Check List for Contractors
The purpose of this check-off list is to assist university personnel in assessing contractor compliance to state and federal regulations that address occupational and environmental safety.
YES / _ NO
Lockout/Tagout
_____ /_____
1. Does the contractor have a written LOTO Program that they can provide to the University?_____/_____2. Are the contractor’s employees provided with locks and tags?
_____ / ____3. Will the University employees need to lockout energy sources in conjunction with the contractor?(If yes – then the University must provide the contractor with a copy of our LOTO Program and notify all parties involved that LOTO will occur.)
Confined Space Entry
_____/_____4.Will entry into a permit required confined space be necessary?
_____ /_____5.Does the contractor have a formal CSE program in accordance with OSHA requirements?
_____/_____6.Does the contractor have the necessary equipment to safely enter the space?
_____/_____7.Has the University supplied information on the hazards associated with the space(s)? (All permit confined space entries on campus must be logged in with the Power Plant prior to entry.)
Fall Protection
_____ /_____8.Will the contractor be working on a roof?
_____ /_____9.Does the contractor have a formal fall protection program in accordance with OSHA requirements?
____ /_____10.Does the contractor have the necessary fall protection equipment to safely perform the tasks?
____ /_____11.Is scaffolding going to be used?
____ /_____12.Does the contractor have a scaffold- competent person?
____ /_____13.Will the scaffolding be secured so as to discourage student access?
Excavation Work
_____/_____14.Does the contractor have a Trenching/Shoring policy in accordance with OSHA requirements?
_____/_____15.Does the contractor have a soils competent person on staff?
_____ /_____16.Does the contractor have the equipment necessary to safely excavate/trench?
_____ /_____17.Is the contractor prepared to secure any open excavation that may be considered an attractive nuisance?
Chemicals
_____/ _____18. Does the contractor plan to use ANY chemical products on University property?
_____/_____19.Has the contractor provided the University with the Material Safety Data Sheet(s) ?
_____/_____20. Has EH&S been sent copies?
Asbestos And Lead
______/_____21. Has the area been inspected for PACM?
______/ _____22. Has the contractor trained his/her employees in asbestos recognition hazards?
______/ _____23. Is sampling for ACM necessary?
______/ _____24. Has prior sampling of this area been done and are the results available?
______/ _____25. Will paint be disturbed during this project?______/ _____26. Is there a possibility of lead paint?
______/ _____27. Has testing been done?