Fine Arts buildings. |
More Details |
Service Tunnel - BA & A&S Bldg Areas |
New Business School Building - Alert #03 / Service Tunnel Closure - No Thru Access |
Estimated Start: 05/16/2011 |
Estimated End: 06/01/2011 |
There will be NO THRU ACCESS in the service tunnel between the Business Administration Building and Computing Center. See the attached drawing for the extent of the tunnel closure.
This closure is required to perform construction tasks associated with construction of the Business School Building For more details regarding this project, please visit: New Business School Featured Project Page |
More Details  |Work Area Map |
State Drive Road Closure |
Collins Circle Parking & Sitework |
Estimated Start: 05/17/2011 |
Estimated End: 06/07/2011 |
State Drive will be closed from May 17, 2011 to June 7, 2011. Carillon Drive East will
serve as a two-way drive for access to UHall North and South parking areas. See the
attached sketch for traffic routes. This closure is needed to complete project related items for the new parking lot being constructed on the east side of State Quad. For more details regarding this project, please visit: New Business School Featured Project Page |
More Details  |Work Area Map |
Physical Education |
Asbestos Removal in 2nd Floor North/South Hallway |
Estimated Start: 05/16/2011 |
Estimated End: 05/31/2011 |
Asbestos tile and mastic will be removed from the second floor north/south hallways. Work will begin in the south hallway on May 16 and conclude by the end of business on Thursday, May 19. They will then move to the north hallway. Abatement work will be finished on or before May 25, 2011. The floor will be re-tiled and waxed with all work being done by 8:00 am, May 31, 2011. There will be a decon trailer parked at the base of the steps leading to the PE/SEFCU Arena. A dedicated walkway will lead from the trailer to the building entrance. This pathway will be outlined by red asbestos caution tape. |
More Details |
Southeast Area of Campus |
New Student Housing Project - University Drive & University Place Closure |
Estimated Start: 05/16/2011 |
Estimated End: 06/20/2011 |
University Drive will be closed from the Western Avenue entrance to the Indian Gold Parking Lot. University Place will also be closed. Pedestrian walkways along these roadways and around the pond will also be closed. |
More Details | Map |
Empire Commons |
Parking Lot Paving |
Estimated Start: 05/23/2011 |
Estimated End: 05/27/2011 |
The North and West Parking Lots at Empire Commons will be milled, new asphalt will be put down and markings will be painted to match the existing layout in each lot. Parking in any of the aforementioned areas after 12:01 AM on 5/20/2011 will be strictly prohibited and violators will be towed at the owner's expense with no exceptions. Parking will be available in the South Parking Lot as well as any Colonial Gold parking areas. |
More Details |
Commencement Parking Restrictions |
Estimated Start: 05/13/2011 |
Estimated End: 05/15/2011 |
The following parking restrictions will be in effect for Commencement weekend: Visitor Lot 1 Collins Circle - NO PARKING - Lot Closed (permanently) beginning Friday, May 13; Visitor Lots east & west Collins Circle - RESERVED for Marching Faculty ONLY on Sunday, May 15; State Purple Lot - RESERVED for Volunteer & Handicap parking on Sunday, May 15; Carillon Drive East & State Drive parking -RESERVED for Platform Party parking on Sunday, May 15; Carillon Drive West & Colonial Drive - NO PARKING- Saturday, May 14, 10 pm through Sunday, May 15, 10 pm. |
More Details |
Biology Room 343 |
Asbestos Removal |
Estimated Start: 05/02/2011 |
Estimated End: 05/05/2011 |
Asbestos floor tile and mastic will be removed from Biology Room 343. There will be a slight odor as a result of the removal process. The decon trailer will be located on ground level at the southeast corner of the podium. |
More Details |
Physics, Fine Arts |
Elevator Renovations, Phase 3 |
Estimated Start: 05/16/2011 |
Estimated End: 08/19/2011 |
Renovation of original Podium elevators will take place this summer as follows:
— Physics elevator: start Monday, May 16; complete Friday, July 1 — Fine Arts elevator: start Tuesday, July 5; complete Friday, August 19 The elevators will not be available for passenger service during the renovation period. |
More Details |
Colonial Quad Commons Area |
New Business School Building - Alert #01 / Exterior Work Area |
Estimated Start: 05/16/2011 |
Estimated End: 06/17/2011 |
Construction for the New Business School Building will begin on May 16, 2011. This project has a planned completion date of August 15, 2013. See attached map for extents of the work area. The attached map also indentifies the West Skylight Dome work area. Both projects are shown to identify pedestrian and vehicular routing. For a more details regarding this project, please visit our Project Deatils page. |
