Featured Project

Husted Building Rehab

The Husted construction continues to move forward. Much of the outside work nears completion including the entry stair, entry ramp and loading dock. On the inside of the building, most of the walls have been sheathed with drywall, window walls have been installed, bathrooms have been tiled, and the terrazzo floor in the lobby has been laid in. We continue to move forward steadily and become more excited as the building begins to take shape.

Project Progress (as of 4/30/09)










Details:
  • Start: March 2007
  • Est. End: June 2009
  • Contact: David Ono
  • 442-3434