| Ten Broeck Hall Rehabilitation |
| Dutch Quad - No Parking |
| Estimated Start: 5/5/2008 |
| Estimated End: 3/9/2008 |
*** SEFCU Arena Road Closure ***
Roof installation on Ten Broeck Hall requires an adhesive to be sprayed in order to
secure the roofing membrane to the roof deck of the building. There will be some over
spray from the roof down to the ground.
To prevent spray mist on cars, parking will not be permitted opposite the staging site .
|
| More Details | Work Area Plan |
| Replace Fire Alarm System and Asbestos Abatement |
| Alumni Quad - Waterbury Hall |
| Estimated Start: 5/19/2008 |
| Estimated End: 8/11/2008 |
| We will be replacing the existing fire alarm system in Waterbury Hall with a new totally
addressable system. There will be minor asbestos abatement with this project. |
| More Details |
| Tuscarora Hall Abatement and Demolition |
| Indian Quad - Tuscarora Hall |
| Estimated Start: 5/19/2008 |
| Estimated End: 8/31/2008 |
| We will be removing all interior walls, equipment, utilities in Tuscarora Hall and also the
dining room / kitchen. This work is in preparation of the reconstruction of a new dining
facility and Residence Hall which will begin in September 2008. |
| More Details |
| Replace Fire Alarm and Asbestos Abatement Phase 2 |
| Dutch Quad - Stuyvesant Tower |
| Estimated Start: 5/19/2008 |
| Estimated End: 8/11/2008 |
| We will be completing the upgrade of the fire alarm system in Stuyvesant Tower this
summer. There will be a need for asbestos abatement to complete this work. |
| More Details |
| Replace Fire Alarm System and Asbestos Abatement Phase 1 |
| State Quad Tower |
| Estimated Start: 5/19/2008 |
| Estimated End: 8/11/2008 |
| We will be replacing the existing fire alarm system with a new totally addressable
system. We will also need to do some asbestos abatement work to complete this
project. |
| More Details |
| Replace Fire Alarm System and Asbestos Abatement |
| Indian Quad - Adirondack, Cayuga, Mahican, Montauk, Onondaga, Seneca Halls |
| Estimated Start: 5/19/2008 |
| Estimated End: 8/11/2008 |
| We will be replacing the existing fire alarm systems in all these buildings with a new
totally addressable system. There will be a need for some asbestos abatement work to
accomplish this work. |
| More Details |
| Replace High Temperature Heat Exchangers |
| Indian Quad - All Buildings |
| Estimated Start: 5/19/2008 |
| Estimated End: 8/11/2008 |
| We will be replacing all the heat exchangers in every building on Indian Quad this
summer. Work will be isolated to the mechanical rooms in all buildings. |
| More Details |
| Domestic Hot Water Service Replacements |
| Physical Education Building |
| Estimated Start: 4/21/2008 |
| Estimated End: 4/21/2008 |
| Contractors and the University Support Staff will be shutting off the Domestic Water and
Hot Water to the PE building to allow reconfiguration of the piping. During the
shutdown, there will be no Domestic Water and Hot Water available in the building. |
| More Details |
| Domestic Hot Water Service Replacements |
| RACC Building |
| Estimated Start: 4/17/2008 |
| Estimated End: 4/17/2008 |
| Contractors will be shutting off the Domestic Hot Water to the RACC building to allow
reconfiguration of the piping and installation of a new hot water mixing valve. During the
shutdown there will be no Hot Water available in the building. |
| More Details |
| Elevator Renovations |
| Academic Podium & Physical Education Buildings |
| Estimated Start: 4/16/2008 |
| Estimated End: 4/18/2008 |
| The following elevators will be taken out of service for approximately fifteen minutes
each for the purpose of gathering engineering data: Humanities, Education, Physics,
Chemistry, Earth Science, Fine Arts, Business Administration, Social Science, Lecture
Center #1, and Physical Education. |
| More Details |
| Entry Plaza Reconstruction |
| Entry Plaza |
| Estimated Start: 4/15/2008 |
| Estimated End: 7/31/2008 |
| Work will continue leading to the completion of the Plaza in Summer 2008 - including
the installation of the water feature, historic pavers, additional lighting, grading, sod and
irrigation systems. Update notices will be distributed as needed. |
| More Details |
| Domestic Hot Water Service Replacements (Revised) |
| RACC & PE BUILDINGS |
| Estimated Start: 3/25/2008 |
| Estimated End: 3/26/2008 |
|
Due to changing weather conditions, the timeframe for the shutdown has been revised
to March 25 and March 26.