More Details | Map |
Southeast Area of Campus |
New Student Housing Project - Pedestrian Walkway Closures University Drive East (Perimeter Road) |
Estimated Start: 04/25/2011 |
Estimated End: 06/20/2011 |
University Drive East (Perimeter Road) pedestrian walkway will be closed from the baseball field to the Indian Gold parking lot. Additionally, the walkway from UAB and MSC will be closed. These areas will have significant construction activity and will be restricted to vehicular traffic only. |
More Details |
Grounds Building |
Service Buildings Renovations |
Estimated Start: 04/27/2011 |
Estimated End: 04/28/2011 |
Justice Drive, across from the Grounds Building , will be closed temporarily from Wednesday, April 27 through Thursday, April 28 to allow construction of the sanitary sewer replacement. Access to UPD and the Grounds Building will remain open during this timeframe. See attached map. |
More Details|Map |
Academic Podium |
Podium Skylight Domes - Alert #05 / West Dome Assembly |
Estimated Start: 04/25/2011 |
Estimated End: 06/17/2011 |
Work for the SkyDomes Project continues with the start of assembly of the west dome
structure at the Podium roof at the corner of Business Administration and Social
Science. Work includes:
|
More Details|Map |
Humanities |
Customer Service Center Relocation |
Estimated Start: 04/15/2011 |
Estimated End: Indefinite |
The Customer Service Center for Facilities Management will be moving from its current location in Social Science B12 to its new location in Humanities B43. This move will take place at the close of business (4:00pm) on Thursday, April 14th . Business will resume without interruption of our regular schedule at 7:00am on the morning of Friday, April 15 at our new location in Humanities B43. |
More Details |
Podium - Humanities and Education |
Rehabilitation of Light Wells - Phase 2 |
Estimated Start: 04/18/2011 |
Estimated End: 04/20/2011 |
On Monday, April 18 through Wednesday, April 20, contractors will be sealing intake air
ductwork that will require the temporary shutdown of the building air handling units in
the Humanities and Education buildings. Please note that the heating system will remain on during the work. |
More Details |
Great Dane Drive |
Pavement Repairs |
Estimated Start: 04/18/2011 |
Estimated End: 04/22/2011 |
Great Dane Drive will be milled down and new asphalt and pavement striping will be put down. The work will take two days to complete and will be contingent on weather. Traffic will be permitted through the work area during construction and appropriate signage and safety measures will be in place. University faculty and staff are encouraged to use one of the other access roads to the campus during construction. |
More Details |
Freedom Quad |
Emergency Power Shutdown |
Estimated Start: 04/07/2011 |
Estimated End: 04/07/2011 |
There will be an e mergency shut down of electrical powe r in all buildings at Freedom Quad this afternoon. Please turn off all sensitive electronic equipment prior to shutdown to avoid possible damage. |
More Details |
Building 25 (Old Health Center) |
Valve Replacements |
Estimated Start: 04/12/2011 |
Estimated End: 04/12/2011 |
The water system in Building 25 will be shut down during the replacement of shutoff valves on multiple toilets throughout the building. |
More Details |
Dutch Quad Schuyler |
Power Outage |
Estimated Start: 04/19/2011 |
Estimated End: 04/19/2011 |
There will be no power during the hours listed above on April 19 while the kitchen power panel circuit breaker at Schuyler is being replaced. |
More Details |
Athletic Fields |
Repairs and Improvements - Alert #01 / Site Survey |
Estimated Start: 04/01/2011 |
Estimated End: 04/15/2011 |
In preparation for this project, survey crews will be documenting existing site conditions in the areas outlined in the attached map. |
More Details | Map |
Dutch Quad |
Bike Room Stair Renovations |
Estimated Start: 04/13/2011 |
Estimated End: 06/17/2011 |
The scope of work will include repairs to the under structure of the staircase, re-pouring of all the stair treads, bike room roof repairs and resetting of concrete slabs that are adjacent to the top of the staircase at the podium level. Preliminary work will begin on 4/13/2011, but the staircase will remain open until 5/16/2011. Signage will be posted and safety barriers will be utilized throughout the project. |
More Details |
Academic Podium |
Podium Skylight Domes - Alert #04 / Center Dome Assembly |
Estimated Start: 04/01/2011 |
Estimated End: 04/29/2011 |
Work for the SkyDomes Project continues with the start of assembly of the center dome
structure at the Podium roof nearest the Entry Plaza. Work includes:
|
More Details |
Grounds Building |
Service Buildings Renovations |
Estimated Start: 03/21/2011 |
Estimated End: 11/15/2011 |
Contractors will be beginning work for the Service Building Renovation project the week of March 21st. The first phase of the project will occur at the Grounds building and the surrounding site. The contractors will mobilize next week and begin their site work towards the end of this month. Since this project is constrained to the grounds building area, it should have minimal impact to the greater campus community. |
More Details |
State Quad, Collins Circle, Colonial Quad |
Construct New Business School Parking & Sitework |
Estimated Start: 03/15/2011 |
Estimated End: 05/13/2011 |
Work at the above mentioned locations is scheduled to resume on March 15, 2011. State Quad East: A new parking lot will be constructed to the immediate east of State quad. Site utilities will also be replaced as part of this work. Fencing at this location will not be erected until March 21, 2011 Collins Circle: New parking lots have been constructed at the east and west lobes of Collins Circle. Spring work at these loactions will include the installation of final landscaping and irrigation, in addition to final paving, striping and finishing of sidewalks. A new bus shelter will be installed at the west lobe lot. The existing bus shelter located at the east lobe of Collins Circle will remain in service during this phase of work. Colonial Quad: Seeding and final grading will be installed at the east, north and west sides of the building. The Colonial Quad loading dock will receive pavement repair as a result of work associated with this project. For more details regarding this project, please visit our Featured Projects page |
More Details | Overview Map | State Map |
Campus Center |
Campus Center Entrance Hall Renovation |
Estimated Start: 03/10/2011 |
Estimated End: 03/11/2011 |
PCB Abatement will be done at the windows above the main entry doors at the Podium
level. Limited access will be available until about 1:00 AM, at which time the main entry will not be accessible until the work has been completed. |
More Details |
Campus Center/Physics |
Partial Stair Closure |
Estimated Start: 03/09/2011 |
Estimated End: 04/10/2011 |
The concrete stair treads of the exterior stairway leading from the podium to ground level between the Campus Center & the Physics are currently in an unsafe condition, and pose a possible tripping hazard. Half of this stairway will be closed off until repairs can be completed, weather permitting. |
More Details |
Alumni House/Empire Commons |
Scheduled Power Outage |
Estimated Start: 03/14/2011 |
Estimated End: 03/14/2011 |
National Grid will be performing routine maintenance to two transformers that serve Alumni House and Empire Commons. Power to Alumni House will be interrupted beginning at 8:00 AM and to Empire Commons beginning at 9:00 AM. Both locations will be without power for approximately 20 minutes. Card Reader access for Empire Commons and Alumni House will not be operational during the outage. If building access at Empire Commons is needed, please contact Residential Life to gain entry. Emergency monitoring systems will remain operational via battery backup. |
More Details |
Indian Quad — Mohawk Tower |
Water Shut Down |
Estimated Start: 02/24/2011 |
Estimated End: 02/24/2011 |
Water will be shut down in Mohawk Tower on Indian Quad on February 24 to replace a valve in 604 ceiling. |
More Details |
Southeast Area of Campus |
New Student Housing Project - Temporary Road Closure University Drive East (Perimeter Rd) between Justice Drive & University Place |
Estimated Start: 02/21/2011 |
Estimated End: 02/26/2011 |
University Drive East (Perimeter Road) and sidewalks will be closed between Justice Drive and University Place over Winter Break. Access via University Place will also be closed at this time. Detour signage will be in place for the duration. ** Also, on Saturday, February 19, expect intermittent lane closures. Flagmen will be directing traffic. ** |
More Details | Work Area Map |
Indian Quad — Mohawk Tower |
Water Shut Down |
Estimated Start: 02/24/2011 |
Estimated End: 02/24/2011 |
Water will be shut down in Mohawk Tower on Indian Quad on February 24 to replace a valve in 604 ceiling. |
More Details |
Campus Center |
Renovate Campus Center Entrance Hall - Fire Alarm Testing |
Estimated Start: 02/14/2011 |
Estimated End: 02/14/2011 |
Fire alarm strobes and horns will be tested as part of the work for the Campus Center Entrance Hall project. Testing involves activating alarm devices (audio and visual) for a short period of time. It is anticipated that the duration of the tests will be about 30 minutes from start to finish. |
More Details |
Chemistry |
Vacuum Pump Replacement Project - Water Shut Down |
Estimated Start: 02/22/2011 |
Estimated End: 02/22/2011 |
Chemistry building water will be shut down to allow for installation of a new water shutoff valve for the replacement of the buildings Vacuum System Pump. |
More Details |
Colonial Tower |
Hot Water Shut Down |
Estimated Start: 02/24/2011 |
Estimated End: 02/24/2011 |