Contractor to Install Hi Temp Tap Valves at PE
Most Affected - No domestic hot water for Physical Education.
Also Heat in Physical Education- (By closing outside air dampers. The building
generally will remain reasonably comfortable.)
RACC Heat - air handlers will circulate air in the building to keep it warm, but at a lower
temperature.
There would be no loss of Domestic Hot Water at the RACC.
|
| More Details |
| Site Utilities Study - Hydrant Flow Testing |
| Uptown Campus |
| Estimated Start: 3/27/2008 |
| Estimated End: 3/27/2008 |
| The consultant in coordination with the campus staff will be performing hydrant flow
testing. The tests will aid in the capacity assessment of the campus domestic water
system.
While this work should have minimal, if any, affect on the University community; testing
may affect color of domestic water. If you experience this condition; please contact the
Customer Service Call Center at 2-3480.
|
| More Details |
| Construct Athletic Artificial Turf Fields - Phase 02 (Lacrosse) |
| John R. Fallon Field |
| Estimated Start: 3/10/2008 |
| Estimated End: 3/12/2008 |
| *** SEFCU Arena Road Closure ***
The main access road from University Drive West will be partially closed to allow for the
installation of a new sanitary line system across the roadway. Access to SEFCU Arena
parking will be available through the south entrance drive.
Timeframe for all work is weather dependent.
|
| More Details | Work Area Plan |
| Autoclave At The Animal Facility |
| Life Sciences Research Building |
| Estimated Start: 2/25/2008 |
| Estimated End: 3/10/2008 |
| We will be removing a section of concrete block wall and installing a floor drain along
with plumbing and electrical utilities to support a new autoclave being installed at the
Animal Facility.
|
| More Details |
| Construct Athletic Artificial Turf Fields - Phase02 (Lacrosse) |
| John R. Fallon Field |
| Estimated Start: 2/18/2008 |
| Estimated End: 9/30/2008 |
Construction of a steel-frame bleacher seating complex with press box adjacent to the
existing artificial turf lacrosse field at the University’s athletic complex. Construction
shall include but is not limited to; sitework for the new seating complex, installation of a
new sanitary line system, construction of new landscape features and surfaces, new
electrical services, plantings and other landscaping, and site infrastructure supporting
this work and future expansion.
All buildings in and around the site, including the lacrosse and field hockey fields, will
remain operational throughout the construction period.
|
| More Details |
| Entry Plaza Reconstruction |
| Entry Plaza |
| Estimated Start: 6/4/2007 |
| Estimated End: Late October |
| $4 million plan for the Entry Plaza, the main gateway of the University for visitors and the campus community. Plans for the three-acre space call for a park-like setting with more green space, ornamental trees and gardens, fountains and bench seating. |
| More Details | Work Area Plan |
| Ten Broeck Hall Building Renovation |
| Ten Broeck Hall |
| Estimated Start: 12/20/2007 |
| Estimated End: 8/22/2008 |
This building will undergo a complete gut renovation and receive all new electrical, plumbing, HVAC systems, new roof, and windows. The building will be converted back to a residence hall and is estimated to be ready for students for the Fall of 2008.
There will be NO PARKING in front of Ten Broeck Hall during renovation. Please see the attached drawing for details of the site staging area.
|
| More Details | Parking Restrictions |
| Perimeter Road Stop Sign |
| Perimeter Road, south side of campus |
| Estimated Start: 10/26/2007 |
| Estimated End: 3/30/2008 |
Please note that a Stop Sign has been temporarily installed on Perimeter Road at the intersection of the RACC parking lot and Perimeter road.
Please obey all traffic control signs.
|
| More Details |