Shutdown due to hot water leak. |
More Details |
Social Science Room 134 |
Asbestos Removal |
Estimated Start: 02/03/2011 |
Estimated End: 02/28/2011 |
Asbestos floor tile and mastic will be removed from Social Science room 134. Additionally, removal of asbestos sealant/caulk from 2 mixing boxes located in the academic tunnel outside of the Customer Service Center will occur. The work will be performed during the hours of 10:00 PM and 6:00 AM. There will be no through access in this area of the tunnel during the posted work hours while the tunnel work is being performed. |
More Details |
Freedom Quad/Tricentennial Drive |
Extended Detention Basin at CNSE & Freedom Quad |
Estimated Start: 01/24/2011 |
Estimated End: 02/18/2011 |
The Fuller Road Management is expanding the detention basin behind Freedom Quad. The scope involves excavating the existing basin, installing a clay liner and running new pipe from College of Nanoscale Science and Engineering (CNSE) to the basin and out toward Fuller Road. Pedestrians will be re-routed to the north side of Tricentennial Drive and trafiic will be restricted to one lane when storm pipe is installed under the roadway. |
More Details |
Indian Quad Mahican and Montauk |
Emergency Hot Water Shutdown |
Estimated Start: 01/14/2011 |
Estimated End: 01/14/2011 |
Water main leak repair to building main supply lIne that provides cold water to restrooms in Mahican and Montauk Hall. |
More Details |
Indian Quad |
Emergency Hot Water Shutdown |
Estimated Start: 01/14/2011 |
Estimated End: 01/14/2011 |
Shutdown due to hot water mixing valve failure and replacement. |
More Details |
Colonial Quad - Buildings A & B water shutdown |
Collins Circle Parking & Sitework |
Estimated Start: 01/14/2011 |
Estimated End: 01/14/2011 |
Water service will be shut down at Colonial Quad to the Clinton (bidg A) & Delancey (bldg B) Buildings for 1 hour on 1/14/11. This shut down is needed to complete project related infrastructure work associated with the parking lots being created at Collins Circle. For a more details regarding this project please visit: Entry/Circle Site Work |
More Details |
Science Library |
Hot Water Shutdown |
Estimated Start: 01/12/2011 |
Estimated End: 01/12/2011 |
Shut down of hot water only to replace a leaking valve in the Garden Level. |
More Details |
Colonial Quad - Buildings A & B water shutdown |
Collins Circle Parking & Sitework |
Estimated Start: 01/10/2011 |
Estimated End: 01/11/2011 |
Water service will be shut down at Colonial Quad to the Clinton (bidg A) & Delancey (bldg B) Buildings. This shut down is needed to complete project related infrastructure work associated with the parking lots being created at Collins Circle. For a more details regarding this project please visit: Entry/Circle Site Work |
More Details |
Chemistry 3rd Floor |
Hot Water Shutdown |
Estimated Start: 01/08/2011 |
Estimated End: 01/08/2011 |
The hot water will be shutdown on the third floor of the Chemistry Building starting on 1-8-11 at 5:30 AM. It will be turned back on when the lab 140 valve is connected, which will be at approximately 7:30am on the same day. This will effect the third floor only. |
More Details |
Collins Circle Parking & Sitework |
Colonial Quad Loading Dock Parking Closure - Revision #1 |
Estimated Start: 1/10/2011 |
Estimated End: 1/11/2011 |
The parking spaces located at the Colonial Quad Loading dock will be unavailable for
the duration indicated above. The loading dock will remain in service, but access to the loading bays will be altered This closure of parking spaces and altering of loading dock bays is needed to complete project related infrastructure work associated with the parking lots being created at Collins Circle. For a more details regarding this project please visit: Entry/Circle Site Work |
More Details |
Dutch Quad |
Schuyler Hall MER: Asbestos Removal |
Estimated Start: 01/05/2011 |
Estimated End: 01/11/2011 |
Asbestos fittings and insualtion will be removed from multiple fittings and 2 domestic hot water tanks in the Dutch Quad H Building MER located on the loading dock. Access will be restricted to asbestos certified personnel only during times of removal. |
More Details |
Social Science |
Classroom Renovations - Asbestos Abatement |
Estimated Start: 01/03/2011 |
Estimated End: 01/12/2011 |
In conjunction with classroom renovation work, asbestos abatement will take place in SS 255 and 256 beginning January 3 and continuing through January 12. The bulk of the work will be done during off hours and there will be changes to access and egress on the second floor, north side of the Social Science building, during those times. There will be evidence of wood and plastic enclosures at the room entrances and an occasional orange citrus odor associated with cleansers. Additional asbestos abatement work will take place at select mixing boxes located in the tunnel below Social Science. |
More Details |